    Rethinking variogram modelling

    By A Boucher, M Baudin, P Androszczuk, I Minniakhmetov, A Rigby, P Machado, M Wright, B Van Dijken

    IGO Ltd’s (IGO’s) Nova Operation (Nova), which is 160 km east-north-east of the town of Norseman in Western Australia (WA), mines and processes nickel-copper-cobalt (Ni-Cu-Co) sulfide ore from the mag

    Mar 22, 2022

  • AUSIMM
    The Care and Maintenance of Winding Ropes and Attachments, as Practised at the South Mine, Broken Hill, N.S.W.

    By Howell M. W

    The purpose of this paper is to outline the main points in the construction of the various types of wire ropes more commonly used for winding in Australia; and the maintenance of the ropes, and cage a

    Jan 1, 1940

  • AUSIMM
    Peanuts and Tunnel Stuffing - The Brightwater Conveyance System East Contract

    By M E. Trim, J J. Johnson, W Cranston

    The Brightwater conveyance system is located near Seattle, Washington in the north-western United States. The East Contract portion of the system consists of a 4.3 km long, 5.9 m diameter tunnel in so

    Jan 1, 2008

  • AUSIMM
    Incorporation of a Full Process Plant Model as an Active Constraint for Mine Planning and Production Scheduling

    By P Cesare, S Munro, D Wandel, R A. Bearman

    Consideration of the processing plant operational envelope is a key factor in production scheduling,and therefore mine planning, for any mining operation. In many cases hard-wired or regressionbased t

    Nov 24, 2014

  • AUSIMM
    Is Truck Queuing Productive?

    By P Malkin, S Thomas, P M. Stone, D Kostyuk

    In open pit mining, it is common that the bottleneck to productivity and profit lies in the truck-shovel mining operation, especially as strip ratios and mining intensity have increased with resource

    Nov 24, 2014

  • AUSIMM
    The Network Centric Mine

    By G Malherbe, J Gonzalez, D C. Franklin, J Bassan, C T. Farrelly

    To respond to ever-increasing challenges, mining companies have been experimenting with new business models and technologies in order to speed mine development, production, processing and transport. T

    Nov 20, 2012

  • AUSIMM
    A Review of ISO 5802:2001 Industrial Fans - Performance Testing In Situ

    By K J. Lownie, T Rafferty

    The in situ testing of mine ventilation fan systems has been a contentious issue for many years. Site testing was generally undertaken by adapting standards that were developed for the laboratory test

    Jul 1, 2013

  • AUSIMM
    Exploring the Use of Fibre Reinforced Shotcrete in Large Diameter Shafts

    By D J. Kilkenny, D A. O’Toole, P B. Hills, K L. Seah

    An investigation was undertaken to critically analyse the use of fibre reinforced shotcrete (FRS) for a variety of applications in large diameter shafts. Those applications included the use of FRS wit

    Nov 5, 2014

  • AUSIMM
    Overburden Volume Estimation Assisted by Geostatistics in Open Cast Coal Mine

    By Koppe J. C, Costa J. F C L

    This paper compares different results for overburden volume estimation assisted by geoestatistics, particularly using kriging methods. The main goal is to obtain the most reliable digital terrain mo

    Jan 1, 1995

  • AUSIMM
    Environmental and Social Constraints to Mineral Mining Projects – Finding the Key to Unlock the Resource

    By A M. Avis

    This paper presents an overview of recent developments in the Environmental Impact Assessment (EIA) process to provide the background for a more detailed analysis of environmental and social constrain

    Oct 5, 2011

  • AUSIMM
    Clem Jones Tunnel – A Study of the use of Precast Concrete for Quick and Efficient Construction

    By M Hawkins

    The Clem Jones Tunnel (formally known as the North-South Bypass Tunnel), a A$2.88 billion road tunnel project in Brisbane, Queensland, was successfully completed almost seven months ahead of schedule.

    Mar 8, 2011

  • AUSIMM
    Cayeli Mine journey to become a safer mine with an innovative approach – Think! Safety Program

    By S Flanagan, M M. Mete, A R. Tiryaki, M Guresci

    First Quantum Minerals (FQM) operates the Cayeli underground copper mine in Turkey. In response to a lost time incident (LTI) that occurred at the mine in 2022, the mine management decided to introduc

    Apr 16, 2024

  • AUSIMM
    Using Process Safety Management to Manage Risk in Mineral and Metals Facilities

    This paper explores the use of a Process Safety Management (PSM) system to manage risk in the mineral processing and metallurgical refining industries. Important elements of a PSM system are described

    Jan 1, 2003

  • AUSIMM
    An initial review of conceptual alternative layouts for production areas in Kiirunavaara mine

    By F K. Altuntov

    The study presented in this paper is based on the Kiirunavaara underground mine located in the northern part of Sweden. The deposit is mined using the sublevel caving (SLC) mining method. This paper b

    Mar 29, 2023

  • AUSIMM
    Newmont Waihi Operations ù An Overview

    The Newmont Waihi Operations are centred on the Martha mine at Waihi, New Zealand. The mine has produced over 6.6 million ounces of gold from both openpit and underground sources since operations bega

    Jan 1, 2002

  • AUSIMM
    Contract Considerations and Other Critical Ventilation Aspects in Achieving a New Mine Ramp Up

    By B Broad

    "Establishing ventilation in the early stages of a new mine is an essential step to achieve scheduled outcomes that ultimately drive the financial success of an operation. If the primary ventilation i

    Jul 1, 2013

  • AUSIMM
    Alternatives to Conditional Simulation for the Estimation of Iron Grade Distributions ù A Case Study From BHP BillitonÆs Mt Whaleback Operations

    Conditional simulation can be used to determine the probabilities of block iron-grades being above selected cut-offs. However, there are much faster alternatives that can produce acceptable results. I

    Jan 1, 2005

  • AUSIMM
    Geostatistics and Sample Numbers from an Acid and Metalliferous Drainage Perspective

    By C Linklater, A Garvie, D Kentwell

    Various Australian and international regulatory bodies (Environmental Protection Authority, 2015) require an early assessment of the geochemistry of waste rock. This usually includes estimates of the

    Jun 28, 2016

  • AUSIMM
    An explosion of variety in the DeGrussa structural vineyard

    By P J. Willems, B J. Junor

    Blackwater Mine is in the central-southern Bowen Basin, immediately south of the township of Blackwater on the Capricorn Highway. The current open cut operation extracts coal from three main seams, de

    Mar 22, 2022

  • AUSIMM
    Ore Block Design in Narrow Vein Gold Deposits – Estimate or Simulate?

    By G D. Matthews, M E. Haylett, S Khosrowshahi, A Weeks

    In narrow orebodies the use of ordinary kriging (OK) may pose certain limitations when used for grade control modelling. The smoothing effect of kriging, by its very nature, cannot retain or accuratel

    Aug 18, 2014