Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    Application of Numerical Modelling to Examine Damage in Wall Control Operations

    By P. Katsabanis

    Numerical modelling was used to examine damage in wall control operations. Decoupled charges appear to create larger damage zones than fully coupled low density charges with similar charge distributio

    Jan 1, 2001

  • ISEE
    A Study on High Accuracy Delay Detonator

    By H Fukui, K Ichikawa, K Aikou, E Suzuki

    An electronic delay detonator (EDD) consisting of a digital-base electronic delay module and a conventional instantaneous detonator module, designed for series connections with a special adjustable-ou

    Jan 1, 1989

  • ISEE
    Splitting Granite Using Pyrodex

    By G Dean Barrett

    Just one year ago at the 1986 Annual Meeting of the Society of Explosives Engineers, Dr. Calvin J. Konya presented a paper entitled "Presplitting Granite Using Pyrodex, A Propellant.'' Since that tim

    Jan 1, 1987

  • ISEE
    Journal: Blastserve A Discussion Forum for ISEE Members (8c2fadf8-c3ea-4d52-bed4-9f74e7ae96c9)

    Lightning Strikes on Vehicles Transporting Explosives The police in one of the countries in which we operate has asked about the consequences of a lightning strike on a vehicle (box van) carrying deto

    Jan 1, 2011

  • ISEE
    Dewatering Small Diameter Bore Holes

    By R J. Hill

    Blasters are well aware of the problems and expense faced when trying to load in wet bore holes; problems of poor coupling and poor density, as well as the expense of higher priced cartridge product.

    Jan 1, 1986

  • ISEE
    Instrumentation and Monitoring Criteria to Determine Structural Response from Blasting

    By H Y. Fang, H Sutherland, R M. Koerner

    Due to the increased number of complaints by property owners to blasting related industries an apparent need for a clearer understanding of blasting-related damage is needed. We feel that direct struc

    Jan 1, 1976

  • ISEE
    Blasting Accidents in Underground Mines a Two Decade Summary

    By Harry Verakis, Thomas Lobb

    This paper is a summary and an update of the underground mine blasting accident investigations and studies previously conducted by the Mine Safety and Health Administration (MSHA) and the former US. B

    Jan 1, 2002

  • ISEE
    The Waiting Time Recovery Test

    By John T. Aler

    The U.S. Bureau of Mines has been studying the problem of why explosives detonate weakly or misfire during blasting in underground coal mines. Cross-borehole shock wave interaction has been identified

    Jan 1, 1991

  • ISEE
    Blasting a Very Big Boulder Under Adverse Conditions

    By Brad Johnson

    Homestake Mining Corporations' open cut operation at Lead SD. experienced a highwall failure in October of 1993. The failure released a 75' section of rock wall at the 5280' level. It came to rest on

    Jan 1, 1995

  • ISEE
    Vibration Monitoring and Control of Blasting Associated with the Construction of a Highway Next to a Show Cave

    By Paul Worsey, Gerald Rupert, Mark Kirkbride

    The realignment of Highway H in the proximity of Crystal Cave (Springfield MO.) required the development of a blasting program that was both economical and efficient for construction, yet ecologically

    Jan 1, 1997

  • ISEE
    Careful Blasting (125,000 cu.m) for a Shopping Centre in Downtown Helsinki

    By R Vuolio, B A. Jonsson

    In the center of Helsinki - capital of Finland - extensive blasting operations were carried out during the years 1982 - 84. At the corner of the streets Mannerheimintie and Simonkatu - in the Forum bl

    Jan 1, 1985

  • ISEE
    Improvements in Blasting Technology at Cliffs Natural Resources

    By Scott Giltner, Allan Koski

    Blasting is one of the lowest cost yet most critical parts of the mining cycle. This paper discusses the findings of an audit conducted on the blasting operation at an iron ore mine. The purpose of th

    Jan 1, 2009

  • ISEE
    Direct Measurement of "Borehole" Pressure of Explosives

    By Philip Barnhard, Lyman G. Bahr

    By recording the arrival time of a pipe wall at evenly spaced intervals in a plane perpendicular to the pipe axis, application of the equations of motion permits calculation of the pressure of the exp

    Jan 1, 1981

  • ISEE
    Selection of Powder Factor in Large Diameter Blastholes (fd85c28b-31b4-4c7a-b833-27f2a5d736a0)

    By Jack Eloranta

    This paper documents the relationship between material handling and processing costs compared to blasting cost. The old adage, "The cheapest crushing is done in the pit", appears accurate in this case

    Jan 1, 1995

  • ISEE
    Seismic Waves Transmitted from Rock to Water: Theory and Experience

    It has been common practice for many years to predict and control underwater blasting effects on the basis of certain simplified theories related to the pressures generated by underwater detonations.

    Jan 1, 1985

  • ISEE
    The Evaluation of Electronic Detonators at Martha Mine, New Zealand

    By Blair Jackson, Tjaart Louw

    Martha Mine, owned by Newmont Mining, Australia appointed Macmahon Contractors (NZ) Ltd as the mining contractor to drill, blast, and crush and convey ore for processing, followed by construction of a

    Jan 1, 2003

  • ISEE
    The Application of GPS Positioning and Drill Monitoring Technology

    By Carl Hendricks

    AQUILA Mining Systems Ltd. is the world leader in drill monitoring, control and GPS based drill navigation systems for the mining industry. This paper will review the general design and application of

    Jan 1, 2002

  • ISEE
    A New Generation of Drilling at the Minntac Mine

    By Don Thompson

    The Minntac Mine drills and blasts approximately 75 million long tons of taconite per year. This requires drilling one million feet of 1 6-inch diameter holes. We are in the process of replacing our o

    Jan 1, 1998

  • ISEE
    Overview of the UNI Tronic™ Electronic Blasting System

    By Albert van Niekerk, Mick Lownds

    Overview of the UNI Tronic™ Electronic Blasting System

    Jan 1, 2004

  • ISEE
    Reduction of Vibration in a Low Frequency Zone at Construtora Sultepa EV Quarry

    By D. C. Valdemeri, Oppermann J. P. Z., R. G. Schaarschmidt, C. S. Mendonca

    This case study was conducted in an aggregate company, located at Estância Velha town, RS, Brazil. The study was based on the results of vibration monitoring mainly in terms of PPV (peak particle velo

    Jan 1, 2015