Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Sinking No. 3 Elliptical Shaft at North Broken Hill Limited Broken Hill, N.S.W.

    This paper describes the operation involved in the sinking of a concrete-lined elliptical-shaped shaft at North Broken Hill Limited.Major factors such as geological features, future ventilation, ore h

    Jan 1, 1956

  • AUSIMM
    Tunnelling Design on the Northside Storage Tunnel Project

    By A Quigley

    The Northside Storage Tunnel Project in Sydney includes over 20 km of TBM driven tunnels, over 3 km of declines and major caverns and pump rooms. The paper describes methods used for design on the pro

    Jan 1, 1999

  • AUSIMM
    Golden Cross Mine - Gold Mining in a Sensitive New Zealand Environment (7e135577-c7a0-4219-a3fe-f7032e5b9261)

    The Golden Cross mine is situated in a sensitive environmental setting on the North Island of New Zealand, about 150 kilometres south-east of Auckland and about 8 kilometres NW of Waihi. The mine is

    Jan 1, 1995

  • AUSIMM
    Size by Size Analysis of Operating Characteristics of Jameson Cell Cleaners at the Bajo De Alumbrera Copper/Gold Concentrator

    By A Murphy, D Lauder, J Miranda

    Minera Alumbrera Limited operates the Alumbrera concentrator, treating a nominal 80 000 tpd of porphyry gold/copper ore. It is located in Argentina, 1200 km north-west of Buenos Aires in Catamarca Pro

    Jan 1, 2000

  • AUSIMM
    Leach Residue and Pregnant Liquor Separation – Process and Capital Comparison of Counter-Current Decantation and Counter-Current Washing with Vacuum Filtration

    By R Klepper

    Separation of leach residue suspended solids from pregnant liquor solution is an important step in hydrometallurgy flowsheets. Alternative flowsheet options are counter-current decantation (CCD) thick

    Aug 8, 2011

  • AUSIMM
    Sampling Correctness ù A Comprehensive Guideline

    Reliable sampling practices are the key to optimising the market value of a mining or chemical companyÆs stock. As a result, reliable sampling standards are needed. However, current standards on sampl

    Jan 1, 2005

  • AUSIMM
    Open Strip Pitwall Instability at Goonyella Mine-Causes and Effects

    By Richards BG, Komdeur W

    Instability in spoil piles and in high wall slopes in natural overburden has been ex- perienced at Utah's Goonyella Mine since com- mencement of operations in early 1971. Annual production target

    Jan 1, 1978

  • AUSIMM
    Some Factors Affecting the Coulombic Efficiency of Zinc Electrowinning

    By Frazer E. J, Lwin T

    Measurements of coulombic efficiency (QE) for zinc electrodeposition were carried out under mass-transfer-controlled conditions using a rotating disc electrode in synthetic acidic zinc sulphate so

    Jan 1, 1987

  • AUSIMM
    A Poorman's Field or a History of Goldmining in East Nelson and Marlborough

    East Nelson and Marlborough, in the northeast of the South Island, contain a wide variety of metallic minerals, including gold, silver, copper, chromite, antimony and scheelite, but no sustained metal

    Jan 1, 1993

  • AUSIMM
    The Glass Sand Industry in Australia: Production, Processes and Markets (b11bdfa0-ef26-4950-bf21-8765ff14b0ec)

    By Richards RG

    The Australian glass sand industry produces some 2.8 million tonnes per annum of silica sand, of which about 2.0 million tonnes are exported and the rest is for the domestic market. Approximate produc

    Jan 1, 1990

  • AUSIMM
    A methodology for modelling dense medium cyclones

    By Manlapig EV, Davis JJ

    A methodology for modelling dense medium cyclones is presented for cyclones operating under conditions which avoid particle interference or apex crowding. Particle interference and apex crowding a

    Jan 1, 1986

  • AUSIMM
    Investigation and Construction of Tunnels in Tamalia Limestone, Perth, Western Australia

    By Klenowski G, Gilmour G. A

    The Metropolitan Water Supply, Sewerage and Drainage Board, Perth, has recently con- structed two major sewerage tunnels in the metropolitan area and a further one is under construction. These tunne

    Jan 1, 1981

  • AUSIMM
    An Analysis of the Performance of Multi-Stage Grinding and Cyclone Classification Circuits

    By Lynce AJ

    A method has been developed for the prediction 'of 'the- . performance of a multi-stage grinding=cyclone classification circuit of any degree of complexity on any ore for a wide range `of

    Jan 1, 1964

  • AUSIMM
    A Review of Fatal Outburst Incidents in the Bulli Seam

    By Singh RN

    The Bulli Coal Seam, located in the Illawarra Coalfield of New South Wales, has a long and varied history of sudden outbursts. From available information this problem has resulted in twelve fatalities

    Jan 1, 1998

  • AUSIMM
    A Combined Sorption-Flotation Technology for Gold Recovery From Cyanide Solutions and Pulps

    A viable flow sheet of the sorption-flotation technology for gold recovery from low-grade ores and concentrates using powdered activated carbon modified by organic compounds as the sorbent-bearer has

    Jan 1, 2005

  • AUSIMM
    Social Licence in Real-time – Using Dynamic Methods to Support a New Kind of Community Relationship

    By N Boughen, K Moffat, L Brooks, A Zhang

    In 2015, Ernst and Young (EY) ranked socio-political license to operate (SPLTO) as the fifth greatest challenge to the mining sector (EY, 2015). The EY report asserts that SPLTO will continue to prese

    Jun 28, 2016

  • AUSIMM
    Assessing New Airflow Requirements at the Meikle Mine ù A Case for an Additional Main Centrifugal Fan and the Inclusion of Evaporative Cooling Spray Chambers for Airflow Quality Improvement

    Ventilation challenges are often encountered when an underground mine expands to new zones and it often is the case to make a thorough review of the existing system and assess immediate and future air

    Jan 1, 2005

  • AUSIMM
    On The Relationship Between Quartz in the Coal Seam and Quartz in the Airborne Respirable Coal Dust

    By Mutmansky J. M, Organiscak J, Qin J, Bhaskar R

    The results of a two-year research study into the relationship between quartz dust levels in host material and in respirable dust in continuous mining sections are presented in this paper. The exp

    Jan 1, 1988

  • AUSIMM
    The Mine Manager's Toolkit

    As the surrounding environment continues to change and evolve, mine managers face a changing climate of expectations. TodayÆs mine managers must juggle competing pressures to deliver sound social, env

    Jan 1, 2006

  • AUSIMM
    Pre-Strip-Mining by Bucket Wheel Excavators

    Dragline performance drops considerably when chop-down and double handling of material is needed due to increasing overburden thick- ness or total pit depth. Beyond a certain pit depth the dragline

    Jan 1, 1981