Potential Metallurgical Treatment Of Copper Concentrates With High Arsenic Contents - SynopsisBy I. Mihajlovic
This paper investigates a potential method for arsenic removal from copper concentrates using hypochlorite leaching. The problems concerning pyrometallurgical processing of copper concentrates with hi
Jan 1, 2011
-
Baseline Ground Settlement and Groundwater Monitoring for Tunnelling – A Case Study in MelbourneBy I Lamb
Past experience of ground settlement and groundwater monitoring for tunnelling projects in Melbourne has provided an appreciation of the value and importance to owners of establishing a broad baseline
Mar 8, 2011
-
Geomechanical Studies for Optimal Design of Post Pillars and Crown Pillar for Cut and Fill Mining in 124 OB at Birchtree MineBy D Reddy Chinnasane
Outline Location of BirchtreeMine and Layout of 124 OB Cut and Fill Mining Background Purpose of the Studies Methodology Results and Analysis Conclusions and Recommendations
Oct 1, 2010
-
The Evalaution and Development of the Barrytown Ilmenite Deposit as a Source of Titanium Dioxide PigmentBy D James
Fletcher Challenge Limited through its subsidiary Grampian Mining Co Limited has carried out an ore evaluation of one of New Zealand's largest known deposits of ilmenite located at Barrytown on t
Jan 1, 1986
-
Where New Zealand Fits InternationallyNew Zealand depends on foreign investment for economic development. This also applies to the development of New Zealand's mineral resources. For this foreign investment to happen there must be so
Jan 1, 2000
-
A Comparative Study of Manual Wagon Top Sampling and Auto Mechanical Sampling of 200 mm Size Coal with Respect to Stopped Belt Sampling of Thermal Coal at Indian Super Thermal PowerplantsBy K M. P Singh, K M. K Sinha, G S. Jha, T Gouricharan, K K. Sharma
The majority of the powerplants in India are fed with non-coking coals, with the coals dispatched from their respective mines via wagons loaded by a rapid loading system or pay loader. The usual top s
Jul 29, 2014
-
Method for incorporation of shape characterization into cone crusher modelBy A. C. Apling, N. B. Barrett
Roadstone production requires the generation of non-flaky material, as outlined in British Standard 812 section 105.1; with respect to this criterion, a mathematical model of a cone crusher must be ab
Apr 1, 1995
-
Technology News - No. 518 - Super Stopping: A Permanent Solid Stopping for Directing Ventilation Airflows in Large-opening Metal/Nonmetal MinesObjective: To identify and evaluate a permanent stopping to direct ventilation airflows in large-opening metal/nonmetal mines.
May 1, 2006
-
Response to Load for Four Different Types of Bored PilesBy Mario Terceros H., Bengt H. Fellenius
"ABSTRACTFour strain-gage instrumented bored piles were constructed in a sedimentary, dense to very dense, fine to medium sand in Santa Cruz, Bolivia. Two of the test piles were the normally used bore
Jan 1, 2014
-
Kainantu Gold-copper System, Papua New GuineaBy K Prendergast, P Dale, I Taylor, A J. Vigar, B Lueck
"An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. The Kainantu Project is located within the New Guinea Thrust Belt in northern Papua New Gui
Mar 18, 2015
-
The Cigar Lake project — Mining, ore handling and millingBy 12670
The Cigar Lake project will develop the world’s second largest high-grade uranium deposit. The Cigar Lake Phase 1 orebody contains approximately 226 million pounds U3O8 at an average grade of 20.7% U3
Jan 1, 2004
-
St. Louis Skinker–McCausland TunnelBy Jozef F. Zurawski
River Des Peres Foul water Interceptor (Skinker–McCausland Tunnel) is a gravity sewer tunnel constructed to eliminate dry sewage overflows during high river stages and to improve the wastewater collec
Jan 1, 2001
-
Library (6e0f285f-f604-4626-8c51-55e3edd83306)THE IRON HUNTER. By Chase S. Osborn, pp. 316, Ills. 10. The MacMillan Company, New York. 1919. An autobiography, the story of a Hoosier boy who fought his way to manhood and power through early misfo
Jan 11, 1919
-
OFR-120-80 The Effect Of In Situ Retorting On Oil Shale PillarsBy L. Ozdemir
An investigation was made to determine the mechanical properties of oil shale at elevated temperatures and confining pressures, the thermal properties at elevated temperatures, and to provide mathemat
Jan 1, 1981
-
Production Blasting with Electronic Delay Detonators at Peak QuarryBy H G. Bosmare, G Bedser, C V. B Cunningham
Peak Quany has achieved substantial improvements to its bottom lie by giving close attention to blasting practice, and in pr@icnlar by introducing electronic delay detonators for routine production bl
Jan 1, 1998
-
The Estimation Of Platinum Flotation Grade From Froth Image Features By Using Artificial Neural Networks - SynopsisBy C. Marais
The use of machine vision in the monitoring and control of metallurgical plants has become a very attractive option in the last decade, especially since computing power has increased drastically in th
Jan 1, 2011
-
Pittsburgh Steelers Stadium - Deep Foundations Case StudyBy Larry Rayburn
In the spring of 1999, construction commenced on the new Steelers Football Stadium in downtown Pittsburgh, Pennsylvania. Richard Goettle, Inc. (RGI) was the successful bidder to install the specified
Jan 1, 2001
-
OFR-19(1)-74 A Study Of Underground Mine Heat Sources - Phase I, Survey Of Underground Mine Heat SourcesBy James L. Fenton
In its unending search for the raw materials that the affluent society of today requires the mining industry has found it necessary to go to great depths, in many cases, to produce these materials. In
Jan 1, 1973
-
Supply-And-Demand Geoeconomic Analysis Of Mineral Resources Of Rare Earth Elements In The United StatesBy A. Nieto
Rare earth elements (REEs) are crucial to green technology such as hybrid-electric vehicles, wind turbines and fluorescent light bulbs. As of 2011, China dominates the global production of REEs and is
Jan 1, 2012
-
OFR-48-75 The Demand For And Supply Of Manpower For The Lead And Zinc Industry In Years 1985 And 2000 ? SummaryBy Carl R. Christiansen
The primary objectives of this project are (1) the determination of manpower demand in primary lead and zinc production for the years 1985 and 2000, and (2) the estimation of the availability of the r
Jan 1, 1975