Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Designing and Operating Backfill Systems on a South African Gold Mine

    For effective backfilling, a system with the 13 features covered under the section: effective backfill systems, is required. Effective backfilling cannot be done with systems that are badly designed,

    Jan 1, 1998

  • AUSIMM
    Tailing Thickener Operability and Control Improvements at ProminentáHill

    By J Lombardi, M Weidenbach

    "OZ MineralsÆ Prominent Hill copper-gold concentrator is located 650 km north-east of Adelaide, 130 km north-east of BHP BillitonÆs Olympic Dam operation and 130 km south-east of the regional township

    Oct 29, 2012

  • AUSIMM
    Development of an acQuire Based Geotechnical Data Management System

    By V Pere

    A geotechnical data management system has been developed to manage drillhole and mapping data generated from in house and consultant administered field programs. This system comprises a data collectio

    Aug 22, 2011

  • AUSIMM
    Project Management for All Seasons ù Financial Risk Mitigation in a Challenging World

    By O C. Aitken

    Mining project developers are committed to taking on all the challenges and obligations of financial risk management. It is interesting that our current models of project finance have not changed mark

    Jan 1, 2004

  • AUSIMM
    The Influence of Pyrite on Galena Oxidation and Subsequent Flotation

    Folklore suggests that oxidation is detrimental to sulfide mineral flotation, and in many instances is the reason given for values reporting in the tailing. However, while a considerable body of work

    Jan 1, 2005

  • AUSIMM
    Determination of the Transition Point from Open Pit to Underground Mining

    By A K. Ghosh, J Chung, E Topal, M Asad

    "Many open pit (OP) mines with considerable vertical extent are approaching the end of their life-of-mine; some of them are seeking the opportunity to make the transition from OP to underground (UG) m

    Nov 15, 2016

  • AUSIMM
    Automated Multi-Drills in Rio Tinto

    By C McHugh, F Oppolzer, B Rogers, A Stokes

    Rio Tinto has embarked on a journey to use automation to improve the performance of its surface mines. The driver for automation has more to do with improving the accuracy and consistency of mining pr

    Sep 18, 2012

  • AUSIMM
    æShot to ShovelÆ ù Understanding the Impact of Muckpile Conditions and Operator Proficiency on Instantaneous Shovel Productivity

    By J Battista, J Grace, I Brunton

    The need to better understand and develop strategies to improve instantaneous shovel productivity at the Cadia Hill Open Pit Mine (CHM) instigated the development of the æShot to ShovelÆ project. This

    Jan 1, 2004

  • AUSIMM
    The Composition of Some Copper Slags From Port Kembla

    INDEX OF CONTENTSBlast Furnace SlagsForehearth AccretionsConverter SlagsConclusionsIllustrationsCOMPOSITION OF SOME COPPER SLAGS FROM PORT KEMBLASamples of copper slags from the Port Kembla Smelter of

    Jan 1, 1949

  • AUSIMM
    Learning from Simulation at Boddington Gold Mine

    Various methods and software have been trialled for simulation of Au grades at Boddington Mine. This covers in-house and public software as well as sequential and turning bands methods. The diversity

    Sep 26, 2011

  • AUSIMM
    Measurement of Residual Shear Strength Using a Modified Direct Shear Apparatus

    By L Tatnell, R Mackay, A Tolooiyan

    The multi-reversal direct shear test (MRDS) method is commonly used to measure the residual shear strength of soils. However, when the standard direct shear (DS) apparatus is used, the MRDS method is

    Nov 5, 2014

  • AUSIMM
    The Path to Best Practice at Geita Gold Mine

    By M Monaghan, B S. Gregory

    The Geita Gold Mine is located 80 km southwest of the town of Mwanza in the north-west of Tanzania and is 100 per cent owned by AngloGold Ashanti Limited. Open pit mining commenced at Geita in 2000. I

    Sep 18, 2012

  • AUSIMM
    A New Approach to Metallurgical Accounting

    By S Brochot, M-V Durance

    In many cases, current metallurgical accounting practice does not consider the errors associated with the measurements used in obtaining the metal balance. Considering all measurement errors, includin

    Oct 29, 2012

  • AUSIMM
    Embedding Geometallurgy into Mine Planning Practices – Practical Examples at Olympic Dam

    By H Bruyn, K Ehrig, V Liebezeit, A Robertson, M Smith, D Grant

    "The Olympic Dam geometallurgy program has generated a large quantity of data that has been used to create a geometallurgically enabled block model. An ongoing challenge is to convert data into usable

    Jun 15, 2016

  • AUSIMM
    Real time phosphorus analysis using GEOSCAN on belt analysers at Assmang Khumani Mine in the Northern Cape

    By L A. Balzan, F Nieuwenhuys

    GEOSCAN on belt analysers have been widely utilised in iron ore for nearly two decades. Since the first installations in 2003, the availability of accurate and reliable grade data has become standardi

    Nov 8, 2021

  • AUSIMM
    The Benefits of Using SmartEar™at Pueblo Viejo

    By D Shuen, R Sales, D La Rosa

    Semi-autogenous grinding (SAG) mill control is complex and depends on many dynamic process variables. Good control strategies ensure that a mill is operating as close to optimal as possible, resulting

    Sep 1, 2014

  • AUSIMM
    Design and Specification of Permanent Shotcrete Tunnel Linings

    By D Mather

    Fibre reinforced shotcrete has long been accepted as temporary ground support in both mining and civil tunnel linings. Greater knowledge and understanding of shotcrete as an engineering material and a

    Mar 8, 2011

  • AUSIMM
    A Remote, Rapid and Accurate Three-dimensional Ore Waste Boundary Tracking System

    By A T. Spathis, K E. Leslie, K R. Blay

    Many open pit mining operations seek to control blasting-related movement of ore and waste to minimise loss and dilution. Tracking the movement of ore boundaries can result in the maximisation of ore

    Aug 24, 2015

  • AUSIMM
    The Hydrogeological Problems of Groundwater Protection in Mining Regions

    The investigations of the Leningrad ruining lilstitute on this problem are carrying out in the following main directions: 1) The analysis and study of contaminants migration at particular sites of m

    Jan 1, 1988

  • AUSIMM
    Upstream Raising of Laterite Nickel Tailings Storage Facilities

    By D A. Williams, J C. J Boshoff

    The properties of tailings that emanate from laterite nickel processing plants are significantly different to most other mine tailings. They typically comprise a mixture of fine materials that are mad

    Jul 27, 2015