Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME
    Gold mineralization in porphyry copper deposits discussed

    By David J. Lowell

    The gold content of porphyry copper deposits ranges from less than 0.05 g/t to more than I g/t ((0.0017 to 0.035 oz per st) and the average is about 0.05 g/t (0.0017 oz per st) gold. Perhaps the highe

    Jan 1, 1989

  • SME
    Regulatory Changes Improve Alaska’s Mining Climate

    By Steven C. Borell

    For more than a decade, changes have occurred each year that have improved the regulatory and business climate for mining in Alaska. These changes have taken place during Republican and Democratic go

    Jan 1, 2004

  • SME
    Recent Advancements In Slurry Shield Tunneling

    By Yoshihiro Kawarabata

    INTRODUCTION With only about 30% of Japan's entire population served by sewer systems at the end of 1980, extensive sewerage construction programs have been implemented. As major sewer network

    Jan 1, 1983

  • SME
    Mining in Cuba

    By Louis W. Cope

    Since its discovery, Cuba has been called the “Pearl of the Antilles.” The country remains that, albeit a little tarnished these days. In Havana, many of the buildings are being refurbished, while s

    Jan 1, 2003

  • SME
    Deformation and Failure Characteristics and Bearing Mechanism of a Pillar Group in Stage Open Stope Mining - Mining, Metallurgy & Exploration (2023)

    By Long An, Chao Wu, Yuanhui Li, Xing Sun, Shuai Xu, Changyu Jin

    Stage open stope mining (SOSM) maintains the stability of excavation openings by leaving a large number of rib pillars. Affected by the strong unloading due to stage mining and the low width-to-height

    Mar 8, 2023

  • SME
    A Review Of Some Of The Developments In The Gold Recovery Processes Used In South Africa

    By G. J. C. Young

    In 1986 the city of Johannesburg celebrates its first century of existence. The fact that the city was founded to exploit the gold deposits which underlaid it, prompts this review of the gold process

    Jan 1, 1985

  • SME
    2000 Jackling Lecture – Minerals Resource Development – Our New Challenges

    By Hugo T. Dummett

    I would like to share some observations about the mining business and place the ongoing discussion in the context of our changed world. The mining industry practices its trade in a universe defined b

    Jan 1, 2000

  • SME
    Combining For Strength: An Integrated Approach To Water And Mine Waste

    By Nural Kuyucak

    Several thousand years ago, metallurgists discovered that by combining two relatively soft metals, copper and tin, they could make a new material, bronze, that was stronger than either metal separatel

    Jan 1, 2009

  • SME
    8 M Diameter 7 KM Long Beles Tailrace Tunnel (Ethiopia) Bored And Lined In Basaltic Formations In Less Than 12 Months

    By Antonio Raschillà

    On the 2nd of June 2007 SELI S.p.A. started the excavation of Beles Tailrace Tunnel (Ethiopia). The new 8,07 m diameter DS Universal TBM utilized for the tunnel excavation was manufactured by SELI S.p

  • SME
    Computer-Based Monitoring And Control Of A Mast-Type Roof Drill

    By M. P. Hoffman

    The U.S. Bureau of Mines is developing a roof bolter with a computer-controlled drill head that will increase the safety of roof bolting in underground coal mines by allowing miners to be relocated to

    Jan 1, 1994

  • SME
    Current State Of Disc Cutter Design And Development Directions

    By Joe Roby

    Rolling disc cutters are the business end of hard-rock and mixed-face tunnel boring machines (TBMs). Since their first successful employment on a TBM more than 50 years ago, disc cutter technology ha

    Jan 1, 2009

  • SME
    South Interceptor Tunnel Construction Using a Lovat EPBM

    By Dennis Molvik, Omar Fulton, Chris D. Breeds, Don Gonzales

    This paper presents and describes the South Interceptor Parallel Phase III Contract C93012C, which involved construction of a nominal 2.7 m (9-ft) finished diameter sewer conveyance using both pipe ja

    Jan 1, 2003

  • SME
    Cleaner Tail Recycling to Minimize Phosphate Loss

    By A. K. Fallaw, G. Wang, L. R. Moore, S. Dobson, Y. Xiong, J. Gu

    "As ores degrade, mining techniques and chemistries change to meet market demand and maintain product quality. The balance of recovery and grade is a significant challenge in the Crago Process where a

    Jan 1, 2016

  • SME
    A Novel Energy Efficient Process For Ultra-Fine Coal Grinding

    This paper presents the results of an experimental study undertaken to demonstrate the feasibility of using silica sand as a grinding media in stirred ball mills for ultra-fine coal grinding. Laborato

    Jan 1, 1991

  • SME
    Determining The Amplitude Of Certainty For Empirical Rock Failure Criteria

    By K. Oraee

    The empirical rock failure criteria play an important role in predicting the mechanical behavior of rocks, since affecting parameters on the behavioral properties of rocks are complex and numerous. Us

    Jan 1, 2012

  • SME
    What students are seeking in a degree program and in their future careers, and what that means for attracting new talent - ME Feature Article

    By Jodi Banta

    In an effort to reverse the trend of declining enrollments to mining engineering programs that began in 2015, the University of Arizona has implemented a number of interventions over the past five yea

    Nov 1, 2025

  • SME
    Ground Control Tools in Underground Coal Mining Conveniences and Precautions

    By S. Bhattacharyya

    "Coal bearing rocks are low in strength and have geological discontinuities and moisture sensitivity. Roof and rib falls have been a major cause of fatalities in underground coal mines. Mine engineers

    Jan 1, 2015

  • SME
    Requisites And Methodologies For Developing Leadership And Management Capabilities

    By L. M. Dyer

    Various attempts have been made to build leadership and management expertise with little success. There are numerous reasons these attempts have failed. Three reasons, along with suggested solutions,

    Jan 1, 2000

  • SME
    Assessing The Uncertainty Due To Grades And Grade Shell Limits For The West Leeville Underground Deposit

    By C. Deutsch

    Resource estimation for the West Leeville deposit is prepared using a conventional explicit approach. The geologic model is developed using interpretive methods based on visual logging. Grade shells

    Jan 1, 2007

  • SME
    Instability Forecasts Aid In Reducing Roof Fall Rates At The Beckley Mine

    By D. L. Ealy

    At the Beckley Mine in southern West Virginia, forecasting unstable roof conditions in advance of mining is accomplished by using a rating system that combines historical information on mine roof fail

    Jan 1, 1980