Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    The Safe Use of Controlled Blasting in Construction and Mining

    By Alyse Munro Hindley

    The increasing negative public opinion toward blasting has led to stricter regulations and increased costs. This paper outlines alternative methods of rock excavation and the safety regulations and ce

    Jan 1, 2015

  • ISEE
    Seismic Wave Frequency Filtering During Computer Modeling of Geophysical Charges

    By E. McCullough, D. Preece, M. Ortel

    The mining and oil industries employ techniques such as geologic mapping, core drilling and electromagnetic field techniques to explore for new deposits. New discoveries of major near-surface ore bodi

    Jan 1, 2013

  • ISEE
    Resolution to a Conflict Regarding Blasting Near a High Pressure Pipeline

    By Randall Wheeler

    In early 2008 we were asked by a quarry to become involved in a conflict with a pipeline company concerning blasting near one of their underground high pressure gas lines. The pipeline company, withou

    Jan 1, 2011

  • ISEE
    Radical Improvements to Blast Hole Drilling Cost and Productivity thru Integrated Teams (021b2c60-f412-46df-9bbc-00d582f72391)

    By R W. Thomas

    This paper explores the possibilities of generating radical improvements in the drilling costs and productivity of blastholes through the efforts of integrated teams as opposed to traditional customer

    Jan 1, 1996

  • ISEE
    Correlation of Measurement-While-Drilling Parameters to Fragmentation

    By Kain Petterson, P D. Katsabanis

    Blast fragmentation, determined using image analysis was correlated to drill monitoring parameters in an open pit operation. Average fragment size and 80% passing size showed strong correlation with s

    Jan 1, 2013

  • ISEE
    A Study of Investigating the Relationship between Geological Strength Index and Ground Vibration Frequency Induced by Blasting

    By Ali Kahriman, D. Adiguzel, R. Ulger, U. Akkaya

    The environmental problems arising from ground vibration has been faced and discussed frequently in various industries such as quarry, mining, civil works, shaft, tunneling, pipe line and dam construc

    Jan 1, 2011

  • ISEE
    Early Americal Tunnesl

    By Robert S. Mayo

    Tunneling, for transportation, began in France with the Milpass Tunnel on the Lanquedoc Canal in 1680. Of course, the ancient miners had been driving tunnels in search of minerals since the dawn of hi

    Jan 1, 1979

  • ISEE
    Blasting Techniques to Prevent Coal Loss and Damage

    By Visitor Makiyi, Chris Batten

    Poor coal recovery due to coal damage or loss caused by blasting can have a significant impact on a mining operation. Increasing coal recovery by reducing blast damage can provide a significant opport

    Jan 21, 2025

  • ISEE
    Modeling of Signature Waves Based on Fourier Series for Blast Vibration Prediction

    By B T. Lusk, Jhon J. Silva

    "The original signature hole technique to predict vibration levels from blasting, is based on theassumption that each hole in a production blast, generates an identical vibration waveformarriving to t

    Jan 1, 2012

  • ISEE
    Optimized Blast Design Through Drone Surveying and 3D Geological Modeling to Solve Highwall Stability Problems

    By Matt Brandon

    This case study demonstrates how integrating drone and GPS surveying with 3D modeling software creates more effective blast designs that address specific geotechnical challenges while improving safety

    Jan 26, 2026

  • ISEE
    Application of blast control plugs and their positive results on airblast and surface fragmentation

    By Lynn Long

    We have seen many new developments in the explosive and blasting accessory category, but one of the most useful items is the blast control plug. Blast control plugs are cone shaped units that are plac

    Jan 1, 1996

  • ISEE
    Demonstrated Improved Fragmentation and Optimized Explosive Distribution by Using Air Decks created with Stemming Plugs

    By Alejandro Ferrada Vergara, María Jesús Barros Godoy

    Reducing costs while maintaining productivity and achieving good results is a constant challenge in mining operations, especially in the drilling and blasting stage, since a bad blast can affect produ

    Jan 21, 2025

  • ISEE
    Improved Blasting Economics at an Uzbekistan Copper Mine

    By Viktor Aranovich, Thomas E. Brown

    The Almalyk Integrated Mining and Metallurgical Plant is located near Tashkant in Uzbekistan and is one of the former Soviet Union's largest copper producers. Almalyk consumes about 10,000 metric tonn

    Jan 1, 1998

  • ISEE
    High-Performance Emulsion-Based Booster

    By Soseol Kim

    A high-performance Emulsion-based booster explosives has been developed that can be used as a booster for bulk explosives. Currently, Pentolite booster, which is mainly used as a booster for bulk expl

    Feb 6, 2023

  • ISEE
    Problem Boulders, Big and Bigger

    By Jerry Wallace

    Two recent-release boulders posed serious threats to public transportation and utilities in Washington State. Both required challenging drilling and blasting solutions.

    Jan 1, 1997

  • ISEE
    Rational Methodologies for Setting Blast Vibration Limits for Houses

    By Adrian Moore, Alan Richards

    "It has been common practice to set blast vibration limits for structures using an “observational”approach whereby limits are set at a level based on observations of damage, or the lack ofdamage, comb

    Jan 1, 2013

  • ISEE
    Advantages in Using Real-Time Blasting Simulation in Surface Blast Planning and Grade Control

    By Peter Dare-Bryan, Will Hunt, Lee Julian

    It is well-known that blasting has an economic effect on grade control activities. However, until recently, methods did not exist for measuring the grade control value change caused by the blast. Rule

    Feb 6, 2023

  • ISEE
    Comparison of Ground Vibrations vs. Frequencies to Strain Rates from Blasting Operations at the Tennessee Capitol Corridor in Nashville, TN

    By William Gates, Gabe McClain, Thomas Pallua, Joe Schrank

    The Tennessee Capitol Corridor connects the Cordell Hull Building (CHB) to the State Capitol, which isa 232-foot-by-124-foot (71 x 38 m) structure in Nashville that includes porticoes built from local

  • ISEE
    AN Railcar Derailed Debris Collection – Data Analysis Update

    By Brandon Fryman, Josh Hoffman, Rhys Baker

    A post-detonation debris collection project was led in conjunction with a large ammonium nitrate (AN) railcar detonation conducted by the Department of Homeland Security-Transportation Security Admini

    Feb 1, 2020

  • ISEE
    Responsible Blasting: Strategies for Community Impact Mitigation

    By César Ugaz, Jorge Cardenas

    Mitigating the vibrations resulting from a blasting rocks is one of the most common challenges that Peruvian mining has, since if this impact is not mitigated it can generate discomfort and altercatio

    Jan 26, 2026