Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
An Innovative Approach To Load Testing Of High Capacity PilesBy P. Bermingham
A new approach to load testing of high capacity piles is presented. The method is mobile, inexpensive, repeatable and non-destructive allowing for multiple pile testing at a single site. A reaction ma
Jan 1, 1989
-
Tied-Back Offset Tangent Caisson Retaining Wall For The North Bulkhead Third Harbor Tunnel Project Boston, Massachusetts ? IntroductionBy Daniel L. Hanson
This paper presents a case history of the design, installation and performance of a tied-back tangent caisson retaining wall which was constructed as part of the Third Harbor Tunnel project currently
Jan 1, 1994
-
SIMBAT Dynamic Pile Testing - Results of an Independent Pile Capacity' Prediction EventBy Richard T. Stain
"In 2001, a pile trial site was established at Limelette in Belgium consisting of 25 displacement screw piles and 5 driven pre-cast piles. Interested parties were invited to participate in a pile pred
Jan 1, 2005
-
Improving Very Compressible Soils By Stone Columns And Stiffening Concrete Columns ? SynopsisBy I. Stanculescu
The consolidation of thick and very compressible soil deposits by stone columns associated with cast-in-place plain concrete columns, has been performed for shallow foundations of some heavy industria
Jan 1, 2010
-
Aspects of Standardization for Piles in EuropeBy Roger Frank
"Abstract After noting the importance of standardization for piles, the European system is described (execution, tests and design, etc.). Some important aspects of Eurocode 7 are outlined (like the ro
Jan 1, 2014
-
Ground Improvement Design and Construction for Seattle’s Elliott Bay Seawall Replacement and RetrofitBy Andrew Malinak, William Perkins
Seattle’s Elliott Bay Seawall protects the 1½ miles of downtown waterfront between South Washington and Broad streets. The seawall supports the urban waterfront and infrastructure, including the Alask
Jan 1, 2018
-
United States Capitol Visitor Center - Drilled Shafts, Utility Conflicts, And CommunicationBy Giovanni A. Bonita
The United States Capitol Visitor Center (USCVC) is one of the largest underground structures ever constructed in the Washington, DC, metropolitan area. The 600,000 ft2 (55,750 m2) structure is entir
Jan 1, 2006
-
Non-Linear Evaluation Of Pile Groups Lateral DeflectionBy F. Castelli
A simplified non-linear method to predict the behaviour of a single pile and/or pile group under horizontal loads is presented in the paper. The evaluation of the non-linear lateral deflection is base
Jan 1, 2006
-
Soldier Pile Installation Light Rail Rapid Transit Buffalo, New York - Project DescriptionBy Daniel J. Rider
In 1980 the Niagara Frontier Transportation Authority contracted for three miles of cut and cover box structure and station construction in Main Street, Buffalo, New York. Project depths ranged from
Jan 1, 1987
-
Excerpts From Drilled Shafts: Construction Procedures And Design Methods - General ApproachBy L. C. Reese
? Good construction and inspection presumed. ? Capacity-computation factors are independent of construction method. ? To account for variable or uncertain site conditions, anticipated construc
Jan 1, 1988
-
Micropiles in an Urban Setting – TBTA Verrazano Narrows Bridge HOV/BUS Ramps, Brooklyn, NY and Nysdot Kosciuszko Bridge Replacement, Brooklyn, NYBy M. D. Riegel, Brian T. Felber
"Construction of foundation elements in an urban environment is often complicated by multiple constraints such as existing foundations, utility conflicts, maintenance and protection of traffic on high
Jan 1, 2016
-
Three-Dimensional Stability Analysis Of Vertical Shafts In Homogenous SoilsBy Reza Y. Khaksar
Presented is a rigorous solution for the three-dimensional stability analysis of vertical shafts (excavations) subjected to the self-weight of the soil based on the upper-bound theorem of limit analys
Jan 1, 2006
-
Resistance Factors For Lateral Design Of Drilled Shafts Supporting Sound WallsBy Ke Yang
Drilled shafts are widely used as foundation system for sound walls to resist lateral loads. The design method based on the ultimate lateral capacity, such as Broms method, is often used for sound wal
Jan 1, 2007
-
Driven Pile Cost Comparison For Two Large Wisconsin Dot Bridge ProjectsBy Van E. Komurka
This paper presents a cost comparison of the driven pile foundations for two large Wisconsin Department of Transportation (?WisDOT?) projects in Milwaukee, Wisconsin: the Marquette Interchange South L
Jan 1, 2009
-
Use Of And Design Parameters For High Capacity Foundation Elements In Boston Bedrock - IntroductionBy Mark X. Haley
Foundation design and construction in Boston has changed dramatically during the past 10 years. Prior to 1985, the primary foundation element in Boston, where deep foundations are required, was driven
Jan 1, 1994
-
A Fully Connected Jobsite is a Must for the FutureBy Christian Hoyme, Jochen Maurer
Most of the current foundation projects are suffering from disconnected information silos. In the first silo there is the planning of the project with corresponding data, presented by paper or digital
Jan 1, 2019
-
Shaft End Bearing Capacity In Cavernous LimestoneBy Issa S. Oweis
Limestone is a sedimentary rock composed primarily of calcite (calcium carbonate). In the presence of an aqueous solution of carbon dioxide (carbonic acid) bicarbonate radicals (2HCO3)- are produced t
Jan 1, 2009
-
Evaluation Of Pile Foundation Design Methods Using Load TestsBy SungWon Park
The efficiency of the current design methods for computing pile resistances is evaluated using field load-settlement tests results. Twelve load-settlement test data for drilled shafts and bored piles
Jan 1, 2009
-
Innovative Cofferdams Used On The I-205 Columbia River BridgeBy Robert Bittner
The following is a report on the development of two unique and separate cofferdam systems used in the construction of the marine foundations for the I-205 Columbia River Bridge at Portland, Oregon for
Jan 1, 2013
-
Formation Of Interlocking Jet Grout Columns At Large DepthBy Chu E. Ho
Jet grout column formation at large depths are prone to several uncertainties, such as inaccuracy in setting out boreholes, drilling deviation, soil variability and reduced jetting energy at the nozzl
Jan 1, 2008