Ground Freezing for Groundwater Cutoff at the Seattle Seawall Replacement ProjectBy Brenton Cook, Daniel Mageau, Larry Applegate, Aaron McCain
"Ground freezing was successfully used to create an impermeable barrier wall along 3,000 feet of the downtown Seattle waterfront as part of the Seattle Seawall Replacement Project. This $360 million r
Jan 1, 2016
-
Dulles Metrorail/Silver Line (Phase 2) Drilled Shaft Lateral Load Testing ProgramBy William Billiet
"The Dulles Silver Line Phase II is an 11.4 mile extension of the Washington Area Metro Transit Authority’s Silver line in northern Virginia. There are three miles of elevated guideway, which are supp
Jan 1, 2017
-
Secant Pile Barrier Wall Overlap, Thickness, and Position at the U.S. Army Corps of Engineers Wolf Creek Dam, Jamestown, KYBy Bernard B. Vannoy, Howard W. Gault, Ramesh Bobba
"Treviicos-Soletanche Joint Venture (JV) and the US Army Corps of Engineers (USACE) have installed a 3800-foot long, 275-foot deep and minimum 2-foot wide secant pile barrier wall at Wolf Creek Dam in
Jan 1, 2015
-
Metro Sports Facility – A Ground Improvement Case StudyBy I. D. McPherson, Dominic P. Mahoney
The Metro Sports Facility is currently under development in Christchurch, New Zealand and is a key Anchor Project in the city’s post-earth quake recovery. When completed it will be largest indoor spor
Nov 1, 2022
-
Application of Non-Destructive Testing to Drilled ShaftsTechnically speaking, the concept of NDT sounds like the "magic bullet" when faced with a questionable drilled shaft. All the Contractor or Engineer needs to do is select an NDT method, apply it, unde
Jan 1, 2004
-
Prevention Of Landslides With Rows Of Pressed-in Pipe Piles On Steep SlopeBy Takefumi Takuma, Masashi Nagano, Koji Kajino
As part of the construction of a multi-span pre-stressed concrete girder bridge for Japan’s new high speed rail line, landslide preventive piles were installed on the flank of a steep slope. The rotar
-
Providing External Confinement to Precast Prestressed Pile Shafts to Improve Ductility - ·Experimental ObservationsBy Andrew Budek
"Analytical and experimental work has shown that achieving the full inelastic lateral capacity of a pile may require the formation of a plastic hinge below ground level, in the pile shaft. The confini
Jan 1, 2005
-
Fogg Museum Expansion - Support of Excavation Design and ConstructionBy James L. Christensen, Gregory Sanchez, Michael P. Walker
The Fogg Museum expansion project required excavation and construction in a congested urban area in Cambridge, Massachusetts. A soldier pile tremie concrete (SPTC) wall provided the support of excavat
Jan 1, 2015
-
Building Drilled Shafts to Bridge the MississippiBy Brian Koch
Michels installed 242 drilled shafts to support the piers for a new basket-handle, true-arch twin bridge across the Mississippi River from Moline, IL to Bettendorf, IA. The installation of the drilled
Jan 1, 2019
-
Protection of Waterfront Properties by Pressed-In Sheet Pile SeawallsBy Ian Vaz, Takefumi Takuma, Rafael Holcombe, Chris DellAringa
"This paper will discuss the successful installation of seawalls for the first phase of a project in Long Beach in California known as the Naples Island Permanent Seawall Repair – Phase 1. How an unco
Jan 1, 2016
-
A New Data Interpretation Approach For Pile Thermal Integrity TestingBy Quanchen Sun, Mohammed Z. E. B. Elsahife, Anthony Fisher, Chris Barker, Jennifer Schooling
A review of the literature shows that pile integrity is a significant concern in pile construction. Recently, a new integrity test, thermal integrity profiling (TIP,) has been put into use in foundati
May 1, 2022
-
Using Large Pile Driving Hammers For The Foundation Of Bridges And WindparksBy Bernhard Bruggaier
Outside the oil and gas industry there is an increasing demand to install big piles for the foundation of ports, bridges, and wind-energy plants. This article introduces the design and techniques in u
Jan 1, 2002
-
Sloping Rubble Marine Seawalls Founded on Soft Soil Improved by Stone ColumnsBy Eleonora Di Mario, Colin B. Turnbull, Matthew G. Mills, Chengbin Miao, Wilhelm S. Degen
"In the past decade, the ‘zero-dredge’ philosophy has become the preferred option for the formation of marine seawalls and reclamations, compared to the partially or fully dredged options, as this sol
Jan 1, 2017
-
Assessment of Existing Bulkhead Walls for Dredging ImpactsBy Rakam Lama Tamang, Michael J. Byle, Stephen Ernst
"For various reasons, dredging may become necessary in front of existing bulkhead walls, either for channel deepening or for environmental remediation of contaminated sediments. The removal of sedimen
Jan 1, 2017
-
Soil and Rock Nail Wall for Construction of a Subterranean AuditoriumBy Andrew Moran, William H. Walton, Matthew D. Emrick, Mary C. Nodine
"A rapidly growing company in the northern US needed a large auditorium built into a dolomite bedrock hillside. The structure required an 80-foot-deep earth retention system independent of the auditor
Jan 1, 2017
-
Designed, Load-Tested, And Installed Piles For A High-Rise Building In Southwest Florida - A Case History - SynopsisBy Anupam Saxena
This paper presents a case history of design, prediction, probe and production pile driving monitoring, loading test, and installation of piles for a 22-story condominium tower in southwest Florida, U
Jan 1, 1996
-
A Novel Approach to Incorporate Shear-Moment Coupling Effects in Foundation Stiffness for Caisson Piles for Izmit Bay Bridge in TurkeyBy Arash Khosravifar, Amalia Giannakou
"Nonlinear foundation springs for bridge caisson foundations show significant coupling between the shear force and bending moment. Implementing foundation stiffness matrix with coupling effects (off-d
Jan 1, 2017
-
Performance Of Stone Columns In Multi-Layered Soils Under The Action Of Seismic LoadsBy P. Kiruthika, A. Murali Krishna
Soil liquefaction is a dangerous phenomenon that involves huge damages during strong earthquake ground motion event. Stone columns (SCs) are widely used as liquefaction mitigation element which is exp
Sep 1, 2022
-
Innovative Soe Solutions For Shaft Construction: Getting To Depth With Diaphragm Walls At Westerly Storage TunnelBy Ryan Sullivan, Lisa Smiley, Jewels Stover
The Westerly Storage Tunnel (WST) Project is part of Project Clean lake, the North East Ohio Regional Sewer Dist years. When completed in 2020, WST will be nearly 2 miles of 25-ft diameter tunnel 200-
-
Centrifuge Modelling Of Displacement Piles and Installation EffectsBy J. Gniel, L. King, C. Gaudin, C. O’Loughlin
"This paper presents some recent advancements in centrifuge modelling, which enable the installation of displacement piles to be performed in-flight while measuring ground responses. Details and resul
Jan 1, 1900