Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Cost Effective Loading of Large Diameter Pre-Split HolesBy LaRay Collyer
San Juan Mine began pre-splitting the highwall prior to cast blasting in August 1986. The first pre-split shot used six inch PVC (polyvinylcloride) pipe inside a 10 5/8 inch hole, drilled at a 74 degr
Jan 1, 1990
-
Blasting Application With 50% of Used Oil in Emulsion FuelBy Dadan Munawar, Benny Gunawan
Blasting at Sebesi in Central Tutupan Pit area in South Kalimantan, Indonesia is planned to be using emulsion, where used oil makes up 50% of the total emulsion fuel. The significant amount of used oi
Jan 1, 2015
-
Strategy, Innovation and Change - Challenging the Future at the Gregg River MineBy Rick W. Bellenie, Ronald L. Woolf
The Gregg River mine is located 40 kilometres (25 miles) south of Hinton, Alberta, approximately 330 kilometres (205 miles) west of Edmonton and lies against the Front Range of the Rocky Mountains.
Jan 1, 1994
-
Blast Damage Control During Underground MiningTracer blasting is commonly used in Canadian underground mines for overbreak control. It involves tracing a column of ANFO with a low strength detonating cord. In order to investigate the effectivenes
Jan 1, 1994
-
Finite Element Simulation of Time-Dependent Fracture and Fragmentation Processes in Rock BlastingBy M Oldenburg, P J. Digby, L Nilsson
A constitutive model for the simulation of fracture and fragmentation processes in rapidly loaded rocks is studied. The model was included in a wave propagation finite element code. The results obtain
Jan 1, 1985
-
Physical Security On-Siite Magazines, Keys, Trucks & PeriimetersBy John Brulia
"Definition of On-Site Security: All mandatory and non-mandatory, deterrent and loss control measures undertaken by an authorized explosives business tokeep its stocks of explosive materials and precu
Jan 1, 2006
-
Constructing a Decline Truck Entrance Tunnel Into Rock Reserves Located Beneath a College CampusBy David R. Holberg
In the Kansas City metropolitan area, mineable Bethany Falls Limestone occurs 80 ft below river level under the 700 acre Park College Campus on the north bank of the Missouri River at Parkville. For 2
Jan 1, 1997
-
Safe Blasting Near Important Civil Structures: A Case StudyBy T. N. Singh, Vasudev Singh
Most of the surface mines in India have drilling and blasting practice as excavation method. All the mines have to keep the blast vibration level below a certain limit. But when mining operation is ne
Jan 1, 2006
-
Explosives Malfunction from Sympathetic Detonation to Shock DesensitizationBy C Yeung, G Fitz, R Heater, P D. Katsabanis
Explosives malfunction due to shock waves is a serious concern for successful blasting results. Malfunction can range from sympathetic detonation to desensitization and modification of firing times of
Jan 1, 1994
-
Demolition of Old Bridge Piers ByBlastingBy S. Mandal, R. Singh
The demolition of structures with explosive though most rapid, safe and efficient requires planned blast design parameters with respect to geometric and strength properties of the structure to be demo
Jan 1, 2001
-
Effects of Blasting Vibrations on Uncured Concrete FoundationsBy Thomas A. Simpson, Yung-Kwaun Jow, Dennis L. Gamble
Construction of the $200 million Riverchase Galleria Mall in Hoover, Alabama was started in early 1984. The construction area consists of about 70 acres. The extensive building complex requires heavy
Jan 1, 1985
-
High Power Energy CastingBy R W. Givens
This paper presents blast casting design variables that have been developed and are currently being used at the High Power Energy mine in West Virginia. The shot specifications are summarized in Table
Jan 1, 1988
-
Benchmarking Drill and Blast Compliance to Design, A Case StudyBy Alan Tordoir, Mark Roberts
The drill and blast process is a critical function within the production cycle which significantly impacts the ability of an operation to effectively meet its safety and production targets. Acknowledg
Jan 1, 2019
-
Flyrock Range & Fragment Size PredictionBy Cameron McKenzie
Flyrock is a complex issue involving interaction between the charging crew, the blast design, and the local geology, and once conditions on the shot meet certain criteria, the probability of a flyrock
Jan 1, 2009
-
Drilling and Shooting of a Large Air Shaft at an Underground MineBy Curtis Garner
Griesemer Stone located in Springfield, Missouri has supplied aggregate in Southwest Missouri since 1946. In 1954 the decision was made to mine the formation and utilize the mined out area for warehou
Jan 1, 1991
-
Pressure Effects on Density of Small Diameter ExplosivesBy R Deshaise, B Mbhanty
The importance of controlling density of commercial explosives, and the various means to achieve it are described. m e field conditions responsible for density changes during blasting and their effect
Jan 1, 1989
-
Production Blasting and the Development of Open Pit Slopes (8e693b17-abb0-4b98-9d31-35dc00c5ce79)By John P. Ashby
Production blasting is a process of destruction of rock masses in order that ore may be extracted. Many open pit operations are faced with the apparently conflicting requirements of providing large qu
Jan 1, 1980
-
A Blast Vibration Prediction and Data Storage Computer ProgramBy Jerry W. Schweiker
An extensive computer program has been developed which will store and analyze pertinent blast related parameters such as date, time, shot coordinates, charge, delay times, etc. In conjunction with the
Jan 1, 1984
-
Photographic Observation of Channel Effect in the Detonation of Emulsion ExplosiveBy Kazuyoshi Kawami, Fumihiko Sumiya, Kunihisa Katsuyama, Yuji Ogata, Koichi Kurokawa, Yuji Wada
When explosives are detonated in the borehole where there is an air gap between the explosive charge and the borehole of inner wall, the shock cave in an air gap travelling ahead of the detonation fro
Jan 1, 1994
-
Utilizing the Pre-Blast Survey as a Vehicle to Promote Good Public Relations - A Case HistoryBy Wesley L. Bender, James E. Murray
Pre-blast surveys are often conducted solely to document existing structural conditions and uncover potential problem areas. This paper presents a case history where the pre-blast survey was also used
Jan 1, 1988