    Guadarrama Tunnel Construction with Double Shield TBMs

    By F. Mendaña

    The characteristics of the igneous and metamorphic bedrock, extra-hard and abrasive, of the Guadarrama Tunnels, a bi-tube project of length 28.4 km without any intermediate attack, are first commented

    Jan 1, 2007

  • AIME
    Milling Activity Largely Confined to Gold-Silver Plants

    By Charles E. Locke

    SHARP CONTRAST exists in the reports so helpfully contributed by the individual members of the Milling Committee for this review. Those engaged in the milling of gold and silver ores report great acti

    Jan 1, 1935

  • CIM
    The Value of Orebody Power Requirement Profiles for SAG Circuit Design

    By Chris Bennett, Glen Kosick

    "Process modeling and equipment sizing procedures for SAG circuits has advanced significantly over the past two decades. However, no matter how exact the hardness tests, models and scale-up calculatio

    Jan 1, 1999

  • CIM
    Technology Development in the Copper Industry

    By J. O. Marsden

    Over the past decade, the copper industry has been through an extended downturn followed by several years of sustained high copper price. A number of new technologies have been developed over the past

    Jan 1, 2007

  • AUSIMM
    Challenging the Norms Time Usage Model – Mobile Underground Mining Equipment

    By R Ballantyne, M Adams

    Time Usage Models, used as a basis for calculating performance indicators for mobile mining equipment, have developed from very simple to very sophisticated models. This development has paralleled the

    Mar 15, 2021

  • TMS
    Liquid Metal Modelling Of Flow Phenomena In The Continuous Casting Process Of Steel

    By S. Eckert, G. Gerbeth, K. Timmel, B. Willers, T. Wondrak, N. Shevchenko, M. Röder

    The quality of the produced steel in the continuous casting process is significantly governed by the melt flow in the mold. However, direct flow measurements in liquid metals are still rather scarce.

    Jan 1, 2016

  • NIOSH
    IC 8399 Computer Usage For Evaluation Of Design Parameters And Cost Of Heat Exchangers - With No Change In Phase And Tube Side Pumping Costs As Prime Parameters

    By P. R. Jones

    A computer program was written for design and cost of a shell and tube heat exchanger in which the total cost, which includes annual fixed charges and annual operating costs, was minimized. The progra

    Jan 1, 1969

  • AIME
    European Titanium Industry in the Eighties

    By James H. Taylor

    "Titanium is a widely distributed, dark grey metal1ic element found in small quantities in many minerals. It has no important uses." Happily, this early quotation proved to be wrung; titanium has, o

    Jan 1, 1982

  • NIOSH
    IC 7715 Selenium Data (Revision Of Information Circular 7690) ? Introduction

    By J. D. Sargent

    Selenium might be described as a paradoxical element, being either a metal or a nonmetal, a conductor or nonconductor, amorphous or crystalline, colorant or decolorant, and a hydrogenator or dehydroge

    Jan 1, 1955

  • CIM
    A Risk-Based Approach to Plant Design

    By Mike Fontaine

    The success of a project is defined by meeting the financial performance objectives of the business case within a stipulated timeframe. Early in design, little information is normally available; the u

    Jan 1, 2015

  • DFI
    Project Specifc Design Criteria I-880 Reconstruction Project, Oakland, California

    By Steve Thoman

    After the 1989 Loma Prieta Earthquake, the California Department of Transportation (Caltrans) initiated an overview of the Caltrans Bridge Design Specifications (BDS) and bridge seismic design practic

    Jan 1, 1996

  • NIOSH
    RI 4828 Investigation Of Kasna Creek Copper Prospect, Lake Kontrashibuna, Lake Clark Region, Alaska

    By R. S. Warfield

    The Kasna Creek copper deposit near Lake Kontrashibuna in the Lake Clark region, Alaska, was the object of an investigative project by the Bureau of Mines during the fall of 1948. Recessed because of

    Jan 1, 1951

  • AUSIMM
    Remediation of Mine Seepage at Batu Hijau

    Remediation of Mine Seepage at Batu Hijau

    Sep 13, 2010

  • SME
    The Interaction Of Tunnel Ventilation Systems And Cross Passageway Ways - Preprint 09-055

    By M. J. Gilbey

    Cross passageways between adjacent tunnels in passenger rail or transit systems may be used during train fire emergencies to evacuate passengers to points of safety in the non-incident tunnel. Rescue

    Jan 1, 2009

  • SME
    Designing, Installing and Maintaining Clean, Stable and Efficient Conveyor Belt Systems

    By R. P. Stahura

    Conveyors are the lifeline of mining and processing operations. They continuously supply materials to and carry finished products and waste away from operations. When conveyors are running at less tha

    Jan 1, 1992

  • NIOSH
    RI 6688 Removal of Waterblocks From Gas-Producing Formations

    By J. L. Eakin

    A method was developed by the Bureau of Mines in the laboratory and in the field to relieve capillary waterblocks in gas wells. Impaired gas permeability was improved by this inexpensive chemical trea

    Jan 1, 1965

  • CIM
    Application of Multivariate Image Analysis (MIA) to Predict Concentrate Grade in Froth Flotation Processes

    By Pierre Pelletier, Julie Fournier, Gianni Bartolacci, Yves Breau, Dominique Girard, Ahmed Bouajila, Carl Duchesne

    "The development of on-stream analyzers (OSA), such as those based on X-ray fluorescence (XRF), has been key to improve metallurgical performance of flotation processes. However, since these analyzers

    Jan 1, 2003

  • SAIMM
    SPOTLIGHT on APCOM ‘84

    By A. N. Brown

    The Eighteenth International Symposium on the Appli¬cation of Computers and Mathematics in the Mineral Industries was held in London from 26th to 30th March, 1984. The Symposium was organized by the I

    Jan 1, 1984

  • SME
    Bias And Error In Mine Project Capital Cost Estimation

    By J. Bertisen, G. Davis

    Previous analyses of small samples of mining projects have found that feasibility studies tend to well under-estimate the actual capital costs of the project. Our review of 63 mining and smelting pro

    Jan 1, 2007

  • SME
    Unground Aragonite Process

    By R. D. Auten

    This paper is primarily a report on the process of using oolitic aragonite, as received from Marconi& Ocean Industries, Ltd. without further processing, for a major portion of the raw feed to a rotary