    Sustainable Development Of Industrial Minerals From Mining To Manufacturing - Introduction - Preprint 09-080

    By J. E. Kogel

    Industrial minerals play a central and dual role in the sustainable development (SD) of natural resources. Over the past decade the mining industry has increasingly focused on sustainably extracting

    Jan 1, 2009

  • SME
    Importance Of Geotechnical Field Mapping In Assessing The Stability Of Underground Excavations

    By A. Adu-Acheampong

    Stope instability at Ashanti Goldfields Company Ltd. (AGC) is a major concern. Using information from field mapping, major discontinuity sets were defined, Rock Quality Designation (RQD) was determine

    Jan 1, 2003

  • SME
    Using an intelligent supervisory system to simulate automatic operation in a crushing plant

    By E. Fahrenkrog, D. Sbartaro, E. N. Cifuentes

    An intelligent supervisor using expert system tools and applied to a crushing plant has been developed with a structure based on a model of a human operator. It consists of a knowledge base containing

    Jan 1, 1989

  • SME
    Mine and Mill Labor Productivity Study Shows Wide Range of Values

    By Leons Kovisars

    Introduction Labor is the major cost element for most mining operations. Labor costs are continually increasing, both in nominal and constant terms. This is true in developed as well as less develope

    Jan 11, 1983

  • SME
    Homestake Mining Company, Ruby Hill Mine: A Case Study On How To Streamline The NEPA Process During Mine Permitting Using Properly Designed And Executed Natural Resource Baseline Studies

    By C. L. Wilsey, K. M. Oakes, W. J. Reich, M. J. Protani

    The time frame required to complete the National Environmental Policy Act (NEPA) process for a new mine, or for the expansion of an existing mine, can range between 9 months to 24 months, or more. Th

    Jan 1, 2001

  • SME
    Haile Gold Mine Metallrgy And Flowsheet Review

    By J. Wickens

    Haile Gold Mine is located near Kershaw, South Carolina, approximately 50 miles south of Charlotte, North Carolina. Gold was first discovered at the site in 1827, and the property has been through sev

    Feb 27, 2013

  • SME
    Bay Tunnel-Design Challenges

    By R. John Caulfield

    The primary water supply system for the City of San Francisco and adjacent peninsula areas consists of aging and deteriorated pipelines crossing under the San Francisco Bay (the Bay). This system is h

  • SME
    Mine Stope Coverage Cuts Acid Mine Drainage

    By Joseph J. Feiler

    Historical mining operations in Colorado and other western states have resulted in thousands of remnant mine openings. Many are sources of metals loading and acid water generation in surface and grou

    Jan 1, 2006

  • SME
    Extensible Conveyor Systems For Long Tunnels Without Intermediate Access

    By Dean Workman

    Long extensible conveyor systems are an important option for efficient tunnel excavation where intermediate access is impractical. The conveyor system designed for the Pula Subbaiah Veligonda Tunnel

  • SME
    Thiourea As A Lixiviant For Gold And Silver

    By J. Brent Hiskey

    Thiourea is a reagent capable of complexing gold and silver. With the proper oxidant, thiourea can effectively dissolve metallic gold and silver. A thiourea leaching system possesses potential advanta

    Jan 1, 1981

  • SME
    Ventilation And Climatic Simulation Of Drift/Stope In Metal Mines

    By R. Gunda

    Due to the rapidly increasing production rates and deepening of mine working areas, there is a drastic rise in the number of thermal issues to be addressed for maintaining a safe mine environment. As

    Jan 1, 2011

  • SME
    Pushing The Limits Of Gravity Separation

    By Claude Deveau, Stephen R. Young

    Introduction Tanco History Tanco is sometimes known as the Bernic Lake Mine. It is located about 180 km east-northeast of Winnipeg close to the Manitoba-Ontario boundary. Tanco operates an undergr

    Jan 1, 2005

  • SME
    Adventures in Microtunneling

    By Joseph Clare, Elizabeth Anderson, Mike McGinley, Ron Hines, Judy Cochran

    The South Lake Union Pipelines contract for King County Wastewater Treatment Division and Seattle Public Utilities in Seattle, Washington included three 1.8 m (72-in)inside diameter microtunneled pipe

    Jan 1, 2005

  • SME
    Performance Characteristics Of Geogrid When Used For Roof And Rib Surface Control

    By D. R. Dolinar

    Geogrids can be used as surface control on both the roof and rib in underground mines to prevent the fall of small pieces of rock and material from between the primary supports. The use of screen mate

    Feb 27, 2013

  • SME
    Oil Shale Mining (d211f72f-9d52-4207-8bc5-a8eeaeee8d20)

    By Jerry M. Whiting

    Greater awareness of the increasing need to develop supplementary energy sources is accelerating us towards many basic decisions regarding future utilization of mined energy materials -- uranium, coal

    Jan 1, 1974

  • SME
    Advances in grid-based numerical modeling techniques for improving gas management in coal mines

    Effective gas management in coal mines, as well as proper ventilation design, is very important for maintaining the safety of underground coal miners. Advances in numerical modeling techniques have en

    Jan 1, 2009

  • SME
    Conversion of the Cortez Gold Mining CCD circuit to CIL

    By A. L. Crandell

    History The Cortez Mining District has a long history of mining activity dating back to 1862. More recently, Cortez Gold Mines had operated a cyanide leach, counter current decantation (CCD) recovery

    Jan 9, 1986

  • SME
    Coal Review

    By F. Freme

    Coal production in the United States in 2008 reached a record level of 1.06 Gt (1,171.5 million st), according to preliminary data from the U.S. Energy Information Administration (EIA) (Table 1). This

    Jan 1, 2009

  • SME
    Performance Of A Soft Ground Tunnel On The Washington Metro

    By Edward J. Cording, William H. Hansmire

    INTRODUCTION The Washington Metro, a rapid transit system that will serve the District of Columbia, Virginia, and Maryland, has been under construction for about two years. Construction of the Metr

    Jan 1, 1997

  • SME
    Roof Bolter Rocker Pad Deflector Systems

    By Arnold Hammons

    Automated temporary roof support (ATRS) systems have been incorporated into roof bolters since the 1970?s. During roof bolting, many injuries have occurred from large pieces of draw rock falling inby

    Jan 1, 2009