Search Documents

  • SAIMM
    Transportation Of A Water-Based Slurry In An Open Furrow Launder Or Stream

    By J. P. F. Charpin

    The transport of large boulders in a furrow from a mining area to a nearby pond was considered. The furrow is filled with a mixture of water and soil particles flowing down to the pond at high velocit

    Jan 1, 2007

  • SME
    Construction Control Instrumentation Used During Tunnel Enlargement

    By Raymond P. Miller, David L. Monson, Robert A. Robinson

    A geotechnical instrumentation program consisting of borehole extensometers and portable tape extensometer stations was effectively used to monitor concrete liner deformations and guide construction p

    Jan 1, 1976

  • AUSIMM
    Highlighting key features of the pore structure of iron ore sinter using mercury intrusion porosimetry and X-ray computed tomography

    By D O’Dea, B Godel, T Honeyands, G Evans, T Harvey

    The pores within iron ore sinter are important for producing a high quality material that is strong and easily reduced. The complementary methods of mercury intrusion porosimetry (MIP) and X-ray compu

    Jul 24, 2017

  • AUSIMM
    Quantity Estimation of Concentrate in Dams

    At the treatment plant of the Broken Hill South Limited, Broken Hill, the zinc concentrates, with water, are pumped out to a more or less level area, and stored in dams to dry by drainage and evaporat

    Jan 1, 1925

  • NIOSH
    RI 3544 A Study Of Timber Decay In The Crucible Mine Of The Crucible Fuel Co. ? Introduction (aed0b321-b91a-4601-a1a8-28ba35c9479e)

    By E. R. Maize

    [In report of Investigations 3452,5/ baling with roof movement in the Crucible mine, reference was made do to the fact tart timber decay was being studied at the time of writing. This roper, written a

    Jan 1, 1940

  • SME
    Probabilistic modeling of the Round Mountain gold deposit: A case study

    By Rodolfo Lagos, Nicos Pfeiffer, Ben Harding, Clayton V. Deutsch

    This paper outlines a cutting-edge probabilistic resource modeling workflow tailored to the Round Mountain epithermal gold deposit. The primary goal is to craft a robust and modern simulation process

    Dec 1, 2023

  • ISEE
    Bench Face and Quarry Fragmentation Analysis: 3D Imaging vs. Scaling References

    By Daniel Ko, Ian Bell, Shahram Tafazoli, Bahram Sameti, Aylin Azmin

    Image-based remote sensing of rock fragmentation in mining and quarry applications essentially treats each rock in the image as a data object in order to determine the rock size distribution. An obvio

    Jan 1, 2015

  • ISEE
    The Use of Computer Based Blasting Models in Mine Feasibility Analyses (d77e0f44-d5f8-4a76-8875-d772b7b19692)

    By George Boucher, Simon Williams, Neil McBride

    "The aim of these analyses was to utilise the latest available production information for the Wandoooperation to determine the optimal blasting parameters, costing’information and predicted results(fr

    Jan 1, 1998

  • AUSIMM
    Asbestiform Antigorite Occurrence in South Australia

    By P G. Self, M D. Raven, R A. Eggleton

    Investigation of an abandoned quarry near Rowland Flat in South Australia identified asbestiform antigorite as the fibrous serpentine mineral mined during the 1940s to 1978 for filler applications, no

    Jan 1, 2008

  • SME-ICGCM
    Weightings And Water Inflows During Longwall Working

    By I. W. Farmer

    Weightings and water inflows into longwall workings often occur together, giving rise to discussions on their relative genesis. Case histories are introduced which indicate that most water inflows are

    Jan 1, 1996

  • DFI
    Deep Open Excavation In Chicago Downtown Area For Red Line And Blue Line Subway Connection At Block 37

    By Gordon Chen

    The Block 37 Chicago Transit Authority (CTA) Tunnel Construction Project was originally designed by STV to connect Blue Line subway in North Dearborn Street and Red Line subway in State Street in the

    Jan 1, 2009

  • SAIMM
    Suid-Afrikaanse Raad vir Professionele Ingenieurs Beleidsverklaring no. 1/3

    1. OPLEIDING IN INGENIEURSWERK VIR IN G ENIEURS- IN -OPLEID IN G 1.1 llegistrasie as Ingenieur-in-opleiding 'n Gegradueerde ingenieur wat in 'n eksamen geslaag het wat die Raad erkenl, is re

    Jan 1, 1979

  • CIM
    Geostatistical Simulation of Optimum Mining Elevations for Nickel Laterite Deposits

    By J. A. McLennan

    Nickel laterite deposits are typically formed from tropically weathered mafic-ultramafic complexes. The resulting nickel concentration is found within soil horizons and is mineable with regular dozer

    Apr 1, 2005

  • CIM
    A 21st century advancement for mine hoisting systems: Frictionless non-powered emergency arrestors

    By E. Pribonic

    Failure of a mine material hoist can cause injuries, fatalities and significant infrastructure damage, along with an associated loss of production. Principal causes of hoist accidents are overwind and

    Jan 1, 2008

  • NIOSH
    OFR-92-78 Technical Services For Mine Communications Research - Transmit Antennas For Portable VLF To MF Wireless Mine Communications

    By Robert L. Lagace

    An investigation is made of the feasibility of developing compact transmit antennas and/or other means to efficiently couple VLF to MF band radio energy between portable wireless communication units i

    Jan 1, 1977

  • ISEE
    Seismograph Calibration - What You Should Know

    By Bob Turnbull

    The dictionary definition of calibration is: to determine by measurement or comparison with a standard, the corre c t value for each scale reading on a device.1 As a consultant or blast contractor, yo

    Jan 1, 2004

  • SAIMM
    Designing exploitation and dumping processes in brown coal mines using information technology techniques

    By R. Chryst, R. Kus

    In the Integrated IT Systems proposed by Przedsie? biorstwo Robót Geologiczno-Wiertniczych—Geological and Drilling Company (PRGW) a network connects a database with all of the departments of a mining

    Jan 1, 2003

  • SAIMM
    Design and Positive Financial Impact of Crush Pillars on Mechanized Deep-Level Mining at South Deep Gold Mine

    By B. P. Watson

    Crush pillars have been incorporated into a mechanized, low-profile trackless system at South Deep Gold Mine. These pillars had to be designed to fail near the face and to ensure that pillar failure i

    Jan 1, 2014

  • CIM
    Operating Practices at Peñoles Concentrators – Mexico

    By Rodolfo Espinosa

    "Industrias Peñoles, S.A. de C.V. in Mexico, has nine mining operations, six managed by Peñoles (base metal mines) and three managed by Fresnillo plc (precious metal mines). Seven of the operations us

    Jan 1, 2011

  • NIOSH
    RI 8928 - Large-Scale Dewatering of Phosphatic Clay Waste From Northern Florida

    By Annie G. Smelley

    The Bureau of Mines is testing a dewatering technique for phosphatic clay waste that will recover a portion of the water lost using conventional waste disposal methods and produce solids suitable for

    Jan 1, 1985