Capitol Area East End Complex Blocks 171 Through 174 Sacramento, California: A Case History Involving The Application Of APGD And APG Piling Methods ? IntroductionBy Brian R. Zuckerman
The Capitol Area East End Complex is currently being constructed under contract with the State of California Department of General Services on two sites adjacent to the grounds of the California State
Jan 1, 2002
-
Once Again, Engineering And Contractor Tenacity Overcome Tough GeologyBy John E. Lens
How much trouble can narrow vertical fissures in bedrock cause on a shallow bedrock site? Enough trouble so end-bearing H-piles range between 8 and 100 feet long in a single pile cap and tiebacks ran
Jan 1, 2006
-
Design And Construction Of Tower Foundations For 345kV Youngheung Marine Transmission LineBy Suk han Jang
This paper describes the tower foundation design and construction experience for the 345kV Youngheung marine transmission line, which has been in commercial operation in Korea since July, 2004. This
Jan 1, 2007
-
The Utilization Of Static-Load Piledriving Near Structures That Are Sensitive To Vibration - Static-Load Piledriving: - Concept;By Robert A. Field
Static-Load Piledriving utilizes a hydraulic push to facilitate the installation of a pile. The pile is not rotated, impacted or vibrated. A smooth pushing force advances the pile incrementally into t
Jan 1, 1997
-
Augered Cast-In-Place (ACIP) And Drilled Displacement (DD) Pile Quality Control ? IntroductionBy Rudolph P. Frizzi
Quality control is essential for augered cast-in-place (ACIP) piles (also known as continuous flight auger (CFA) piles outside the United States) and drilled displacement (DD) piles since the pile is
Jan 1, 2004
-
Prediction Of Jet Grout Column Diameter In Cohesive SoilBy Chu E. Ho
Current methods of determining jet grout column diameters are highly empirical and site specific, and do not take into account the jet hydrodynamics and soil parameters explicitly. A theoretical model
Jan 1, 2006
-
RD Pile Wall – A Water Tight Retaining Wall StructureBy Antti J. Perala, Teemu J. Yli-Kovero
"Efficient use of land is constantly requiring more underground construction. Minimized execution time and disturbance to surroundings and nearby structures are essential benefits for all construction
Jan 1, 2017
-
Micropile-Supported Wall To Resist Lateral Deflection Of Existing Railroad Bridge AbutmentBy Samer R. Rabab?ah
As part of the PHX Sky TrainTM project at Phoenix Sky Harbor International Airport in Phoenix, Arizona, the existing traffic lanes at the 44th Street underpass below the Union Pacific Railroad (UPRR)
Jan 1, 2011
-
Design Of Cooper River Bridge FoundationsBy Osama Safaqah
The new Cooper River Bridge will replace two existing bridges along U.S. Highway 17. The cable-stayed bridge will be one of the largest in the U.S and will connect the City of Charleston and the town
Jan 1, 2005
-
Economic and Safe Design and the Execution Standards for the Construction Phase of Deep Foundation Systems in Difficult Soil ConditionsBy Seffen Leppla, Rolf Katzenbach, Matthias Seip
"Abstract The economic and safe design of deep foundation systems in difficult soil conditions is based on a reduction of construction material used, construction time spent, energy consumed and a hig
Jan 1, 2014
-
Update Of Aashto Standard Specifications For Highway Bridges: Division II--Construction - Preliminary Draft Final Report Vol. II - Specifications And Commentary - Driven Foundation Piles - 4.1 DescriptionThis work shall consist of furnishing and driving foundation piles of the type and dimensions designated on the plans or in the special provisions including cutting off or building up foundation piles
Jan 1, 1989
-
Examples Of The Use Of Temporary Works Soil Nailing In The UK And IrelandBy Martin J. Pedley
The use of soil nailing has grown steadily in the UK over the last 15 years and it has recently become more popular in the Republic of Ireland. This paper presents three soil nailing temporary works c
Jan 1, 2000
-
Test Pile Program Carrier Pier And South Wharf Naval Station Puget Sound Everett, WashingtonBy David G. Winter
The first test pile for the carrier pier and south wharf at NAVSTA Puget Sound was driven on December 27, 1989, and the final pile was tested on February 26, 1990. Implementation and modification of t
Jan 1, 1990
-
Treated Round Wood Piling SpecificationsBy James S. Graham
Specifications for treated round wood piling are presented for the engineers consideration. Included in the text are background information, technical committees, Chellis, quality, treatment, static a
Jan 1, 1992
-
Effect Of Stabilizing Soft Super-Saline Soil By Vibroflotation ? SynopsisBy S. F. Fu
The Charkhan Salt Lake area of the Chaidamu Basin in West China is characterized by soft super-saline soils with very high contents of soluble salts. From the engineering point of view, these saline s
Jan 1, 2010
-
Izmit Bay Bridge Crossing: Integrated Multidisciplinary Approach Reduces Risk And Lowers Overall Project Cost For Bot Bridge ConsortiumBy Jacob Chacko
The Izmit Bay bridge, a 3-km-long suspension bridge crossing of Izmit Bay, Turkey is planned to be constructed in one of the most seismically active places in the world. The site, which has the poten
Jan 1, 2011
-
The Advantages Of Arbitration - I. Arbitration DefinedBy John B. Tieder
Arbitration is a legally recognized alternate litigation for the resolution of civil disputes. The parties agree, either before or after a dispute arises, to submit that dispute to an independent thir
Jan 1, 1988
-
Special Foundation Construction For Large Deep Excavation Pits In Berlin - Summary:By Wolfgang G. Brunner
The center of Berlin is currently a huge jobsite, where international architects, designers, consultants, construction and ground engineers as well as investors take on the challenge of the biggest an
Jan 1, 1999
-
Unique Algorithm Which Takes into Account Source Wave Travel Paths When Estimating Absorption Values From DST Data SetsBy Gerald Verbeek, Erick Baziw
Dynamic soil analysis (DSA) in geotechnical practice is intimately related to the capability of measuring the necessary soil properties of shear modulus and absorption. In DSA the methods of analysis
Jan 1, 2019
-
Problems Of Cast In Situ Driven Piles Added To Existing Piles And Built Near A Standing StructureBy L. F. Albert
The paper describes solutions given to foundation problems during the reconstruction of a power plant set on fire, located adjacent to several still Working Units. After a detailed site and laboratory