Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME
    Optimizing An Engineered Slope Conveyor System; An OEM/Operator Collaboration

    By Todd Burchett

    Mining engineers spend countless hours and resources when designing a new underground coal mine. Their primary objective is to design the safest and most efficient operating mine with regards to coal

    Jan 1, 2013

  • SME
    Tri-Flo: A Multistage High- Sharpness DMS Process With New Applications

    By G. Machiavelli, P. Bevilacqua, G. Ferrara, T. P. Meloy

    During several years of operation in Europe, South Africa and other locations, the Tri-Flo process has demonstrated substantial improvements in dense-medium dynamic-separation systems. The reasons for

    Jan 1, 1995

  • SME
    Retrospective Study of Room and Pillar Mining at the Beehive Mine, Emery County, Utah

    By W. G. Pariseau

    A study of coal pillar strength was done at the Beehive Mine during a three year period, 1974?1977, in a cooperative effort involving the University of Utah, RE/SPEC, Inc., and the American Coal Compa

    Feb 23, 2014

  • SME
    Exploration of Beach-Placer Heavy Mineral Deposits in the San Juan Basin in New Mexico

    By A. Robison, V. T. McLemore

    "The San Juan Basin, New Mexico contains many heavy mineral beach-placer sandstone deposits of Cretaceous age. Beach-placer sandstone deposits are concentrations of heavy minerals that formed by mecha

    Jan 1, 2016

  • SME
    Increasing Mine To Market Coal Transport Productivity Through Better Particle Management At The Mine Face (0536d3ea-d307-4b3a-b7a4-2e7d1fce4a5c)

    The absence of coal face particle management practices heavily penalizes coal transportation from initial loading to final consumption. Penalties include dust problems, significantly reduced mine load

    Jan 1, 1994

  • SME
    Influence of Mineralogical Compositions on Anisotropic Burst-Prone Coal Strength

    By and Heather E. Lawson, Mark K. Larson, Gabriel Walton

    In this study, we evaluated the effects of different shapes and distribution densities of mineral grains in coal on failure mechanics using the numerical software 3DEC. The main aim of this study was

  • SME
    Debiasing For Improved Inference Of The One Point Statistic

    By Michael J. Pyrcz, Clayton V. Deutsch

    Strategic project decisions are based on the distributions global variables, for example, total mineable resource, or recoverable oil volume. These global variables distributions are very sensitive to

    Jan 1, 2002

  • SME
    Mixed Traffic Autonomy and Functional Safety - A contradiction?

    By George Biro, Christoph Mueller

    A number autonomous operations is in place in several, mainly in fenced areas, where safety is assured by locking off the entire area for other traffic. However autonomy can be brought much further if

    Jun 25, 2023

  • SME
    Strata Mechanics of Pillar Mining at the Crandall Canyon Mine (c0e13c4f-5887-4a39-a60f-1366ecdd3be0)

    By W. G. Pariseau

    "BACKGROUND The Crandall Canyon Mine (CCM) is located in the Wasatch coal field in central Utah. Extensive longwall mining at CCM preceded a decision to recover coal left in barrier pillars on each si

    Jan 1, 2015

  • SME
    The MUF Concept Applied To All Rotating Excavators

    By L. Adler

    The valuable Maximum Utilization Factor (MUF) concept has been extended to other rotating excavators beyond stripping shovels and draglines. In this concept the boom reach and bucket capacity are mult

    Jan 1, 1990

  • SME
    Toledo Waterways Initiative—Completion of an 18-Year LTCP Program - RETC2021

    By Leo Gentile, David Selhorst

    The $528 million Toledo Waterways Initiative (TWI) was implemented by the City of Toledo in 2002 and completed in August 2020. Toledo is one of many US cities required to implement a Long-Term Control

    Jun 13, 2021

  • SME
    Assessment of Sonic Waves and Tracer Gases as Non-Destructive Testing Methods to Evaluate the Condition and Integrity of In-Situ Underground Mine Seals

    By K. T. Brashear

    Since the MINER Act of 2006, the minimum static load of in-situ underground mine seals has been increased from 20-psi to either 50-psi if monitoring is conducted or 120-psi if left unmonitored. These

    Feb 23, 2014

  • SME
    Underground Mining Plants In Harmony With The Surroundings ? I. The Scope Of The Problem

    By R. L. Bullock

    The New Lead Belt of Missouri, situated in the heart of the Clark National Forest, stands as a dynamic example of how mining activities can successfully coexist in a restricted wilderness area. After

    Jan 1, 1973

  • SME
    The Risks Associated with TBM Procurement and the Next Steps toward Industry Change

    By Gary Brierley, Lok Home

    "The majority of tunnels for civil engineering applications are now being constructed using some form of mechanical excavation. Beginning in the 1960s with rock tunnel boring machines (TBM), the tunne

    Jan 9, 2018

  • SME
    The Light at the End of a 40 Year Old Tunnel - Retrofitting of an Existing Tunnel as part of The New Second Ave Subway Project, New York

    By Richard Giffen, Michael Trabold, Pablo Lemus

    "As part of the new 2nd Ave Subway Project, an existing tunnel constructed in the 1970’s will be connected to the new subway and used as new running tunnels. The existing tunnel had to be modified to

    Jan 1, 2016

  • SME
    Comparing EIA And ESHIA For Evaluating Mining Projects (dae23bc9-3905-422e-864b-fd90283ea9ed)

    By R. E. Mitchell

    The environmental impact assessment (EIA) is the accepted method for evaluating proposed mining and other industrial projects to obtain regulatory approval and to help companies plan for responsible d

    Jan 1, 2012

  • SME
    Gold Hunter Deep: From Prospect To Production

    By Glen L. Black

    Choosing a mining method for an underground orebody is a complicated and often iterative process. Advances in technology have given design teams an array of possibilities for methods and equip¬ment.

    Jan 1, 1999

  • SME
    Estimating The Effects Of Non-Darcian Flow On Inflow To A Pit And Slope Stability

    By L. C. Atkinson

    A three-dimensional finite element Ground-water flow code has been developed that incorporates saturated/unsaturated, two-regime flow (i.e., both Darcian and non-Darcian) and solves for the seepage fa

    Jan 1, 1992

  • SME
    Risk Related to PPP Tunneling Projects for Design Professionals

    By David J. Hatem

    Tunnels and underground projects are inherently more risky than vertical projects, which typically utilize more conventional design and construction approaches and are undertaken in the context of rel

  • SME
    You Can?t Mine Here

    By Edward H. Peplow

    Mr. Chairman; honored guests; ladies and gentlemen: The subject assigned me today by your committee, according to the program, is "the mineral industry and the public land law I have preferred to

    Jan 1, 1967