Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
RI 8722 Laboratory Testing of a Radial-Axial Loading Splitting ToolBy Sterling J. Anderson
To define the technical competence and capabilities of a nonexplosive excavation concept, the Bureau of Mines conducted reduced-scale laboratory tests of a mechanical excavation tool called a rock spl
Jan 1, 1982
-
RI 7892 Laboratory Experiments in Electrokinetic Densification of Mill Tailings (In Two Parts) 1. Development of Equipment and ProceduresBy R. H. Sprute
This report describes Bureau of Mines laboratory test results in electrokinetic dewatering and consolidation of metal-mine tailings. Tailings were placed in 0.3-cubic-foot Plexiglass models, and dc po
Jan 1, 1974
-
Adapting to Ore Characteristics at Lac des Iles MineBy Erin N. Legault-Seguin
The Lac des Iles Mine (LDI) is located approximately 100 km northwest of Thunder Bay, ON. The mine has been in operation since 1993. The initial mine production was 2,300 mtpd and increased to 15,000
May 1, 2009
-
The Effect Of Dolomite Additions And Indurating Temperature On The Microstructure Of Magnetic-Taconite PelletsBy T. V. Johnson
The microstructural relationships in dolomitic fluxed taconite pellets were studied. The influence of basicity (in the range 0.75 to 2.1) and firing temperature (to 1340°C) on the grain structure, mac
Jan 1, 1980
-
Tunneling Through Cobbles in Sacramento, CaliforniaBy Joel Nonnweiler, Rafael Castro, Ross Webb
The three thousand foot long 66-inch diameter Folsom East Interceptor Section2B was completed accident free, on time and under budget with no measurable surface settlement. The tunnel passed through n
Jan 1, 2001
-
Changes to drill pattern and adequate inter-row delay time improve blasting performanceBy P. H. Oliver
The current theory of how explosives fracture rock offers no explanation for the improvements in fragmentation and the reduction of fly rock and back break which occurs when an adequate inter-row dela
May 1, 2003
-
Packaging and Contract Delivery Methods for the Horizon Lateral - RETC2023By Ray Brainard, Adriana Ventimiglia, Amanda Kerr
The $2 billion Horizon Lateral includes over 30 miles of trenched and tunneled pipeline with diameters up to 120 inches.Related infrastructure includes large and small pumping stations, reservoirs, an
Jun 13, 2023
-
Changes to drill pattern and adequate inter-row delay time improve blasting performance (1255a8ec-f486-4f0e-a99f-bee3df1f60e5)By P. H. Oliver
"The current theory of how explosives fracture rock offers no explanation for the improvements in fragmentation and the reduction of fly rock and back break which occurs when an adequate inter-row del
Jan 1, 2003
-
GHG Emissions in the Mining, Metallurgy and Petroleum SectorsBy Pierre Boileau
Outline ? Who are We? ? Canada?s GHG Emissions 1990 - 2000 ? Emissions from the Petroleum Sector ? Emissions from Petroleum Exports ? Emissions from Manufacturing Industries ? Emissions from Min
Nov 1, 2002
-
Coal Mine Ground Control in Western Europe; Past, Present and FutureBy D. N. Bigby
This paper concentrates on ground control innovation in Europe since the first Morgantown conference, mainly from a UK perspective. In particular, it describes the rock engineering and ground control
Jan 1, 2006
-
IC 6872 Methods Of Development And Pillar Extraction In Mining The Pittsburgh Coal Bed In Pennsylvania, West Virginia, And Ohio ? IntroductionBy J. W. Paul
The United States Bureau of Mines has made a study of roof control in 68 mines operating in the Pittsburgh coal bed in Pennsylvania, West Virginia, and Ohio. In making these studies, much information
Jan 1, 1935
-
Brightwater Conveyance System Will Expand Seattle?s Wastewater TreatmentBy John E. Newby
Washington?s King County is constructing a new regional wastewater treatment facility, called Brightwater, in response to growth in the greater Seattle region. Planning conducted in the late 1950s ide
Jan 1, 2007
-
RI 8297 Mechanical Properties of Cores Obtained From the Unleached Saline Zone, Piceance Creek Basin, Rio Blanco County, Colo.By Frank G. Horino
Drill cores from 18 exploratory holes that were drilled into the unleached saline beds were tested for mechanical properties by the Bureau of Mines. Test cores were primarily selected from zones L4B,
Jan 1, 1978
-
OFR-37-75 Electromagnetic Noise In Grace MineBy J. W. Adams
Two different techniques were wed to make measurements of the absolute value of electromagnetic noise in an operating hardrock mine, Grace Mine, located near Morgantown, Pennsylvania. Diesel-powered h
Jan 1, 1974
-
Grout Injection Around Underground Workings - Reinforcement Potential and ProblemsThe injection of grouting compounds into the consolidated rock surrounding underground mine workings has long been practiced for the purpose of sealing against water flows. In more recent times howeve
Jan 1, 1994
-
Mobile hydraulic support for copper ore minesBy K. Kotwica, P. Gospodarczyk, J. Sosnica, J. Pawlik, Z. Iwulski, K. Pawlik
The paper presents problems resulting from the mobile mining machines functioning and requirements concerning a machine control system, which controls successive operation stages of such machines. The
Jan 1, 2003
-
OFR-26(2)-83 Inflow To Horizontal Drains In Tailings EmbankmentsTailings embankments can develop a high phreatic surface if the original design for the embankment does not include drainage facilities or if existing drainage facilities become ineffective. Subsequen
Jan 1, 1982
-
Cyanidation Of Reef And Surface Gold Ores ? SynopsisBy L. Rademan
The kinetic leaching behaviour of a low-grade surface gold ore and a high-grade reef ore were evaluated to determine the achievable gold recovery from these ores and particularly mixtures of these ore
Jan 1, 2012
-
RI 8593 Hydrogen Chloride Sparging Crystallization of Aluminum Chloride HexahydrateBy J. A. Eisele, D. J. Bauer, D. E. Shanks
As part of its effort to produce cell - grade alumina from clay , the Bureau of Mines investigated the hydrogen chloride gas - sparging crystallization of aluminum chloride hexahydrate ( ACH ) from al
Jan 1, 1965
-
Dynamic Horizontal Load Tests On Steel Pipe Piles Having Different Sizes In The Same Construction Site And Their AnalysesBy Eiji Kojima
In this research, dynamic and static load tests were performed on permanent foundation piles which had a pile length of 30 m, 800 mm in outer diameter and 15 mm in wall thickness. In this site the dyn
Jan 1, 2006