Search Documents

  • DFI
    The Channel Tunnel Project - Historical Background

    By C. J. Kirkland

    For two thousand years and more, we insular Britons have been grateful for the existence of the narrow strip of water that separates us from mainland Europe. It has given us a sense of security agains

    Jan 1, 1991

  • AUSIMM
    Development of an On-Site Mineralogy Solution for Metallurgists

    By D van der Wal, R Dobbe, K Moeller

    "Ore mineralogy and texture are primary variables controlling mill recovery efficiency in flotation plants. However, tracking daily variations of key mineralogical characteristics such as species-by-s

    Jul 15, 2013

  • SAIMM
    Underground Extraction Of Contiguous Coal Seams/Sections Consisting Thin Parting: A Case Study

    By Rajendra Singh

    Underground depillaring of contiguous coal seams/sections is a difficult problem, which becomes even more complex if the interburden/parting between them is thin. Conventionally, the depillaring with

    Jan 1, 2004

  • SME
    James R. Arnold: An Interview With the 2007 SME President

    How did you get into mining; were you from a mining town or mining family? Not at all. I grew up in northwest Kansas. I liked to hunt and fish, so I thought it would be fun to work for a company

    Jan 1, 2007

  • AIME
    Minerals And International Trade

    By Joseph C. McCaskill

    The writer assumes that this volume is not intended to serve as a source of statistics on international trade and that the reader is not interested in wading through a lot of statistical tables copied

    Jan 1, 1976

  • SME-ICGCM
    Development of Low Profile Remote Roof Bolting Module

    By Bill Kyslinger

    In underground mining, machine design is predominantly dictated by mine conditions and individual customer desires. In partnership with Boart Longyear Poland and KGHM, J. H. Fletcher & Company was ta

    Jan 1, 2006

  • SME-ICGCM
    Subsidence Misconceptions And Myths

    By Richard E. Gray

    Subsidence due to coal mining is poorly understood by non-specialists. This has led to numerous misconceptions and myths based on limited observations and lack of knowledge. The three most common are:

    Jan 1, 1996

  • CIM
    Geological Modeling and Estimating Recoverable Reserves in Vietnam

    By Vu Van Dong

    Resource estimation is the science of determining the amount and quality of a given material in the ground that has the potential to be mined at a profit. This is because during this time computers ha

    Oct 1, 2009

  • SME
    Technical Note - Southern Illinois white tripoli as filler, extender, and abrasive

    By D. M. Avant, A. J. Solomon, S. M. Pickering, W. R. Fox

    Introduction Most high purity silica is produced from crystalline quartz, generally from sand. However, there is a small area of southern Illinois where a porous, friable white chert rock is found

    Jan 12, 1986

  • IIMP
    Seguridad y calidad como una ventaja competitiva

    By Orlando Ramírez

    El presente trabajo describe el sistema integrado de seguridad a través de la norma OSHAS 18001 - 1999 y calidad ISO 9001 – 200m, donde la aplicación de la integración controla las desviaciones de lo

    Sep 12, 2005

  • NIOSH
    Multiple Seam Longwall Mining In The U.S.—Lessons For Ground Control

    Relatively few longwall mines in the U.S. operate under multiple seam conditions where the two seams are less than 200 ft apart. This paper describes the experience of six that do. These operations

  • AUSIMM
    Handling and Transportation of Industrial Minerals with Special Focus on Shipping and Distribution in North America

    I would like to thank The Australasian Institute of Mining and Metallurgy for inviting us to share with you some of our experiences in the handling, storage, and transportation of industrial minera

    Jan 1, 1989

  • AUSIMM
    Drilling Equipment for Difficult Coring Conditions A New Type Core Lifter and Triple Tube Core Barrel

    Considerable improvements in diamond drilling equipment have been made since the early 1950s. A recent drilling programme, however, at Williamtown, near Newcastle, carried out by the Joint Coal Board

    Jan 1, 1967

  • SME
    Critical Review Of Numerical Stress Analysis Tools For Deep Coal Longwall Panels Under Strong Strata - Preprint 09-011

    By M. K. Larson

    Proper employment of numerical stress analysis design tools is based on the demonstrated ability of a model to capture key elements of the geologic site model and accurately simulate how these element

    Jan 1, 2009

  • CIM
    Review of Comminution Practice

    By Ronald E. Hamilton

    "An attempt to review the recent literature on comminution reveals at once that the subject has many ramifications and that the applications are so diverse that there are very few general statements w

    Jan 1, 1976

  • CIM
    A Review of Suncor Energy’s Millennium Extraction Process

    By Michael Godard, Peter Cleyle

    "Suncor Energy’s Project Millennium increased oilsands production capacity by an additional 95,000 barrels per day to its present level of 225,000 barrels per day. This massive venture included an exp

    Jan 1, 2004

  • NIOSH
    Design Considerations For The Next Generation Of Longwall Shields

    By Thomas M. Barczak

    Advancements in support technology have occurred to a large extent because of the demands of the mine operators. Shield supports are no exception. The most notable changes in shield technology in the

  • NIOSH
    A Strategy for Coal Mine Respirable Dust Sampling Using Multi-stage Impactors for Characterization Purposes

    By J. M. Mutmansky, C. Lee

    "IntroductionRecognition of Coal Workers' Pneumoconiosis (CWP) as a major occupational disease has affected various aspects of the coal mining industry in the United States as well as in almost all ma

    Mar 1, 1989

  • DFI
    Peribonka Dam In Canada A Showcase Of Advanced Ground Engineering Techniques

    By Mazin Adnan

    The 80m high dam at the Peribonka river in the Canadian province of Quebec was designed for the generation of 385 MW of hydro electrical power (Fig.1). The complex ground conditions required the e

    Jan 1, 2008

  • ABM
    Gestão De Indicadores De Desempenho Em Tempo Real Aplicados A Laminação, Zincagem E Folhas Metálicas

    By Alexsandro Marcio da Silva

    Com o objetivo de prover informações precisas, coesas e em tempo real aos gestores da Diretoria da Usina Presidente Vargas (UPV) para a tomada de decisões, foi criado o projeto para Gestão de Indicado

    Jul 30, 2018