Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Some Analyses of Mount Lyell Ores, Rocks. ETC

    These may be of interest to members examining the collection of ores, etc., from Mount Lyell, which is a feature of the Victorian Gold Jubilee Exhibition, and may have some value as geological records

    Jan 1, 1902

  • AUSIMM
    Engineering and Science in Flotation Cell Design

    By J Euston

    In the 1990s round flotation tanks were introduced as a result of the lower fabrication costs for larger cells. It was soon observed that round tanks held a number of further advantages over the tradi

    Aug 8, 2011

  • AUSIMM
    Characterisation of Ore Crushability Using Petrophysical Properties

    By P Fullagar

    Automated multi-sensor core loggers (MSCL) measure petrophysical properties of diamond drill cores, including gamma density, P-wave velocity, electrical conductivity and magnetic susceptibility. A Geo

    Jan 1, 2009

  • AUSIMM
    What Can Go Wrong in Comminution Circuit Design?

    By P Staples, G Lane, S Morrell

    The design of semi-autogenous grinding (SAG) mill based comminution circuits for the treatment of competent ores, similar to those at Geita and Boddington, involves the same process of sample selectio

    Jan 1, 2009

  • AUSIMM
    Recovery of Copper from Chalcopyrite Concentrate by Means of Sulphur Activation, Cupric Chloride Leach, and Electrolysis

    Extraction of copper from a chalcopyrite concentrate by means of a cupric chloride leach is described. Initially the concentrate is mixed with sulphur in a 9: 1 ratio, and heated to 350-400°C. Th

    Jan 1, 1974

  • AUSIMM
    Full-scale Flow Marker Experiments at the Ridgeway Deeps and Cadia East Cave Operations

    By B Mobilio, G B. Sharrock, J L. Lett, I Brunton, T Thornhill

    Full-scale marker experiments at Cadia Valley underground operations have been ongoing for over 14 years. Initial marker experiments were undertaken in the Ridgeway sublevel cave (RW) (2002), and subs

    May 9, 2016

  • AUSIMM
    Open Cut Mining Adjacent to Ephemeral Creek and Spring Systems ù Pilbara, Western Australia

    The Pilbara region, located in the north-west of Western Australia, is significant as the second-largest source of iron ore on the planet. Iron ore mines owned and operated by Pilbara Iron are located

    Jan 1, 2006

  • AUSIMM
    Assessing static liquefaction for upstream tailings dams

    By A Litwinowicz, M Laxman, A Fourie, A L. Li

    This paper presents a design approach and analytical methods that were used for assessing the potential of static liquefaction and developing the mitigation measures for a tailings dams. The rigour of

    Jul 1, 2021

  • AUSIMM
    Design to closure – construction of detailed rehabilitation designed iron ore waste rock dumps based on upfront site specific assessment

    By A Kemp, I Taylor, S C. Lamoureux

    Detailed landform designs were completed for six (integrated) iron ore waste rock dumps at a Western Australian iron ore mine site to meet closure objectives and to optimise material movements for clo

    Jul 24, 2017

  • AUSIMM
    New Slurry Sampling Systems for Mineral Processing Plants

    By J Weir

    Accurate sampling of slurry streams is extremely important for metallurgical accounting in mining operations, not only for measuring the ore grade from the mine, but also for measuring the recovery of

    Jan 1, 2002

  • AUSIMM
    Stripping of the Southern Exhaust Airway at Mount Lyell

    In the latter half of 1973 a contract was given to Roberts-Holland Joint Venture for the stripping of the southern exhaust airway.The contract was carried out efficiently and relatively cheaply. It wa

    Jan 1, 1974

  • AUSIMM
    Tectonic Severance of Links between Placer Gold and its Sources, Southern New Zealand

    By D Craw, P Upton

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. The Otago Schist belt of southern New Zealand hosts widespread orogenic gold deposits. Eros

    Mar 18, 2015

  • AUSIMM
    Gravity Concentration ù A Better Way (or How to Produce Heavy Mineral Concentrate and Not Recirculating Loads)

    By D Wyatt, J Domenico, W Kow

    Over the past few years developments in heavy minerals processing have concentrated on the mineral separation portion of the business. The best example of this would include new developments in rare-e

    Jan 1, 2001

  • AUSIMM
    Estimating Mine Operating Costs - Trials and Tribulations

    The projection of operating costs for mining, processing, and other site operating costs is an exercise which can be fraught with considerable peril. Not only are the physical characteristics of eac

    Jan 1, 1990

  • AUSIMM
    Roof Bolting at John Darling Colliery, Belmont, New South Wales

    Experiments in the bolting of a mine roof were commenced at Elrington Colliery on the South Maitland Coal Field early in 1949, following the appearance of an article in the American publication, &quot

    Jan 1, 1954

  • AUSIMM
    Why combine reverse circulation and diamond drilling in Mineral Resource estimation at Purnama?

    By A N. Kasnanto, D A. Sims, J Pocoe, B Pulungan

    In this case study we compare the sampling quality of diamond drilling (DD) and reverse circulation (RC) drilling at the high sulfidation Purnama gold–silver (Au-Ag) deposit located in northern Sumatr

    Sep 20, 2017

  • AUSIMM
    Is a 2.5áper cent Success Rate Good Enough? Traditional Mine Development Methods have the Tail Wagging the Dog

    By J Jackson, D C. Curry, A C. Keith

    Australian Bureau of Statistics (ABS) data shows that since 2006 the balance of capital costs associated with mine development has become weighted greater than 75 per cent to enabling infrastructure a

    Sep 29, 2013

  • AUSIMM
    Accurate Underground Wireless Ranging and Tracking

    By M Hedley

    Tracking plant and personnel in underground environments provides multiple potential benefits for a mine including increasing safety, better monitoring of production, traffic control, and in the futur

    Mar 21, 2011

  • AUSIMM
    Post-Mine Leaching of Galena and Marmatite at Broken Hill (ea61d7ab-2e88-4fdc-9bea-cd90f66cb557)

    By Blanchard R

    The discussion submitted by Drs. Stillwell and Edwards is at once helpful and gratifying to the authors. Their contribution deals with two phases of the problem-(I) an additional suggestion for the re

    Jan 1, 1943

  • AUSIMM
    Relocatable modular beneficiation creates value from waste

    By T Graham

    Traditional iron ore wet beneficiation plants are large multilevel structures, often integrated into centralised processing plants. They are characterised by sizeable footprints, substantial water and

    Jul 24, 2017