Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Rock Mass Excavatability Assessment for the Proposed Open Pit Mine at Globe-Progress, Near ReeftonThe excavatability of the rock mass in a proposed open pit mine at Globe-Progress has been assessed. The rock mass was initially evaluated by determining variations in seismic velocity and by using th
Jan 1, 1996
-
Strip Mine Reclamation Utilizing Treated Municipal WastesBy Terrence R. Lejcher
Strip mining has played a key role in the production of coal used to produce energy in this country. About 56 percent of the 1.3 x 106 hectares (3.2 x 106 acres) that had been disturbed by surface min
Jan 1, 1972
-
Regularizacion metalúrgica y del tonelaje de tratamiento en la planta de flotacion diferencial de cobre molibdeno de alumbrera- argentina. sus impactos en la produccion y los costos operativosBy Marcial Medina
El presente texto describe la reología de la Pulpa a nivel de química de superficie y así sugerir las alternativas a los problemas que impiden poder operar en forma continua y su capacidad de diseño l
Sep 12, 2011
-
OFR-115(1)-83 Development Of An Improved Man Transit Vehicle -Volume 1By Bruce Pinkston
This report presents a description of the Prototype Demonstration Vehicle developed under U.S. Bureau of Mines Contract No. JO 366003, "Improving Man Transit Safety". This vehicle was constructed
Jan 1, 1981
-
Andco-Torrax: A Slagging Pyrolysis Solid Waste Conversion SystemBy P. E. Davidson
The management of solid waste is known to be a large and increasing problem in high-population areas throughout the world. It is not necessary here to add further definition to the nature and magnitud
Jan 1, 1977
-
Application Of Seismic Tomography In Underground MiningBy D. F. Scott
Seismic tomography, as used in mining, is based on the principle that highly stressed rock will demonstrate relatively higher P-wave velocities than rock under less stress. A decrease or increase in s
Jan 1, 1996
-
IC 6244 Practical Application and Cost of Proper Rock DustingBy G. M. Kintz
"Methods and costs of rock-dusting bituminous coal mines have been discussed in various publications by the United States Bureau of Mines and others.3 This paper discusses the present methods and cost
Mar 1, 1930
-
OFR-49-75 Seismic Mine Monitor System - Phase IV ReportBy J. C. Fowler
The field testing of the Seismic Mine Monitor System is described. This system consists of nine geophones buried about 40 feet deep over a ten-square-mile area, the amplifiers and electronics needed t
Jan 1, 1974
-
OFR-122(4)-80 Alumina Process Feasibility Study And Preliminary Plot Plant Design - Task 3 Report: Preliminary Design Of 25 Ton Per Day Pilot Plant - Volume IV - Appendix B - General Specification - Section 1 - Building Description1.0 Control House (DWG. NO. 56-401-G) - 1.1 Physical Description The Control House is a single story, 2728 square foot building with an adjacent transformer yard. A four foot overhang provides shad
Jan 1, 1979
-
The Effect Of Graphite Properties On The Rate Of MnO Reduction From High Carbon Ferromanganese SlagBy G. Tranell, L. Kolbeinsen, S. Gaal, J. Safarian
The effect of carbon material properties on the rate of MnO reduction from ferromanganese slag by solid graphite was investigated. A sessile drop technique was used to study the reduction rate of a sy
Jan 1, 2007
-
Detonation Line Standards and Specifications-Someday?By James A. McGrath
"The predominant key word associated with all commercial blasting methods is “safety”. Safetyshould take precedent over all other aspects of the entire explosives industry which on a wholehas had an e
Jan 1, 1999
-
Recuperação De Cobre Através De Sucata EletrônicaBy Loyslene Rabelo Fernandes
Esse trabalho experimental apresenta os resultados preliminares da lixiviação de placas de circuito eletrônico de microcomputadores sucatados visando a extração de cobre, além da recuperação daquelas
Oct 30, 2017
-
IC 8320 Urbanization And Its Impact On The Mineral Aggregate Industry In The Denver, Colo., AreaBy Matthew J. Sheridan
The Bureau of Mines study described in this report was conducted in the Denver, Colo., area (1) to summarize existing conservation practices as related to the most beneficial utilization of deposits o
Jan 1, 1967
-
OFR-175-83 Fire Hazard Criteria For Noise Control Products In Underground Coal MinesBy Mark R. Pettitt
The development of fire hazard criteria for noise control products in underground coal mines are presented. Qualifying requisites of the criteria include maintaining miners' safety, allowing for
Jan 1, 1983
-
Positive Cut-Off Wall in Indian Dam – A New Technique for Difficult GeologyBy Steni Stefani, Sanjay Dave
"This paper describes an innovative method, used for the first time in India, for the construction of a 1.0metre-thick positive plastic concrete cut-off wall (CoW) at the upstream toe of the dam at th
Jan 1, 2017
-
A New and Cost-Effective Process for the Production of Mid- And High-MN Advanced High Strength Steel (AHSS)By S. Mostaghel, V. Hernandez, S. Ge
"The automotive industry is under a constant pressure to reduce the weight of vehicles in order to reduce emissions and improve fuel efficiency. As such, there is an ever-growing demand for high stren
Jan 1, 2016
-
Multi method approach to heavy mineral exploration: Miocene of DenmarkBy T. Rasmussen, T. G. Jørgensen, T. Fischer, R. K. McLimans, C. Knudsen, D. Frei
Ilmenite-bearing paleo-beach deposits were discovered in Jylland, Denmark using a combination of Ground Penetrating Radar (GPR), portable X-ray fluorescence (XMET), bulk XRF analyses, Computer Control
Jan 1, 2005
-
Endurecimento Do Aço Aisi 1140 Por TêmperaBy Géssica Padilha de Souza
Nos dias atuais, tem-se uma busca incessante por materiais que atendam às solicitações de trabalho exigidas, mas que possuam um baixo custo de fabricação. Diante disso, esse trabalho tem por objetivo
Aug 16, 2017
-
Apportioning Risks On An Urban Deep Foundation ProjectBy Michael P. Balducci
Urban deep foundation projects contain unique risks that must be recognized by the parties involved. Common pitfalls must be recognized and avoided or addressed through contractual relations and corr
Jan 1, 2008
-
Influência Dos Parametros Aplicados Na Manufatura Aditiva Para Produção De Uma Liga De Niti Via Fusão Seletiva A LaserBy Patrícia Freitas Rodrigues, Talita Gama de Sousa, Paulo Inforçatti Netto, Danilo Abílio Correa Gonçalves, Rebeca Vieira de Oliveira, Eduardo Hoisler Sallet, Jorge Vicente Lopes da Silva, Naiara Vieira Le Sénéchal, Rodolfo da Silva Teixeira, Andersan dos Santos Paula
O processo de fusão seletiva a laser (FSL) é comumente utilizado na manufatura aditiva de materiais metálicos, sendo este um processo rápido no qual as peças são formadas camada por camada. Neste proc
Nov 15, 2019