Search Documents

  • AUSIMM
    The Phased Metallurgical Upgrade Strategy at Gold Fields Limited South African Operations

    By A B. Phillips

    This paper details the approach adopted to upgrade the current metallurgical facilities at both the Driefontein and Kloof Gold Mines in the Republic of South Africa. Goldfields Ltd operates eight meta

    Jan 1, 2003

  • CIM
    Bridging the Gap Strategy to Execution

    PERSPECTIVE ?Natural resources exploration, extraction and beneficiation is complex and challenging: ?Input costs rising, complexity increasing, rising stakeholder management needs, regulatory compl

    May 1, 2013

  • CIM
    Growth through Continuous Improvement - Heap Leach Processing and Gravity Expansion at Fort Knox Gold Mine

    By James L. Oleson, Hunter R. Propsom, Kevan J. R. Ford, Robert D. Henderson, Bob Musgrove

    "Kinross’ Fort Knox Gold mine, near Fairbanks, Alaska has successfully implemented two major metallurgical continuous improvement projects resulting in growth of gold production and an extension of mi

    Jan 1, 2011

  • SME
    Macassa Number Three Shaft Deep Shaft Sinking By Conventional Methods

    By W. M. Shaver, W. R. Dengler, F. A. Edwards

    INTRODUCTION The Macassa Division of Lac Minerals Ltd. is a high grade gold mine that has been operating in Kirkland Lake, Ontario for the past 51 years. It produces approximately 120,000 tonnes of

    Jan 1, 1985

  • SME
    Techniques for Assessing and Mitigating Longwall Subsidence Effects on Highway Bridges Mining, Metallurgy and Exploration

    By Yi Luo, Jian Yang, Hua Jiang

    Surface subsidence events induced by underground longwall coal mining operations can cause various disturbances to surface structures ranging from integrity and stability to functionality problems. Hi

  • NIOSH
    RI 3539 Shrinkage Of Coke ? Introduction (0924011c-3ed3-42e0-a3e3-108355ef676c)

    By H. S. Auvil

    [The shrinkage of coke after formation is one of the variables that effects the net expansion of the change in both industrial and test ovens. Various test results5/ have been interpreted as indicatin

    Jan 1, 1940

  • SME-ICGCM
    A Hydrogeomechanical Study Of Overburden Aquifer Response To Longwall Mining

    By G. J. Hasenfus

    This paper presents the results of an extensive hydrological and geomechanical monitoring program which Gas conducted at a longwall coal mine in W. Va. The field program included monitoring of groundw

    Jan 1, 1988

  • ISEE
    Using Vibration Prediction to Reduce Blasting Costs and Complaints (c2b05a63-1c96-45ce-a036-acc1a0a37215)

    By Thomas Leonard, Philip R. Berger, Bryan E. Papillon

    Bardon Trimount Inc., a large producer of aggregate, crushed stone, and concrete, was experiencing significant public opposition to its five quarries in the Boston area. It was believed by the authors

    Jan 1, 1996

  • AUSIMM
    Discriminating hematite/magnetite via scanning electron microscope–mineral liberation analyser in the - mesh size fraction of iron ores

    By M Shaffer, D C. Grant, D J. Goudie, P Sylvester, C Voisey

    Scanning electron microscope–Mineral Liberation Analyser SEM-MLA can be used to discriminate between hematite/magnetite in iron ores, but achieving backscattered electron (BSE) segmentation between th

    Jul 24, 2017

  • AIME
    Reservoir Engineering Equipment - A New System of Tools for Better Control and Interpretation of Drill-Stem Tests

    By B. P. Nutter, M. Lebourg, J. A. McAlister

    The Multi-Flow Evaluator (MFE) is a new system of tools providing an original approach in drill-stem testing. It improves control during the testing operation and gives a more accurate evaluation of t

    Jan 1, 1966

  • SME
    Towards A General Distribution Model For Flowsheet Design – Preprint 97-165

    By M. S. Klima, P. T. Luckie

    Proper analysis of washabiity data can lead to the development of a maximum yield coal preparation plant flow sheet. Simulations, as simple as spreadsheet mass and water balancing, are important in ex

    Feb 24, 1997

  • SAIMM
    Process design of the Phola coal preparation plant - Synopsis

    By G. M. Cresswell

    The 2 360 t/h two module Phola coal preparation plant represents anew era of large plant in the Witbank coalfield designed to extend its life to 2020 and beyond. The plant uses the optimum processing

    Jan 1, 2010

  • ISEE
    A Retrospective Examination of the Evolution of Electronic Detonators

    By Campbell Robertson

    The evolution of electronic detonators in commercial mining, construction and demolition has been a transformative journey, characterized by technological innovation, enhanced safety measures and impr

    Jan 21, 2025

  • SME
    Concreting the Queens Tunnel, New York City Water Tunnel No.3

    By Edward M. Dowey

    The concrete lining for a long 8.05 km (5 mi) section of New York City Water Tunnel No. 3 was cast in place. The contractor, Grow-Perini-Skanska, placed over76,841 m3 (100,505 cy) of concrete, pouring

    Jan 1, 2001

  • CIM
    III.-Rock-Bursts at Lake Shore Mines

    By W. T. Robson

    ONE of the problems encountered in any mine is the effect of increasing pressure manifested by increasing depth. Although the depth at which excessive pressure assumes serious proportion, and the mann

    Jan 1, 1940

  • AUSIMM
    Challenges in Maximising the Value from Epithermal Gold Deposits

    By P Allen, E Gleeson, D Boakye, R Chesher, S Konopa

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. Not only do epithermal gold deposits provide many challenges in estimating mineral resource

    Mar 18, 2015

  • IIMP
    Monitoreo y control de sismicidad inducida en la U.M. El Porvenir

    By Aquiles Vivar

    Ante los problemas de sismicidad inducidos por el sistema de minado en la Compañía minera Milpo, se planteó una solución a través del sistema de monitoreo sísmico único, donde se da una distribución

    Sep 9, 2007

  • AUSIMM
    Notes on Lake Margaret Hydro-Electric Power Scheme.

    LAKE MARGARET is situate high up on the West Coast Range of Tasmania, and lies in a roughly triangular valley formed by the ridge of Mount Sedgwick on the south, the ridge formed by Mounts Geikie and

    Jan 1, 1915

  • SME
    Industrial Minerals Review 2013

    By R. L. Virta

    Four companies ? H.C. Spinks Clay Co., Inc., Imerys, Old Hickory Clay Co., and Unimin Corp. ? mined ball clay in four states in 2013. On the basis of preliminary data, production was 1 Mt (1.1 million

  • SAIMM
    Re-aligning the cutting sequence with general support work and drafting a support sequence at Simunye Shaft

    By K. Lombard

    "‘Roof support awaiting time’ (RSAT) is a term used at Goedehoop Colliery’s Simunye Shaft to describe the potential production time lost due to the continuous miner (CM) standing idle waiting for roof

    Jan 1, 2015