    Performance and Cost Comparison of Materials Used in Design and Fabrication of Hydrometallurgical Equipment

    By T. Johnson, K. Lambrych, D. Kelley

    Materials for construction of equipment used in hydrometallurgical plants are selected based on a combination of their ability to perform as required in aggressive process environments as well as thei

    Jan 1, 2015

  • CIM
    Information technology in mining: An overview of the Mining IT User Group

    By M. G. Lipsett

    "The Mining Information Technology User Group considers information to be a strategic enabler to improved business performance in mining. This ad hoc group has been meeting since 2000 to share knowled

    Jan 1, 2003

  • CIM
    Considerations regarding the definition of remotely located integrated cogeneration plants. Part 1

    By D. Berkley

    "The competitive pressure, the increasing energy costs and the environmental regulations impose substantial challenges to the definition of power plants serving industrial facilities. Primary mining a

    Jan 1, 2003

  • CIM
    Leveraging Bim for Automated Fault Detection in Operational Buildings

    By A. Golabchi

    Building Information Modeling (BIM) is an increasingly popular method for generating and managing facility information during the life cycle of a building, ranging from facility conceptualization, thr

    Aug 1, 2013

  • CIM
    Massive sulfide deposits in Northwestern Quebec

    By Sergio Cattalanl, Francis Chartrand

    "The geology and origins of volcanogenic massive sulfide (VMS) deposits in the Abitibi belt of northwestern Quebec have been the subject of discussion since the discovery of the Horne orebodies in Nor

    Jan 1, 1990

  • CIM
    The Geology of the Rabbit Lake urnnium deposit, Saskatchewan

    By Thomas H. Heine

    "The Rabbit Lake uranium deposit is located at 58° 11’00”N.. 103°42'36""W., close to the west side of Wollaston Lake, and approximately 800 km north of Saskatoon. The orebody is hosted by Aphebian Wol

    Jan 1, 1986

  • CIM
    New Innovations for Dewatering Using Teepee™ Panels on Vibrating Screens

    By A. D. Yell

    "Recovery of water is always a major factor in the Beneficiation process. As Preparation Plants become larger the recovery of water for reuse, is a critical cost consideration. Tema Isenmann Inc in co

    Jan 1, 2017

  • CIM
    Sustainable Geothermal Energy Recovery from Mines

    By Charlie Graham, Helen Shang, Ashley Scott, Andrew Hall

    "Approaches to Energy Recovery• Upgrading for electricity generation - steam turbines• Direct extraction- process improvement or space heating- support medium for animal or plant growth– fish or micro

    Jan 1, 2012

  • CIM
    Analysis of results from a PFC measurement campaign

    By P. Desclaux, A. Gosselin

    "In 1999, PFC measurements were carried out at Alcan smelters as part of a large measurement campaign led by the Canadian Aluminium Association. Side worked prebake (SWPB) and horizontal stud Söderber

    Jan 1, 2002

  • CIM
    Hoisting at Alwinsal

    By W. D. Breil, C. B. Ison

    A collection of general performance data relating to the G.H.H. - Gutehoffnungshiitte multi-rope friction hoist will be discussed together with some aspects of the following: overspeed supervision by

    Jan 1, 1972

  • CIM
    Efficient Management of Pot Energy Consumption for Aluminum Production in Alcoa

    By C. R. Kato, G. Proulx

    "Within the continuous scenario of reduced aluminium price and plants production costs increase, the energy consumption optimization in the aluminum electrolytic pots continues as the main focus for t

    Jan 1, 2016

  • CIM
    Acid and metal salt recovery by short bed ion exchange

    By C. J. Brown

    Since its commercialization thirty years ago, the Recoflo® short bed ion exchange process has been extensively utilized for the recovery of a wide variety of acids and metal salts. In addition to a re

    Jan 1, 2004

  • CIM
    Noranda Inc. - Heath Steele Mine

    By David Scott, Denis V. Lachance, Daniel Marcotie

    "LocationThe Heath Steele mine is located 50 km northwest of Miramichi, New Brunswick.Brief DescriptionHeath Steele is a 2700 t/d, copper-lead-zinc operation which employs conventional crushing, grind

    Jan 1, 2000

  • CIM
    Cold-Wire Tandem Submerged Arc Welding: A Novel Technique for Pipeline Manufacturing

    By M. Mohammadijoo, J. B. Wiskel, D. G. Ivey, S. Kenny, H. Henein

    Cold-wire tandem submerged arc welding (CWTSAW) has recently been developed as a novel welding technique to replace the conventional tandem submerged arc welding (TSAW) process and improve the product

    Jan 1, 2015

  • CIM
    Construction Work at Flin Flon

    By W. A. Green

    Introduction While pilot-mill operations were being carried on at Flin Flon, as described by R. E. Phelan (1), a detailed topographic map was being made of the area in the vicinity of the ore-body fo

    Jan 1, 1935

  • CIM
    Data Acquisition during Ground Freezing at Thyssen Mining’s Newmont Leeville Turf #3 Ventilation Shaft Project

    By G. A. Witwicki

    "The Thyssen Mining Group of Companies has successfully applied ground freezing technology to numerous projects throughout Europe and North America for over 100 years. Recently, the aspect of data acq

    Jan 1, 2015

  • CIM
    Measurements of deformation and stress variations in mine pillars

    By A. P. Bois, K. Saleh, A. Ghorbal, V. Hajiabdolmajid, G. Ballivy

    "The knowledge of the initial stress field is not always sufficient to ensure the stability of mining stopes due to the high-stress variations generated by mining. Monitoring of these openings is then

    Jan 1, 2003

  • CIM
    Low Carbon Coal Mining ? A Contradiction or an Opportunity?

    By J. G. Bennett

    Coal consumption has increased globally by 57% over the last ten years. Underground mining typically provides coal of the highest calorific value and accounts for the greatest proportion of production

    Aug 1, 2013

  • CIM
    Enhancing Blast Efficiency and Fragmentation Through PSD Analysis and first comminution stage Optimization

    By N. F. Faria, F. Monteiro, B. O. Taiwo, A. Palangio, D. Fonseca, J. Manuel

    This paper explores the interpretation and application of Particle Size Distribution (PSD) curves in optimizing blast design and enhancing downstream operations. The study looks at important factors l

    May 4, 2025

  • CIM
    Utilization of gold mill tailings as a secondary resource in the production of a high strength total tailings paste fill

    By L. M. Amaratunga, G. G. Hein, D. N. Yaschyshyn

    Fine tailings produced in the milling process have traditionally been disposed of in tailings ponds. Attempts have been made to use these fine tailings in backfill, however, to date the majority of ba

    Jan 1, 1997