Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    Pile-Supported Raft Foundation System

    By Emre Biringen

    Over the past decades, there has been an increasing recognition of the strategic use of pile-supported rafts in design of heavily-loaded structures to reduce total and differential settlements. Howeve

  • DFI
    Very Deep Piling For The Highrise ‘De Zalmhaven’ In Rotterdam (Nl)

    By Ed Revoort, Robert Schippers

    In Rotterdam in the Netherlands the project ‘De Zalmhaven’ is being developed. The project consists of the realization of houses, parking facilities, two residential towers of 70 m and a residential h

    May 1, 2022

  • DFI
    Micropile Performance Variability: A Fundamental Case Study

    By Walter E. Vanderpool

    Type 1B micropiles (Bruce and Juran, 1997) can be installed rapidly and efficiently. During an 85-day period, 536 micropiles were installed to depths of 61 meters within a site 41 meters by 43 meters.

    Jan 1, 2002

  • DFI
    Large Diameter Open-End Pipe Pile Driveability Analysis Including Geotechnical Friction Fatigue

    By Patrick J. Hannigan, Frank Rausche, Rozbeh B. Moghaddam

    Large diameter open-end pipe piles are increasingly used as deep foundations to support heavy onshore and offshore structures. During the driving process, several factors such as subsurface conditions

    Jan 1, 2019

  • DFI
    Experiment to Determine the Influence of Groundwater Level on Grid-Form Deep Mixing Walls for Liquefaction Control

    By Tsuyoshi Honda, Kazuhiro Kaneda, Masayuki Imai, Kazuo Konishi, Kunio Higashinaka

    "In recent years, the demand for measures to control liquefaction of existing airport runways and harbor structures has increased. However, from the perspectives of constructability and cost, applicat

    Jan 1, 2015

  • DFI
    Data Drives Herbert Hoover Dike (Hhd) Rehabilitation Efforts

    By Michael Arnold, Jignyash Manyam, Yoav Rappaport

    The USACE required construction of over 13 miles of cutoff wall at an average depth of 65 feet for the Herbert Hoover Dike (HHD). To meet project requirements, to provide quality control and make soun

    Oct 1, 2022

  • DFI
    Construction of Large Drilled Shafts the 2nd Annual Mike O'neill Lecture

    By Dan Brown

    Improvements in construction equipment and techniques in recent years have made possible the use of drilled shaft foundations in diameters and lengths not previously considered practical or feasible.

    May 11, 2007

  • DFI
    Driven Pile Foundation Design and Construction Issues for a Highrise Building in Manhattan

    By Satyajit Vaidya, Rudolph Frizzi, Sandy Larimer

    "This paper presents a case history in design and construction of a deep foundation system that included high-capacity open-ended driven piles constructed to support a high-rise building in Manhattan,

    Jan 1, 2016

  • DFI
    Back Analysis of Field Instrumentation Results during Reclamation & Ground Improvement Works- A Case Study

    By Prasanta Paul, Aminul Islam

    "Nhava Sheva (India) Gateway Terminal Private Limited proposed to construct a container terminal yard, comprising a back-up area at Jawaharlal Nehru Port Terminal (JNPT), Uran, Maharashtra. The propos

    Jan 1, 2015

  • DFI
    Drilled Shaft Foundations for the Float-in Dam on the Monongahela River at Braddock, PA (6c19e969-5f09-43f8-9e6e-1837d4537e5e)

    By Robert B. Bittner

    The new gated dam on the Monongahela River at Braddock, Pennsylvania, was built for the US Army Corps of Engineers using an innovative "In-the-Wef' technology. A key feature of this technology in

    May 11, 2007

  • DFI
    Nailed It! The Great Wall of the Chinese Embassy (dbde4e01-35b2-40e7-b641-e07610069e96)

    By Fred Tarquinio, Giovanni Bonita, Lars Wagner

    "A new embassy for the Peoples Republic of China is under construction in Washington, DC. The 475,000 square feet (44,125 m2) structure has five levels below ground and four above, making it the large

    Jan 1, 2007

  • DFI
    Alignment Control Of Drilling Rods For Jet Grouting By Integrated Microchips

    By Mousaab Majar, Nikolaus Schneider

    The technical challenges for accurate drilling positions increase with deep underground structures in inner city areas. Designed for jet grouting, specific sensors have been developed to record the al

    May 1, 2022

  • DFI
    Determination Of Hydraulic Conductivity Of The Coralline Limestone Aquifer Of Jeddah, Saudi Arabia: Precautions And Recommendations For Deep Foundations

    By Mohamed A. Eliwah

    This paper deals with the determination of hydraulic conductivity of the coastal coralline limestone aquifer of Jeddah, Saudi Arabia. This coastal area has witnessed urban development and establishmen

  • DFI
    Friction Fatigue and Drivability Analysis of Open Ended Pipe Piles Based on Cone Penetration Testing Results

    By Frank Rausche, Scott D. Webster, Rozbeh B. Moghaddam

    "Pile foundation driveability is a function of several variables such as subsurface characteristics, hammer type, hammer efficiency, pile type, and plugging conditions. One important phenomenon occurr

    Jan 1, 2017

  • DFI
    Nailed It! The Great Wall of the Chinese Embassy

    By Fred Tarquinio, Giovanni Bonita, Lars Wagner

    "A new embassy for the Peoples Republic of China is under construction in Washington, DC. The 475,000 square feet (44,125 m2) structure has five levels below ground and four above, making it the large

    Jan 1, 2007

  • DFI
    Development Of Vertical-Horizontal Yield Envelopes Of Pile Group Supported Bridges Subjected To Scour

    By Aditi Sharma, Sumanta Haldar

    Scouring of soil is the major concern forthe various hydraulic structures built in the flowing rivers since scouring impacts the bearing capacity of foundations. Hence, consideration of scouring in th

    Sep 1, 2022

  • DFI
    Development of Fiber-Reinforced Soil Improvement Using CSM Method

    By Toshio Yonezawa, Helmut Florian, Herbert Kuh, Masamichi Aoki, Takao Koono, Franz-Werner Gerressen

    "To increase the bearing capacity of the ground, soil improvement technique is often adopted. One advantage of soil improvement techniques is the fact, that the impact to the environment is low, as th

    Jan 1, 2015

  • DFI
    Investigations on the Distress to the Pavements/PQC Slab around Monorail Piers, Wadala, Mumbai

    By Unnikrishnan Nair, Sandeep S. Nikam, Sanjay D. Patil, Prabir C. Basu

    "Mumbai Metropolitan Region Development Authority (MMRDA) entrusted to implement Monorail Systems in various parts of Mumbai Metropolitan Region (MMR) with the objective to supplement the present tran

    Jan 1, 2015

  • DFI
    The Secret to Dewatering

    By Gregory M. Landry

    "There is an old joke at Moretrench that defines dewatering as “that element of an underground construction project, which, when disregarded, will generate the low bidder.” Sigmund Freud wrote that al

    Jan 1, 2017

  • DFI
    Signal Anomalies in Crosshole Sonic Logging Testing with a Case Study in Metro Manila

    By Benjamin B. Buensuceso III

    Crosshole sonic logging (CSL) is a popular quality assurance and quality control method used to examine the concrete quality of cast-in place deep foundations, though the evaluation of the results is

    Sep 8, 2021