Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Bauxite Mining in Water Supply Catchments ù Water Conservation and Quality Protection

    By D J. Cronin

    Alcoa World Alumina AustraliaÆs Huntly and Willowdale bauxite mines are located in the Darling Range of South Western Australia, which places their operations within PerthÆs surface water supply catch

    Jan 1, 2003

  • AUSIMM
    Can We Live Up to the Capacity Expectations WeÆre Predicting for Our Iron Ore Export Corridors?

    By P McGavin, R von Varendorff

    With the economic trend towards reduced capital spend, more stakeholders are focusing on improved operational efficiency and productivity. Advancements in achieving the optimum dollar-per-tonnage will

    Aug 12, 2013

  • AUSIMM
    The Changing Pattern of World Mining Investment and the Implications for Australia and Her Mining Industry

    Unprecedented political, economic, and social change throughout the world will have an increasingly profound effect on the dynamics of the world's mining industry. Analysis of the early financial

    Jan 1, 1993

  • AUSIMM
    Drilling Techniques for Investigation and Operation of Large Open Pit Coal Mines in the Latrobe Valley

    By Mountiney B

    The development and operation of three large open cut brown coal mines in the Latrobe Valley, Victoria, Australia, requires a wide range of drilling techniques for coal resource evaluation and strat

    Jan 1, 1989

  • AUSIMM
    The results of supplementary sampling to evaluate suitability of the instrumentation for monitoring of DPM concentration

    By S Sabanov

    Supplementary sampling of particulate mass concentration, the number concentration and the average particle diameter of nanoparticles using a TSI Dust-Trak DRX Aerosol Monitor, Naneos Partector 2 has

    Oct 12, 2022

  • AUSIMM
    An Integrated Approach Towards the Optimisation of Ventilation, Air Cooling and Pumping Requirements for Hot Mines

    This paper contends that optimisation of energy resources through active control and predictive simulation modelling is possible, and that such monitoring leads to large savings in the electricity cos

    Jan 1, 2005

  • AUSIMM
    Computer Animation of Hot Spot Development in Bulk Coal as an Aid for Training Coal Miners

    By B B. Beamish, M S. Kizil

    The processes that take place during the development of a heating are difficult to visualise. Bulk coal self-heating tests at The University of Queensland (UQ) using a two-metre column are providing g

    Jan 1, 2005

  • AUSIMM
    A Model-Based Methodology for Steady State and Dynamic Optimisation of Autogenous and Semiautogenous Grinding Mills

    By Lo YC, Pate WT

    In recent years there has been a great deal of interest in ways to optimise the performance of mineral processing plants. This paper describes a methodology developed for optimisation of autogenous

    Jan 1, 1993

  • AUSIMM
    Development of a Process Flow Sheet for Beneficiation of Indian Banded Haematite Quartz (BHQ) Iron Ore

    By B S. S Rao, S Chandra

    IndiaÆs iron ore mining industry is growing rapidly in order to augment the capacity to meet the unprecedented demand for the iron ore. Traditionally, much of Indian iron ore production came from expl

    Jan 1, 2007

  • AUSIMM
    Processing of Groote Eylandt Manganese Ores

    By Taylor R. K A, Berglin C. I K

    The manganese ore deposits at Groote Eylandt are quite variable both in regard to grade and physical cond- ition. In order to treat a wider range of these ores and to increase production a new prim

    Jan 1, 1973

  • AUSIMM
    Development of Techniques for the Study of Flash Smelting Reactions Using Differential Thermal Analysis and Thermogravimetry

    By Davies S. G, Jayaweera A

    The oxidation of nickel sulphide and copper sulphide concentrates, and coal, has been studied under non-ignition and ignition conditions using Differential Thermal Analysis (DTA) and Thermogravimetry

    Jan 1, 1985

  • AUSIMM
    Development of Innovative, Eco-Friendly and Economic Technologies for Wealth Processing at Hindustan Zinc Limited, Visakhapatnam

    Hindustan Zinc Limited (HZL) is one of the leading base metal producers in India. It operates a two-smelter Complex at Visakhapatnam, Andhra Pradesh. At this zinc-lead smelter zinc is manufactured by

    Jan 1, 2000

  • AUSIMM
    Resource Estimation Approaches for Several Precious Metal Deposits Developed by Placer Group on the Pacific Rim

    The process of resource estimation of large precious metal deposits is illustrated by reference to major deposits now being mined or developed by Placer.The estimation procedure commences with buildin

    Jan 1, 1990

  • AUSIMM
    Sampling for Anything - The Roles of Particulate and Time-Wise Material Heterogeneity in Sampling System Design

    In the last 100 years, statistical sampling theory for particulate materials has developed to a stage where sampling systems can be confidently designed to provide assay results of known and controlle

    Jan 1, 2002

  • AUSIMM
    Dewetting Kinetics on Silica Substrates ù Three-Phase Contact Expansion Measurements for Aqueous Dodecylammonium Chloride Films

    By L Grigorov, G J. Jame, A V. Nguyen

    The dewetting kinetics between a small air-liquid interface and a silica (negatively charged in water) planar surface in solutions of dodecylammonium chloride (cationic surfactant) has been investigat

    Jan 1, 2005

  • AUSIMM
    Research and Development in the Micron Research (W. A.) Solvent Procedure for Gold Elution from Carbon

    By Hinchliffe WD, Griffin A

    The desorption of gold from activated carbon is promoted by adding organic solvents to aqueous cyanide solutions. At 65-80¦ the elution of gold is fast and is not affected by water quality. The Micron

    Jan 1, 1984

  • AUSIMM
    Feasibility Study Estimation of In-Situ Resources and Recoverable Ore Reserves for the Boddington Gold Mine

    By El-Ansary M

    Estimation of in-situ resources and recoverable ore reserves for the Boddington Gold Mine feasibility study was done by applying an essentially "classical" ore reserve method. This relied completely

    Jan 1, 1987

  • AUSIMM
    The Development of a Continuous Copper Drossing Process for Lead Bullion (e832ca00-fad1-4d25-a701-ac8072a9e7d1)

    The first stage in the refining of lead blast furnace bullion is the removal of copper and is normally done as a batch process in open kettles.A number of attempts have been made to establish continuo

    Jan 1, 1963

  • AUSIMM
    Developments in the Use of Steel Fibre Reinforced Concrete (SFRC) in Precast Segments for Tunnel Linings

    By J Brown, C Roberts

    The scope of this paper is to recount the development of segmental linings used in tunnel construction, starting with its inception as an improvement to the brick-lined tunnel approach of Brunel in En

    Jan 1, 2008

  • AUSIMM
    The Geometry of the Heavy Sulfide Zone - A Challenge for Mine Planning and Geotech at Grasberg

    By S C. Sc, J Young, N Belluz, D Nicholas

    The heavy sulfide zone (HSZ) of the Grasberg deposit has the geometry of a funnel and is located at the contact of the mineralised intrusive and the relatively barren sedimentary rock types. The geome

    Jan 1, 2007