ACIP Pile Performance and Installation in the Northeastern United StatesBy Jr NeSmith
"Augered-cast-in-place (ACIP) pile installation technology has matured extensively since the first auger, pressure grouted pile was patented in 1959. The current technology allows for successful pile
Jan 1, 2016
-
Advanced Continuous Surface Wave Testing (Acsw): Geologic And Geotechnical Site Characterization For The 21St CenturyBy David Wilshaw
Continuous Surface Wave (CSW) testing has been the “next big thing” in ground characterization for the last 25 years. The technique uses surface geophones to measure the speed at which Rayleigh waves
Oct 1, 2022
-
Interpretation and Evaluation of Thermal Integrity Profiling MeasurementsBy Seth Robertson, Daniel Belardo, Travis Coleman
Thermal Integrity Profiling (TIP) is a non-destructive method used to evaluate drilled deep foundation integrity. This integrity testing method is specified more frequently, and is becoming an indust
Sep 8, 2021
-
Collaborative Data Sharing During Seepage Barrier Wall Construction at Bolivar Dam – Perspectives from Owner, Contractor and Sub-ContractorBy Robert Bachus, Jamey Rosen, Fabio Santillan, Georgette Hlepas
"A seepage barrier of length 4,800 feet and maximum depth 144 feet is being installed at Bolivar Dam in Ohio. This project is owned by the United States Army Corps of Engineers and contracted to Trevi
Jan 1, 2017
-
An Analysis of LRFD for Helical AnchorsBy Ronaldo Luna, Donald Deardorff
"The use of load and resistance factor design (LRFD) is well documented since the 1960s for structural applications when it was first adopted into the American Concrete Institute Building Code in 1963
Jan 1, 2009
-
Wick Drain Guide Specification (Method)"1.0 DESCRIPTIONThis work consists of furnishing all necessary labor, equipment, and materials to install prefabricated vertical (wick) drains in the ground in accordance with the Plans and as specifi
Jan 1, 2014
-
Lateral Stresses On Multilevel Tieback WallsBy Liiban A. Affi
The most difficult task of designing multilevel tieback walls for deep excavation support is the determination of lateral stresses. These lateral stresses act not only on the shored height, but also
Jan 1, 2010
-
The Use of Controlled Modulus Column (CMC) Ground Improvement for Support of Large WarehousesBy Brandon T. Buschmeier, Sonia S. Swift, Michael P. Walker, Frederic Masse
"Ground improvement has undoubtedly become a cost-efficient and effective solution to support the development of poor soil sites. Ground improvement elements, such as Controlled Modulus Columns (CMCs)
Jan 1, 2017
-
A Tall Slender Tower Rises On Secant Piles and Drilled ShaftsBy Renzo D. Verastegui, T. C. Michael Law, Sitotaw Y. Fantaye, Alfredas Daugiala
"When completed, 520 Park Avenue will amend the Manhattan skyline and be one of the most prestigious high rise towers in New York City. The 52-story condominium building is located on a 60 by 100 feet
Jan 1, 2016
-
Nicholson In The Neighborhood: Virginia’S North Hill ProjectBy Dominic Ammon, Mark Rothbauer, Paul Landers P. E.
Across the Potomac River from the location of the DFI47 Annual Conference (October 2022), in Alexandria, VA, two large permanent anchored walls with a decorative shotcrete face were recently construct
Oct 1, 2022
-
Unified Design Of Piles And Pile Groups Considering Capacity, Settlement, And Negative Skin Friction - 1. IntroductionBy Bengt H. Fellenius
It is a truism that in the design of pile foundations one must consider both capacity and settlement. As to capacity, most basic text books contain simple methods of design of capacity of single pile.
Jan 1, 1991
-
Improvements to Commonly Used Cutoff Wall SpecificationsBy Michael Kynett, Francke Walberg, Richard Millet, Khaled Chowdhury, Mary Perlea
"Cutoff walls are the most common seepage improvement measure for levee flood control projects throughout California’s Central Valley. Cutoff walls are widely used because they can be implemented with
Jan 1, 2015
-
Soil Cement Tensile Strength and Modulus as a Function of Unconfined Compressive StrengthBy Dominic Parmantier, Jason Page
"In the past, the designers of DSM have analyzed various failure modes and then specified a minimum unconfined compressive strength (UCS) for the soil-cement. The specified minimum UCS reflected the c
Jan 1, 2015
-
Field Sampling and Testing for Soil Mixing – Uses and Misuses of Different QA/QC Tests for CDSM Projects – A Contractor’s PerspectiveBy A. David Miller, Chika Oya
"Field sampling and testing are part of the Quality Assurance/Quality Control (QA/QC) requirements for all Cement Deep Soil Mixing (CDSM) Projects. Field sampling and testing are also used for determi
Jan 1, 2017
-
Soil Improvement Through Rammed Aggregate Piers To Mitigate Liquefaction Risk In Storage TanksBy Francisco A. Flores, José L. Aguirre, Héctor A. de la Fuente, Erika Bernal, Jorge Arroyo-Esquedla
This paper presents the analysis, design, and construction of soil improvement for storage tanks foundation support at a site in Tabasco, Mexico. A total of 980 Rammed Aggregate Piers of 12.5 m in len
Oct 1, 2022
-
Large Diameter Steel Pipe Piles Running Under Self Weight In Soft Clay ' Predicted Vs. Observed Behavior ' Richmond San Rafael Bridge Seismic RetrofitBy A. R. Dover
The Richmond San Rafael Bridge (Figure 1) is a 4.3 mile long major toll bridge span across northern San Francisco Bay. Tutor-Saliba/Koch/Tidewater (TSKT) conducted a comprehensive seismic retrofit, wh
Jan 1, 2006
-
Execution Example of the Expanded Dry Jet Mixing (EX-DJM) Method (71db6e71-57a4-4d54-81bc-d746d501291d)By Kiyotaka Ohno, Nobushige Yasuoka, Yosuke Hioki
"The diameter of improved columns adopted by the original DJM Method had been 1000 mm, however, in order to comply with the social need for construction cost reduction, the Expanded Dry Jet Mixing (EX
Jan 1, 2015
-
Ultimate Lateral Resistance of Piles in Cohesive SoilBy Lassaad Hazzar
The ultimate lateral resistance of piles in cohesive soil is studied using the well-known finite difference code, FLAC2D. The Modified Cam Clay (MCC) constitutive relation is adopted in the analyses t
Aug 1, 2013
-
Shoring of Long Beach Main Pump Station Utilizing Ground Improvement Methods, Long Beach, CABy Eric Lindquist, John Compagnone, Gabriel Carvajal
"Condon-Johnson & Associates, Inc. (CJA) with the assistance of design consultant, Brierley Associates, designed and installed a water tight shoring system utilizing several ground improvement techniq
Jan 1, 2017
-
Cement Deep Soil Mixed Walls/Grout Plug for Groundwater Cut Off and Excavation Support at the Bart Warm Springs ExtensionBy Harry Schnabel, Mitchell L. Fong, Douglas R. Jenevein, Thomas S. Lee
"The Warm Springs Extension (WSX) is one of a series of projects that will eventually extend the Bay Area Rapid Transit System (BART) from Fremont to San Jose, California. A cut and cover tunnel was u
Jan 1, 2015