Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    A Microstructural Study of the Fatigue and Dwell-Fatigue Behaviour of ATI 718plus® Alloy

    By S. Oppenheimer, P. Au, R. M. Kearsey, J. Tsang, E. McDevitt

    A new superalloy, ATI 718Plus® Alloy (718Plus), has been developed to have a 55oC higher temperature capability over the traditionally used Alloy 718, while maintaining favourable processing character

    Jan 1, 2010

  • CIM
    Thickened Tailings and Red Mud Disposal

    By V. L. Mitsopoulos

    This paper provides a summary of tailings disposal techniques and the improvements that have been made through the introduction of thickened tailings disposal. The general properties and characteristi

    Jan 1, 2006

  • CIM
    Design Methodology for Large Underground Powerplants

    By R. Plassart, F. Laigle

    "As a powerhouse, a transformer or a valve chamber, large underground caverns are a major element of hydropower plant. On the contrary to galleries and shafts which are linear and long underground str

    Jan 1, 2015

  • CIM
    A Study of Present-Day Grinding

    By L. E. Djingheuzian

    Introduction Cylindrical grinding mills have been used for a long time, but during many years of testing no methods were established that gave consistent results. The work by both scientific invest

    Jan 1, 1949

  • CIM
    Model Predictive Control of the Flotation Process

    By Donald Leroux, Martin Suichies, Andy Trusiak, Chris Dechert

    "In modem concentrators, the operation of flotation machines is often stabilized by simple control loops. Froth level, slurry density and aeration rate are all physical parameters typically controlled

    Jan 1, 1999

  • CIM
    Development of the Rainy River Gold Project and Processing Plant

    By Paolo Toscano, Dave Hall

    "This paper discusses the project history, process design and layout of the Rainy River Gold Project mill. The circuit consists of a 55 x 83 primary crusher, 15 MW SAG mill and 15 MW ball mill. Both m

    Jan 1, 2016

  • CIM
    Some Modern Methods of Using Coal

    By F. W. Gray

    Ideal utilization of the heat energy in coal should theoretically be secured by supplying each atom of combustible material present with the exact quantity of oxygen necessary for complete combination

    Jan 1, 1924

  • CIM
    Generating Station Coal Quality

    By D. A. Pirttinen

    The promotion of improved coal quality for thermal generation can benefit our national economy. The construction of electric generating facilities in Canada is expanding at a rapid rate to satisfy the

    Jan 1, 1961

  • CIM
    Results and Significance of Drilling Operations in the Athabaska Bituminous Sands

    By G. S. Hume

    Introduction Core drilling of the bituminous sands of northern Alberta has been carried on by the Mines and Geology Branch, Department of Mines and Resources, under the supervision of the Director,

    Jan 1, 1947

  • CIM
    Is an Autonomous Haulage System Better than a Manual System?

    By J. Parreira

    This paper presents a deterministic/stochastic model that was created to compare an autonomous haulage truck system to a manual one by calculating and estimating benchmarked Key Performance Indicators

    Aug 1, 2013

  • CIM
    Global Approach to Managing Deep Mining Hazards

    A series of fault slip seismic events have occurred at Garson mine. The events have occurred during development advancement exposing faults, after the extraction of single stopes due to mining induced

    May 1, 2009

  • CIM
    The Nanuq Diamond Project, Rae Domain, Western Churchill Province, Nunavut

    By Jennifer Pell

    Dunsmuir Ventures? Nanuq diamond project is located approximately 250 km northeast of Baker Lake and 170 km north of Chesterfield Inlet. It occurs at the intersection of the Wager Bay shear zone with

    May 1, 2004

  • CIM
    Blasting technology: The challenge of the '80's

    By Wm. L. Giachino

    "Over the last 10 years, C-1-L has played a significant role in the major advances that have taken place in blasting technology, among them the following: development and introduction of capsensitive

    Jan 1, 1980

  • CIM
    National Instrument 43-101, standards of Disclosure for Mineral Projects (NI 43-101)

    "NI 43-101 is a rule that governs how issuers disclose scientific and technical information about mineral projects to the public in Canada. The disclosure standards apply to oral statements as well as

    Jan 1, 2003

  • CIM
    Investigation of Block Geometrical Properties of the Shale-Limestone Chaotic Complex bimrock of The Santa Barbara Open Pit Mine (Italy)

    By N. Coli

    The exhausted Santa Barbara open pit mine (Tuscany, Italy), owned by the main electric power company in Italy (ENEL S.p.A,) extracted lignite as a fuel for the Santa Barbara thermoelectric power plant

    May 1, 2009

  • CIM
    The Cumberland Basin - A Possible Rift

    By R. D. White

    "The Cumberland Basin of Nova Scotia has long been considered a structural basin by virtue of the elliptical outcrop and inward dip pattern of the Pennsylvanian outcrops. Recent published and unpublis

    Jan 1, 1972

  • CIM
    Geology of the Brunswick Mining and Smelting Orebodies, Gloucester County, N.B.

    By E. R. Lea

    The B. M. & S. orebodies, consisting of the No. 6 (Brunswick) and the No. 12 (Anacn Leadridgz, have the distinction of being the first major 1base metal ore deposits to be found in the Province of New

    Jan 1, 1958

  • CIM
    No. 2 Shaft Raise, Aunor Gold Mines, Ltd.

    By G. H. Montgomery

    THE PROPERTY of Aunor Gold Mines, Limited, consists of eleven claims, located in Deloro township, approximately three miles southeast of the town of Timmins. Production began in 1940 and currently the

    Jan 1, 1957

  • CIM
    Arsenic Management and Stabilization

    By K. Lundholm, A. E. Mäkinen

    "Ore grades are declining and getting more complex around the world which not only complicate the ore processing but also produce new type of requirements to manage the produce waste streams. One spec

    Jan 1, 2014

  • CIM
    On the Role of Bubble Size in Column Flotation

    By Jose R. Hernandez-Aguilar

    "Three models to predict the effect of bubble size (Db) on metallurgical response were tested in a pilot-scale flotation column at Teck Highland Valley Copper mine. The column was fed with slurry coll

    Jan 1, 2011