Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Old principle: new concept

    By Derek Harvey

    "The paper briefly describes the development of the Eickhoff ESA60 roadcutter which is based on the old and well used principles of the shearer loader. It is intended to show that the machine offers a

    Jan 1, 1985

  • CIM
    Advancing the New Afton Copper-Gold Project

    By Kevin Ross

    Feasibility Study Team Processing / Engineering?Hatch, Vancouver Mining / Reserves?Australian Mine Consultants, Brisbane Geology / Resources?Roscoe Postle Associates, Vancouver Environmental / Per

    May 1, 2006

  • CIM
    A New Approach for Characterisation of Densely Fractured Rock Masses Using Artificial Neural Networks and Principal Component Analysis

    By R. B. Kaunda

    One fundamental requirement for surface and underground rock engineering is the ability to characterise the rock mass. An accurate characterisation of the rock mass allows rock engineers to optimize d

    Jan 1, 2015

  • CIM
    Creep Response of the AE44 Alloy at 125 and 150°C

    By S. Spigarelli

    The creep response of the AE44 magnesium alloy was studied by means of constant load creep tests carried out at 125 and 150°C, obtaining that at the latter temperature the minimum creep rate observed

    Jan 1, 2006

  • CIM
    Remediation of Hazardous Industrial Wastes

    By S. Xu, A. Ramesh, F El-dabbagh, Z. Fang, A. Sobhy, J. A. Kozinski

    Waste remediation is a goal that will be driven forward by economic conditions. As the cost of waste disposal increases, new methods of waste reduction will become economically attractive, and will be

    Jan 1, 2004

  • CIM
    Advances in Process Development for Concentration of Rare Earths and Niobium for Geomega’s Montviel Carbonaceous Ore

    By T. Negeri, M. Boisclair, A. Bouajila

    CanmetMINING has been working on process development for separation and concentration of rare earth bearing minerals from various ores. Among others, the flowsheet development for the Montviel Rare Ea

    Jan 1, 2014

  • CIM
    Environmental Consequences of Mining in the Beijing West Mining Area

    By Kan Xing

    This paper introduces common detrimental consequences to the environment from mining in the Beijing West Mining Area. For example, ongoing mining operations can cause the following environmental deter

    Aug 1, 2013

  • CIM
    The Merelani Graphite-Tanzanite Deposit, Tanzania: An Exploration Case History (f453b99b-0704-440a-8188-3812d53498c1)

    By R. J. Chase, C. Davies

    "The Merelani graphite-tanzanite deposit is located in northeast Tanzania, 14 kilometers south of Kilimajaro International Airport and in close proximity to the towns of Moshi and Arusha. The graphite

    Jan 1, 1994

  • CIM
    Geomechanical Study of Fractured Carbonate Reservoir –Part II, 3D Wellbore Stability Analysis and FMI Image Logs Calibration

    By M. Hozayen, Q. Ni, E. S. Radwan, P. Nawrocki, A. Jebbouri

    "A major geomechanical study was conducted for one of the UAE onshore oil fields with the purpose of studying reservoir rock properties and stress distribution, based on which a 3D coupled reservoir g

    Jan 1, 2015

  • CIM
    Flow Behavior of Aluminums Alloys in Semi-Solid State Using Backward Extrusion Technique

    By F. Hosseini

    Shaping of metals by thixoforming relies on the unusual flow behavior of semisolid slurries containing nondendritic solid phase. The Flow behavior of metallic alloys containing both solid and liquid p

    Oct 1, 2011

  • CIM
    Novel materials for aluminium electrolysis cells

    By W. M. Silva, Bittencourt. L. R. M.

    Three newly developed alumino-silicate refractory bricks for use in safety lining of aluminum electrolysis cells were compared to one commonly used bricks for the same application. It was shown that t

    Jan 1, 2004

  • CIM
    Density Functional Theory Simulation Study on the Hydroxylated Hematite Surfaces: Understanding its Reactivity

    By Waghmarem Umesh V., Vinay Jain, Pradip, Beena Rai

    "The hematite surface plays a vital role in several processes of industrial and technological importance, such as, in beneficiation of iron ores, catalysis, and geochemical processes. Therefore, it is

    Jan 1, 2016

  • CIM
    Technology: Is it working for you?

    By C. Graham

    Mechanisation has been a predominant theme of the past 50 years in the mining industry, particularly underground mining. As the level of technology employed has increased, the anticipated productivity

    May 1, 2004

  • CIM
    Agglomeration for Copper Heap Leaching (2007)

    By K. A. Lewandowski

    Agglomeration of ore used in heap leaching allows for the immobilization of fine particles that would otherwise migrate and cause permeability problems in the heaps. For copper ore, binders are needed

    Jan 1, 2007

  • CIM
    Refractory selections for aluminum cast houses

    By M. DeLucia

    "Over the past 15 years, technical innovations have improved the properties and performance of monolithic refractories. As these improvements have occurred, aluminum cast-house refractory selections h

    Jan 1, 2004

  • CIM
    An expanding family of flow-through shares

    By Robert B. Parsons

    "With several hoots of the whistle, Canada's fiscal engineers are once again cranking up the income tax locomotive, in an effort to inject new stimulus into a stubborn economy. And once again, ad

    Jan 1, 1984

  • CIM
    High Pressure Grinding Rolls Modelling with Population Balance Models Applied to Tantalum Ore

    By Pura Alfonso, Sarbast Hamid, Hernan Anticoi, Eduard Guasch, Josep Oliva

    "Av. Bases de Manresa 61-63, Manresa (08242) Barcelona, SpainTantalum is a strategic metal and an improvement of the mineral processing is an important issue. The main objective of this work is to opt

    Jan 1, 2016

  • CIM
    Flow-through shares-a good deal better

    By Robert B. Parsons

    "Recent amendments to the so-called ""flow-through share"" rules in our income tax legislation have given a new lease on life to this once popular investment vehicle.The original ""Dome funds"" for ex

    Jan 1, 1983

  • CIM
    Méthode hybride de minage long trou et récupération de piliers de niveau dans les chantiers de la mine Géant Dormant

    By Patrick Chabot

    Ce document présente une méthode hybride de long trou favorisant une méthode de minage initiale par chambre-magasin et complétée par une méthode de minage long trou. Cette méthode a été adaptée suite

    Feb 1, 2008

  • CIM
    Keymet Mine

    By A. L. MacAllister

    "Keymet Mine lies on the Elmtree River 4 miles west of Petit Rocher and about 18 miles northwest of Bathurst, Gloucester County, New Brunswick. A good gravel road runs through the property.The deposit

    Jan 1, 1949