    Execution of Pile Installation in Environmentally Challenging Sites

    By Dena Morgan, Emre Biringen

    "Abstract This paper discusses the execution of pile installation and design issues at two environmentally challenging industrial sites in North America. Environmental regulations set constraints on t

    Jan 1, 2014

  • DFI
    East Boston Branch Sewer Relief Project: Support Of Excavation Case Study

    By Eric P. Bregman

    As part of an on-going effort to improve water quality and reduce discharge into Boston Harbor, the Massachusetts Water Resources Authority (MWRA) East Boston Branch Sewer Relief Project was designed

  • DFI
    East Boston Branch Sewer Relief Project: Support of Excavation Case Study (FULL Project)

    By Eric P. Bregman, Franklin M. Grynkewicz, John E. Regan

    "As part of an on-going effort to improve water quality and reduce discharge into Boston Harbor, the Massachusetts Water Resources Authority (MWRA) East Boston Branch Sewer Relief Project was designed

    Jan 1, 2017

  • DFI
    Micropiled Foundations of Telecommunication Towers

    By Racquel Nottingham, Marc Mastrantuono, Freddy Lopez

    In the digital era that we live in, connectivity and mobility play a decisive role in our daily activities. In this context, insufficient telecommunication infrastructure gives origin to the so called

    Sep 8, 2021

  • DFI
    Evaluation of Soil-Bentonite Backfill Consolidation Properties

    By Jeffrey C. Evans, Daniel G. Ruffing, Hejintao Huang

    Soil-bentonite slurry trench cutoff walls are the most common type of vertical cutoff wall used in the US for seepage control and for passive control of contaminant migration at environmental sites.

    Jan 1, 2016

  • DFI
    Applications of Nondestructive Testing Methods for Mass Foundation Blocks - Feasibility Study

    By Hamed Layssi, Farid Moradi, Thomas Tingson

    This paper describes the feasibility and pilot study of of using existing non-destructive testing solutions for evaluating structural integrity and mechanical performance of mass concrete foundations.

    Sep 8, 2021

  • DFI
    Design And Construction Of The Deepest Cfa Pile In Australia

    By W. L. Chong

    For a project located in Docklands Victoria, a high-rise development was proposed where the geology comprised soils of various compositions and consistencies to approximately 50m deep before being und

    Nov 1, 2022

  • DFI
    Understanding The Vibratory Pile Driver/Extractor: A Field Man's Perspective - 1. What Is A Vibro Driver/Extractor And How Does It Work?

    By John L. White

    The vibro driver/extractor is a machine that grips to a pile and vibrates it up and down. When the vibrating pile is lowered into the ground, all soil around the pile begins to vibrate. A vibrating pi

    Jan 1, 1990

  • DFI
    Metro Sports Facility – A Ground Improvement Case Study

    By I. D. McPherson, Dominic P. Mahoney

    The Metro Sports Facility is currently under development in Christchurch, New Zealand and is a key Anchor Project in the city’s post-earth quake recovery. When completed it will be largest indoor spor

    Nov 1, 2022

  • DFI
    Evaluation of Elongation Criteria and Friction Loss in Ground Anchors

    By John P. Turner, Benjamin J. Turner

    "This report describes a research project for evaluating the applicability of the widely accepted 80 percent criterion for elongation of ground anchors to anchors with unbonded lengths exceeding 100 f

    Jan 1, 2017

  • DFI
    Construction Of Two Microtunnel Access Shafts Using The Cutter Soil Mix (CSM) Method In The San Joaquin Delta, California

    By Eric S. Lindquist

    Two microtunnel access shafts were constructed using the Cutter Soil Mixing (CSM) method in the San Joaquin Delta region of California, east of San Francisco. Unlike conventional slurry walls and diap

    Jan 1, 2010

  • DFI
    Effects of Atmospheric Conditions on Energy Pile Performance

    By Melissa S. Beauregard, Randall A. Pietersen

    This study focuses on quantifying the effects of water infiltration on a full-scale energy pile system’s ability to meet the thermal demand of an HVAC system. Theoretically, an energy pile system shou

    Jan 1, 2019

  • DFI
    Analysis of Panel and Pile Verticality and Overlap in a Project Information Management System

    By Jamey Rosen, Georgette Hlepas

    Verticality data collected from panel and pile elements of seepage barrier walls describe the shape and position of those elements in three dimensions. These data are used to determine if a barrier wa

    Sep 8, 2021

  • DFI
    Artificial Ground Freezing – A Typical Application for the Underpass of an Existing Metro Station in Rome

    By Bruno Vingiani, Alessandro Bertero

    "The use of Artificial Ground Freezing (AGF) for temporary soil strengthening and seepage control is an effective alternative to grouting when dealing with soils whose degree of finesses would imply t

    Jan 1, 1900

  • DFI
    Execution of Diaphragm and Cut-Off-Walls in Rock – Applications, Performance and Limits

    By Albert Neumann, Franz-Werner Gerressen, Giancarlo Santarelli

    "Diaphragm walls are known as underground structural elements commonly used for retention systems and permanent foundation walls or elements. In addition they are also quite often used as deep groundw

    Jan 1, 2016

  • DFI
    The Use of DSM Columns to Control Heavy Haul Railway Embankment Stability

    By Kim Chan, Bryn Thomas, Ben Dening

    "Increased rail capacity is required into Kooragang Coal Terminal near Newcastle, NSW, Australia to relieve rail traffic congestion and improve management of train arrivals. An additional arrivals tra

    Jan 1, 2015

  • DFI
    Presentation #2 - Non-Destructive Testing For Drilled Shafts - Contents

    By Frank Rausche

    Introduction and Background Testing -Pile Preparation -Data Processing -Data Interpretation/Case Studies Case Studies - Existing Piles Stories from around the world

    Jan 1, 2001

  • DFI
    Design, Installation, and Testing of Hollow Bar Tiebacks Used as Excavation Support

    By Marco D. Boscardin, Kenneth A. Pidgeon, Adriane G. Boscardin

    "Hollow bar tiebacks can offer an economical alternative to conventional solid bar and strand tieback systems for use in temporary excavation support construction. However, the limitations associated

    Jan 1, 2016

  • DFI
    Reverse Circulation Drilling (Rcd) Technology For Largediameter Piles

    By Nikolas Schmitz

    For today’s construction industry, large-diameter piles are common practice, as they are more competitive than drilling a larger number of smaller piles. More and more piles are installed by drilling

    Nov 1, 2022

  • DFI
    Using Multiple Pile Types On A Single Project To Maximize Benefits

    By James F. Davis, Matthew A. Conte, Robert F. Tonning

    This is a paper demonstrating the steps taken to combine multiple types of piles for a single site to maximize the benefits and characteristics of each method. We intend to discuss the use of grouted