Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Clean Air

    It is a very great pleasure indeed to participate in this interesting and important seminar. My two visits to Australia in the past have been extremely pleasant and this one is equally so. My task i

    Jan 1, 1971

  • AUSIMM
    X-ray Computed Tomography – a Geometallurgical Tool for 3D Textural Analysis of Drill Core?

    By M A. Jardine, J A. Miller, M Becker, M Harris

    "Although the role of texture has been increasingly recognised as a geometallurgical indicator of ore characteristics and their variability, the ability to appropriately quantify and correlate it with

    Jun 15, 2016

  • AUSIMM
    The Newcrest Telfer Hoisting System ù A Very Large Friction Hoist Installation

    The hoisting system at the Newcrest Telfer mine is designed for a final duty of 7.35 million tonnes per annum at a hoisting distance of 1450 m. In terms of hoisting capacity (t/h) times hoisting dista

    Jan 1, 2005

  • AUSIMM
    Mathematical Modelling and On-Line Control of Hydrocyclones

    By Eren H

    For a hydrocyclone of fIXed geometry, DC, Di, DO and ? are constants, the variable parameters affecting the performance are Qi, Fi, Du and H. (See Appendix 2 for definition of symbols).The relationshi

    Jan 1, 1990

  • AUSIMM
    The Nena high sulphidation copper-gold system, Frieda River Complex, Papua New Guinea

    By Corbett GJ, Leach TM

    The Nena Cu-Au high sulphidation deposit has formed within the Frieda River Intrusive Complex in association with a major dilatant structure. Multiple intermediate intrusives of Miocene age are locali

    Jan 1, 1994

  • AUSIMM
    Application of three lines model in resource and reserve estimation and reporting

    By D Hope, D K. Mukhopadhyay, J D. Harvey

    South32 (S32), a globally diversified mining and metals company, is listed on securities exchanges around the world (ASX, JSE, LSE), with its primary listing being on the Australian Securities Exchang

    May 24, 2023

  • AUSIMM
    Is Ion-Exchange Technology for Gold Extraction Ready for Commercialisation?

    By J S. J van Deventer, D C. Shallcross

    New developments are taking place in the recovery of gold from leached pulps that are based upon the adsorption of the metal cyanide species onto ion exchange resins. Despite the success of several re

    Jan 1, 1998

  • AUSIMM
    Description of the Mond By-Product Gas Plant

    THE plant is one of the usual type of Mond plants, and contains no new features worthy of comment. A brief description of the process, however, with a few remarks on the working of the plant, may prov

    Jan 1, 1918

  • AUSIMM
    Draw Control at Premier Mine

    By K Nesbitt

    Draw control at Premier Mine is considered important to avoid conditions of isolated draw, which results in early waste ingress, compaction of the kimberlite ore and loss of ore reserves. The Premier

    Jan 1, 2000

  • AUSIMM
    A New Method for Sampling from High Capacity Screens

    By B W. Atkinson

    Full-stream mechanised sampling apparatus, that collect a full cross-sectional increment from the complete screen discharge, will always be the preferred option for sampling screen overflows. However,

    Aug 21, 2012

  • AUSIMM
    Paper No. 125. Notes on The Desulphurisation of Slimes by Heap Roasting as Conducted by The Broken Hill Proprietary Company, Limited.

    Before proceeding to the main portion of the above subject, a few remarks as to the general question of our mill slimes seem called for, and, with this in view, it is intended to briefly refer to the

    Jan 1, 1903

  • AUSIMM
    Geology, Alteration and Mineralisation of the Tampakan Copper Deposit

    By A Madera, R Watt

    The Tampakan deposit is a strongly telescoped high-sulphidation-epithermal/ porphyry deposit pair which is hosted by a sequence of probable Pliocene age subaerial andesite flows. These host units lie

    Jan 1, 1999

  • AUSIMM
    Multiparallel Fan Method to Prevent Significant External Air Leakages through a Goaf Area of a Shallow Covered Coalmine

    By F Wu, H Wang, W Chen

    A pressurisation method with multiparallel fans has been adopted at HongLiuLin Coalmine to control the significant external air leakage through the goaf area of coalface 15207. Potential damaging effe

    Aug 31, 2015

  • AUSIMM
    The Geology and Gold Mineralisation of the Batman Deposit, Mt Todd Project, NT

    By Hein K. A A

    The Mt Todd Gold Project is located 42 km northwest of the township of Katherine within the Northern Territory of Australia. It is situated in the southeastern portion of the Pine Creek Geosyncline.

    Jan 1, 1994

  • AUSIMM
    Evaluation of Pyrrhotite from Selected Ni and Platinum Group Element (PGE) Ore Deposits and the Influence of its Mineralogy on Flotation Performance

    By D Bradshaw, J R. R de Villiers

    The non-stoichiometric sulfide mineral pyrrhotite (Fe(1-x)S), common to many nickel and platinum group element (PGE) ore deposits, occurs in varying crystallographic forms with the different types exh

    Jan 1, 2008

  • AUSIMM
    Heavy Medium Separation at Iscor's Sishen Iron-Ore-Mine

    The Sishen iron-ore-mine produces 3 pro= ducts with size gradings of 25 to 8 mm, 11 to 5 mm and 5 to 0,2 mm and has a product capacity of 20 Mtpa. Ore is produced at an average Fe content of 66,2

    Jan 1, 1987

  • AUSIMM
    The Commercial Application of the New Two-Stage Jones WHIMS Process for Martitic Iron Ores at the Fßbrica Mine of Ferteco Mineratpo SA, Brazil

    By Heyer T, Wasmuth H-D

    The concentrator plant of Fahrica Mine, that started production in 1977, was using nine Jones wet high intensity magnetic separators (WHIMS) of the standard type DP 317 with a 1.5 mm gap width for t

    Jan 1, 1993

  • AUSIMM
    Common Geological Characteristics of Prominent Hill and Olympic Dam ù Implications for Iron Oxide Copper-Gold Exploration Models

    The Prominent Hill copper-gold deposit is located approximately 150 km north west of Olympic Dam, on the southern margin of the Mount Woods Inlier in South Australia. Its discovery in November 2001 re

    Jan 1, 2004

  • AUSIMM
    The Penna Hoisting Plant ù Opportunities and Issues Related to Using Lower Rope Selection Factors

    By C Quirion

    Agnico-Eagle Mines Limited, Laronde Division, operates the deepest single-lift shaft in the western hemisphere. The initial Penna hoisting plant was designed for a production rate of 1800 tonnes per d

    Jan 1, 2005

  • AUSIMM
    Online FTIR analysis for improved efficiency in alumina production

    By K Haroon, J D. Speed, S P. Wood

    Online analysis of continuous and batch processes has seen a dramatic increase in recent years, with examples ranging from petrochemicals to pharmaceuticals, to industrial biotechnology and food and d

    Aug 24, 2022