Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    Reflections On Our Industry - Foundation Vs Geotechnical

    By Arturo Ressi di Cervia

    From the times when men in lacustrine environments drove wooden piles into the mud to elevate their dwellings, until the beginning of the twentieth century builders reacted to the conditions found in

    Jan 1, 2000

  • DFI
    Economic Foundation Design For Tall Buildings

    By Frances Badelow

    This paper describes a design process for piled raft foundations supporting high-rise buildings. The design process comprises an initial stage of geotechnical site characterization using the results o

    Jan 1, 2006

  • DFI
    Experiences With Base Grouted Drilled Shafts In The Southeastern United States

    By Steven D. Dapp

    The use of base grouting (tip grouting) to enhance the axial capacity of drilled shaft foundations can achieve improvements in economy and reliability for many types of projects and soil profiles. Rec

    Jan 1, 2006

  • DFI
    Design And Construction Of Integral Drilled Shaft - Columns For The Boscawen-Canterbury Bridge

    By Frederick C. Rhyner

    Drilled shafts have become an economical foundation choice for bridges in the northeast United States, especially when they can be constructed over water without the use of cofferdams. For the Boscaw

    Jan 1, 2004

  • DFI
    Wave Equation Technique For Estimating Driven Pile Capacity

    By Luo Yang

    A one-dimensional wave equation based algorithm for estimation of shaft and toe resistance of driven piles using High Strain Testing (HST) data is presented. The pile is represented by a uniform elast

    Jan 1, 2006

  • DFI
    Underwater Cable Anchors - Salvage Of Barge 45, Niagara River ? Background

    By Colin C. West

    On August 7, 1986, Barge 45, while being towed near the mouth of the Niagara River, was swept downstream and pinned against one of the central piers of the Peace Bridge. The barge rested against the p

    Jan 1, 1987

  • DFI
    Ultimate Uplift Capacity Of Single And Group Piles In Clay ? Synopsis

    By B. M. Das

    Several laboratory model test results for the determination of the ultimate uplift capacity of single and group metal piles embedded in near-saturated clay have been presented. Based on the uplift tes

    Jan 1, 2010

  • DFI
    Advanced Soil Mailing Design - Improved Reliability And Predictability Of Wall Performance

    By Reinhard Gnilsen

    Soil Nail walls, like any other structure, must meet high standards of design to be acceptable to the public and owners. On the other hand, the concept of soil nailing trails behind other structures i

    Jan 1, 1988

  • DFI
    Collaborative Alliances – A Sustainable Way Forward For Construction?

    By Stefano Trevisani

    Abstract The FIEC Sustainability Vision states that “risks should be identified and allocated in a fair manner across the project team from the early stages of the design phase. A partnering approach,

    Jan 1, 2014

  • DFI
    Design And Performance Evaluation Of Bored Piles In Sand

    By Ashutosh S. Dhar

    Cast-in-place piles were examined in this paper from the viewpoints of construction quality, axial capacity, and load-displacement responses. The results of ten 450 mm diameter (18? f) bored piles, in

    Jan 1, 2006

  • DFI
    Rehabilitation Of Tilted Large Drainage Caisson ? Synopsis

    By M. A. El-Sohby

    The paper describes some problems encountered with the foundation of a deep drainage caisson constructed on the Nile Bank in Cairo. The use of suction dredging while sinking the caisson led to a pipin

    Jan 1, 2010

  • DFI
    Real Time Validation of Driven Cast In-Situ Piles

    By Derek Egan

    "Abstract Construction clients want their foundation solutions to be right first time, every time; but it is often the geotechnical contractor who carries the most risk in achieving this. Robust valid

    Jan 1, 2014

  • DFI
    Practical Experiences On Pile Dynamic Measurement In Shanghai - Synopsis

    By J. Pei

    The studies of dynamic measurements using stress wave theory has commenced in China. This paper introduces some practical experiences using "CASE method" in Shanghai showing applications of dynamic me

    Jan 1, 2010

  • DFI
    Gordie Howe International Bridge Foundations - Drilled Shaft Construction in Challenging Detroit Limestone

    By Jim Glider, Noah Miner

    The Gordie Howe International Bridge is a project to build a cable-stayed bridge and border crossing across the Detroit River. With a span length of 2,800-ft (853.4 meters), the Gordie Howe Internatio

    Sep 8, 2021

  • DFI
    100-Day Document - Mandatory Discussion, Mediation And Arbitration Of Construction Disputes ? 1.0 Coverage

    1.1 The parties agree to submit all claims, disputes or controversies arising out of, or in relation to, the interpretation, application or enforcement of this agreement, including dispute resolution

    Jan 1, 1994

  • DFI
    From Linear To Circular Economy; Using Hollow Piles To Reduce Embodied Carbon And Promote Pile Reuse

    By Andrew McNamara, Stuart Norman, Matthew Dearing, Michael Pelken, Asha Panchal

    The deep foundations industry has largely remained unchanged since in the advent of CFA piling in the 1960s. Piles have consequently been designed and constructed following the traditional codes and s

    May 1, 2022

  • DFI
    Drilled Shaft Difficulties and a Micropile Solution

    By Jeff Jackson, Paul Axtell, David Graham

    The Montana Department of Transportation recently awarded a contract to construct a replacement bridge across the Clark Fork River in Heron, MT. Both abutments and both intermediate bridge bents were

    Jan 1, 2018

  • DFI
    Comparative Analysis Between Traditional and EC7 Criteria Applied to the Design of Diaphragm Walls Concerning the Ultimate Limit States

    By J. Matos e Silva

    "Abstract The paper refers five examples of executed diaphragm walls with one to five levels of anchorages. For each example a comparison is made between the results of the design using the traditiona

    Jan 1, 2014

  • DFI
    Drilled Pile Design and Installation Challenges in an Urban Environment

    By Satyajit Vaidya, Rudolph Frizzi, Luis Berroteran

    This paper presents design and construction challenges associated with a high-capacity rock-socketed drilled pile foundation system for a 60-story building recently constructed in an urban environment

    Jan 1, 2018

  • DFI
    Increasing Lateral Pile Stiffness Through Limited Soil Improvement

    By Thomas J. Weaver

    Piles extending through soft soil near the ground surface will have a relatively low lateral stiffness. As a result, lateral serviceability limits may control the number of piles required for foundat

    Jan 1, 2006