The use of wetlands for effluent polishing at Placer Dome, Campbell MineBy Benoit Bissonnette, David Gelderland
"The Campbell Mine Constructed Wetlands has been in full operation, processing effluent from the water treatment plant of the mill circuit for the last two years.The overall results are extremely posi
Jan 1, 2003
-
Activities Of Pbs And Ags0.5 In High-Grade Copper MattesBy S. N. Sinha
The distribution coefficients of lead and silver between copper and matte phases have been measured at two different temperatures. Experiments covered the ranges of 0.009-1.8, 0.07-0.13, and 0-11 wt p
Jan 1, 1983
-
Innovation In Control Of Geomechanical State Of Undermined Rock Mass And Deformations Of Earth SurfaceBy F. N. Voskoboyev
The suggested new method for control of geomechanical state of undermined rock mass ensures, as a safety measure for the earth surface protection, the decrease of deformations by 2,5 - 10 times in min
Jan 1, 1996
-
RI 4918 Taconite Fragmentation (9d8049d8-e6ab-4919-9748-1a4c55643be5)By Vernon C. Davis
"SUMMARY AND CONCLUSIONSIn initial attempts to mine taconite by conventional open-pit methods, the material tended to break into tabular blocks that were too large to be handled by conventional shovel
Jun 1, 1953
-
RI 9678 - Results of In-Mine Research in Support of the Investigation of the Sago Mine ExplosionBy Kenneth L. Cashdollar
The Mine Safety and Health Administration (MSHA) and the West Virginia Office of Miners? Health, Safety, and Training (WVOMHS&T) investigated the explosion at the Sago Mine in West Virginia, which occ
Sep 1, 2009
-
Thermal analysis study of the effect of cooling rate on the microstructure and solidification parameters of 319 aluminum alloyBy S. G. Shabestari
In the metal casting industry an improvement of component quality mainly depends on better control over the production parameters. Thus, thermal analysis cooling curve of the alloy is used for process
Jan 1, 2004
-
The Use Of Cusums As A Tool To Aid In The Interpretation Of Slope Monitoring Data With Specific Examples From An Operating Open Pit MineBy P. A. Lilly, W. Sarunic
In most cases, slope movement monitoring data are collected on a temporal basis and displacement or velocity is plotted against time in order to assist the engineer to make judgements about slope beha
Jan 1, 2006
-
RI 2570 A Float-And-Sink Method And Apparatus For Testing Coarse-Size CoalBy Byron M. Bird, Earl R. McMillan
"The method and apparatus described herein was developed at the Northwest experiment station of the Bureau of Mines, Interior Department, in cooperative research work with the University of Washington
Feb 1, 1924
-
Experimental And Theoritical Studies On Pile Capacity - SynopsisBy K. Rambha Devi
The paper is an attempt to co-relate the findings of pile capacity using a number of formula suggested by various authors with the actual field load test results. Five locations consisting of wholly s
Jan 1, 1996
-
Temporary Secant Wall For A Subway Rehabilitation Project In An Urban EnvironmentBy Vincent Tirolo
Two separate secant pile cofferdams were constructed as part of an extensive rehabilitation and modernization of the New York City Transit's Lexington Avenue/Third Avenue IND Station at 53rd Stre
Jan 1, 2003
-
Improving Safety of Drill Steel Diameter Changes on Rotary DrillsBy Zach Ellis, Dusty Fisher
The Office of Surface Mining, Reclamation, and Enforcement (OSM) cited a large surface coal mine for a series of flyrock incidents that occurred when blasting close to the mining lease perimeter. The
Jan 1, 2015
-
Uplift Capacity Of Drilled Piers In Clay - SynopsisBy Braja M. Das
Laboratory model test results for the ultimate uplift capacity of square and circular foundations in saturated clay (ø=0) have been presented. The results of the present model tests for square foundat
Jan 1, 1987
-
Anticipated Behavior Of Silty Sands In TunnelingBy Ronald E. Heuer, Debra L. Virgens
INTRODUCTION Behavior of clay soils in response to tunneling is reasonably well understood by reference to the tunnel stability factor NT = Pz/su (Peck, 1969; Heuer, 1974). With this analysis tool,
Jan 1, 1987
-
Metallurgical Utilization of Reusable Products from the Recycling Industry in a Secondary Copper Smelter .By Andreas Nolte
This paper includes a comprehensive report about the metallurgical utilisation of reusable products from electronic scrap recycling, car shredding industry, used glasses an various waste products, suc
Jan 1, 1997
-
A Quantitative Chemical Model of the Broken Hill Lead-Zinc DepositA quantitative chemical model of the rocks of the Broken Hill lode environment is presented to illustrate a stratiform orebody in a meaningful form to scientists interested in environmental control on
Jan 1, 1968
-
Hoboken Converter Performance Improvements At The Phelps Dodge Miami SmelterBy Ovidiu Pasca
The Phelps Dodge Miami Smelter utilizes four Hoboken converters to process molten matte from the Isasmelt vessel. This paper presents past and present improvements in operation, maintenance and proce
Jan 1, 2005
-
Investigation of Occupational Accidents in Western Lignite Corporation by Using the Efficiency Assessment Approach Mining, Metallurgy and Exploration (a017703a-5db6-4c3d-94be-c80359dfab6f)By Cem Şensöğüt, Özer Ören, Yaşar Kasap
The mining sector, which has an important place in terms of raw material and energy supply, is referred as a sector with one of the highest fatal accidents in comparison with other sectors. In this ce
-
Tentative identification of chemical elements likely to escape in the atmosphere attheLingan coal-fired power plant, Lingan, Nova ScotiaBy Erwin L. Zodrow
"The neglect of including the toxic metal mercury in the list of escaping elements (Zodrow, CIM Bulletin, September 1982, pp. 138-140) was pointed out to the author in a private letter by J.E. Rehder,
Jan 1, 1982
-
Effect of Hydrophobicity and Frother Concentration on Bubble-Particle Interactions in Turbulent FlowEffect of Hydrophobicity and Frother Concentration on Bubble-Particle Interactions in Turbulent Flow
Sep 13, 2010
-
RI 9528 - Evaluation Of The Three-Phase, Electric Arc Melting Furnace For Treatment Of Simulated, Thermally Oxidized Radioactive And Mixed Wastes (In Two Parts) - 1. Design Criteria and Description of Integrated Waste Treatment FacilityBy L. L. Oden
The U.S. Bureau of Mines and the Department of Energy (DOE), through its contractor EG&G Idaho Inc., are collaborating on a multiyear research project to evaluate the applicability of three-phase, ele
Jan 1, 2010