Effects of flotation operational parameters on froth stability and froth recoveryBy K. Gharibi, A. Dehghani, S. Farrokhpay, M. Aghajanloo, M. Ostadrahimi
The effect of flotation operational parameters on froth stability and froth recovery was studied. Froth stability was measured using a special column. To determine the froth recovery, the froth height
Jan 1, 2021
-
The Effect Of Mode Of Occurrence Of Galena And Sphalerite On The Selective Flotation Of Ore Samples From The Rosh Pinah Mine (062bc6c9-1759-4403-85ed-af96a64d42c3)By M. D. Seke
The flotation response of a Pb-Zn sulphide ore from the Rosh Pinah Mine (Namibia) was studied in the presence of inorganic depressants such as sodium cyanide and zinc sulphate. Poor flotation selectiv
Jan 1, 2005
-
Using Machine Carousel To Reduce Cladding Support Cycle At Pk2 Ventilation ShaftBy Braam Blom
PK2 Ventilation shaft is part of Paardekraal No 2 twin shaft system that is being developed to replace depleting Merensky reef production at Paardekraal shaft complex. The sinking team at this shaft f
Jan 1, 2009
-
Determination of Optimal Fragmentation Curves for a Surface Diamond MineBy K. M. Phamotse, A. S. Nhleko
"*Paper written on project work carried out in partial fulfilment of BSc (Mining Engineering) degreeSynopsisLiqhobong Mining Development Company (LMDC) has been experiencing problems with boulders aft
Jul 1, 2019
-
Copper Mining in Zambia – History and FutureBy Cade Mweemba, Alex Mwanza, Jackson Sikamo
"The Zambian Copper mining industry as we know it today has its genesis from early in the 20th century in the 1920s. Consistent private sector-driven investment in the industry over a period of over 5
Jan 1, 2015
-
Use Of Sintered Pellets In Production Of High Carbon Ferro ChromeBy C. N. Harman, N. S. S. Rama Rao
Production of Ferro-alloys through submerged electric arc furnace involves use of electric power as one of the major inputs. Hence the production by this power intensive process can be made economical
Jan 1, 2007
-
Process Developments At Tailings Leach PlantBy Martin Banda, Gift C. Chisakuta, Moses Chabinga
KCM made a major modification to the Nchanga Tailings Leach Plant (TLP) changing the circuit from feeding post leach thickeners in parallel with leach discharge for solid ?liquid separation to a Count
Jan 1, 2005
-
Using Machine Carousel To Reduce Cladding Support Cycle At Pk2 Ventilation Shaft (311f8feb-63e6-4d23-980e-900e4671e984)By Braam Blom
PK2 Ventilation shaft is part of Paardekraal No 2 twin shaft system that is being developed to replace depleting Merensky reef production at Paardekraal shaft complex. The sinking team at this shaft f
Jan 1, 2009
-
Improved Technologies In Longhole Blast Hole Drilling, Applied To Drop Raising And Longhole Stoping As Well As The Application Of A Small Twin Boom Mechanized Drillrig?Longhole blast hole drilling? techniques are not new to the mining industry. Appropriate mechanization and improvement of the techniques and application has evolved from the industry requirements. T
Jan 1, 2003
-
Interactions Of Two-Liquid CaO-MgO-FetO-P2O5 Slag With MgO RefractoriesBy T. Tamura
It is known that the CaO-FetO-P2O5slag system has a wide liquid miscibility gap at steelmaking temperatures and this two-liquid slag phase has many advantages such as high activities of both FetO and
Jan 1, 2004
-
The Truths And Myths Of Freeze Lining Technology For Submerged Arc FurnacesBy P. L. Duncanson, J. D. Toth
Since 1995, when "freeze lining" refractory systems were introduced to the ferroalloy industry, they have gained in popularity, due to the freeze lining?s reputation for reliability, safety, and the c
Jan 1, 2004
-
The Importance of People in the Process of Converting a Narrow Tabular Hardrock Mine to MechanizationBy D. Vogt, T. Hattingh
"This paper argues that the technology change to mechanization is also going to require a change in people. It presents a model for technological progress and adapts it to the mining industry. It then
Jan 1, 2016
-
Micropore Carbon Furnace LiningBy Stefan Basista, Janusz Tomala
Modern constructions of electric ferroalloy furnaces are still based on applying in the lower "liquid" areas the standard carbon materials. What can be illustrated by the experience from several years
Jan 1, 2007
-
The viscosities and structures of calcium silicate slags containing MgO, CaF2, and A12O3By Y. D. Lee, J. H. Park, D. S. Kim, H. S. Song
The viscosities and the infrared spectra of the CaO-SiO2-MgO-CaF2(or Al2O3) slags were measured to enhance our understanding of the interrelationship among the thermophysical property, microscopic str
Jan 1, 2004
-
Non-Productive Principles Of Landscape Rehabilitation After Long-Term Opencast Mining In North-West BohemiaBy P. Sklenicka
Remediation of the environmental (and social) disturbances caused by opencast brown coal mining in the past in north-west Bohemia isa priority for state environmental policy. In order to provide a co
Jan 1, 2004
-
In Situ Stresses In Mining Areas In South AfricaThe safety of mining operations is significantly influenced by the in situ stress fields in which the mining excavations are created. From the point of view of planning of mining operations, the in si
Jan 1, 1998
-
Isasmelt Technology - Current Status And Future DevelopmentBy W. J. Errington
The Isasmelt process was developed at Mount Isa Mines Limited in Queensland, Australia in collaboration with CSIRO, the Australian Government research organisation. Originally developed for primary le
Jan 1, 1997
-
Size Dependent Gold Deportment In The Products Of Copper Flotation And Methods To Increase Gold RecoveryPlant survey data has shown that gold recovery through a specific copper concentrator was significantly lower than copper recovery. Size-by-size analysis revealed that this was due to poor recovery of
Jan 1, 2003
-
Optimization of geological lead-time in a feasibility study drill out—Two Rivers Platinum, Mpumalanga, South AfricaBy Hornsey R., P. van der Merwe
The Two Rivers Project is a feasibility study to evaluate the UG2 chromitite layer on Dwarsrivier372KT, Mpumalanga Province, South Africa. The project, which commenced in August 2001, is expected to r
Jan 1, 2003
-
Optimization of the Cycle Time to Increase Productivity at Ruashi MiningBy H. Thomas, I. N. M. Nday
"*Paper written on project work carried out in partial fulfilment of BSc.Eng (Mining Engineering) degreeThe optimization of the cycle time to increase productivity at Ruashi Mining was an on-site proj