Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Environmental Monitoring in Polish Coal Mines

    Polish coal mines are well equipped with methane monitoring systems,nevertheless the worsening conditions force a continuous impro- vement in the field of environmental monitoring. Application of m

    Jan 1, 1988

  • AUSIMM
    The Composition of the Peko Copper Orebody, Tennant Creek

    The Peko copper orebody is associated with a body of magnetite rock which it has partly replaced. The primary ore averages about 9 per cent. copper and 4 dwt. gold per ton and locally IS much richer.

    Jan 1, 1955

  • AUSIMM
    Controls on the Hydrology of Large Volcanically Hosted Geothermal Systems : Implication for Exploration for Epithermal Mineral Deposits

    By Lawless JV

    Recent exploration for gold on the Pacific Rim has utilised similarities between active hydrothermal systems and epithermal gold deposits. The major control over formation of such deposits is the

    Jan 1, 1987

  • AUSIMM
    Managing the Margin at Norseman, Western Australia – A Case Study

    By B P. Micke

    Central Norseman Gold Corporation was established in 1935 and has been mining on the Norseman field in Western Australia since then. It is Australia’s longest continuously operating gold mining operat

    Mar 24, 2014

  • AUSIMM
    A Simple Method of Measuring Rock Fracture Toughness using the Brazilian Test Method

    By Aziz NI

    There are a number of methods available for the determination of the fracture toughness of rock. Some of the most recognised methods include the hollow pressured cylinder, the short-rod, the chev

    Jan 1, 1992

  • AUSIMM
    Characterising Cobalt Losses for Improved Recoveries

    By I Lumsdaine

    QNI Pty Ltd operates the Yabulu Refinery located 25 kilometres north of Townsville, North Queensland. The plant treats nickel laterite ores sourced from the Philippines, Indonesia and New Caledonia. T

    Jan 1, 2002

  • AUSIMM
    Unmanned Aerial Robots for Remotely Operated and Autonomous Surveying in Inaccessible Underground Mine Voids

    By A Grace, C Sennersten, T Taylor, A Davie, R Lyu, D Pentecost, C A. Lindley, J Craig, L De Macedo Camargo

    Many underground mine void spaces are not suitable for human entry due to unprotected roofs, instability or having an unknown safety state (eg if they are many decades old). Investigations of these vo

    Nov 4, 2015

  • AUSIMM
    Upgrading of Indonesia's Bauxite by Washing Method

    Upgrading of Indonesia's Bauxite by Washing Method There were eight bauxite samples used in this research, three samples from Kijang contain total SiO2 18.36 - 29.16 per cent, Al2O3 40

    Sep 13, 2010

  • AUSIMM
    Flotation as an Operation of Macromolecular Mass Transfer

    By M R. Drumond

    The present work presents a new theoretical interpretation of the flotation process, which can also be applied to other mineral processing physical unit operations. This interpretation is part of the

    Jan 1, 2005

  • AUSIMM
    Developments in Gas Handling and Associated Environment Activities at Smelting Plants of Mount Isa Mines Limited

    By Whitworth N, Anderson P

    New plant has been commissioned to treat off-gases from the Fluo-solids Reactor in the Copper Smelter. The new section of plant was built onto an operating system and commissioned with minimum disr

    Jan 1, 1978

  • AUSIMM
    Geomechanical modelling of the Ernest Henry iron oxide copper gold deposit – identifying fluid pathways to predict potential mineralised zones

    By J G. McLellan, B Miller

    Copper and Gold mineralisation at the Ernest Henry deposit is bound by two controlling shears along the hanging wall and footwall margins. The shear zone geometries have been influenced by a large dio

    Sep 20, 2017

  • AUSIMM
    Concentrating Practice of the Broken Hill South Limited, Broken Hill, New South Wales, Australia

    By Read T. A

    THE Broken Hill South Ltd. is one of ten companies operating on the Broken Hill lode (See Fig. 1). It has two leases-Blocks 7 and 8-of a total length of 2250 ft. on strike of lode.From the surface to

    Jan 1, 1921

  • AUSIMM
    Fundamental Study on Granulation of Sinter Raw Material Mixture

    By Sato S, Kawaguchi T

    The granulation and bed-permeability of sinter raw materials depend on interactions between the properties of various iron ores and water. The properties of individual iron ores are controlled by

    Jan 1, 1980

  • AUSIMM
    Non-Ideal Explosive Performance Prediction Using the CPEX Model

    By Minchinton A

    CPeX is a non-ideal explosive performance prediction model. The model takes into account the rate of energy release, the extent of chemical reac- tion and the effect of confinement on energy release.

    Jan 1, 1988

  • AUSIMM
    Practice and Prospects for Methane Predrainage to Prevent Outbursts in Coal Mines In the Congqing Area

    Most coal mines in Chongqing Area are highly gassy mines and liable to outburst of coal cnd methane. In order to harness mine environment and raise the Prodction capacity, methane predrainage is gener

    Jan 1, 1991

  • AUSIMM
    Measurement of Payloads Carried by Mine Haul Trucks and the Influence of Payloads on Production Rates and Material Movement Costs

    By Alexander RB, Hollis AJ

    The magnitude of the payloads carried by mine haul trucks can have a strong influence on the mine production rates and costs. Consequently control of truck payloads is highly desirable, but in man

    Jan 1, 1986

  • AUSIMM
    Rock Excavation by Machine - A Comparative Study of Picks and Discs

    One of the responsibilities of the Melbourne and Metropolitan Board of Works is to provide a sewerage system for the metropolis of Melbourne which now contains over 2.5 million people. In providing

    Jan 1, 1976

  • AUSIMM
    Sampling Systems for Process Control and Metallurgical Accounting

    By F F. Pitard

    The optimisation of a metallurgical plant requires two kinds of sampling systems. The first provides samples to follow process changes, so in due time actions to maintain key parameters within pre-est

    Jul 29, 2014

  • AUSIMM
    Delay Variability: Effect and Design to Minimise these Effects

    The statistical nature of the variability in detonation times of pyrotechnic delays is discussed, and how to evaluate the probability of required detonation intervals is shown. Some methods (analytica

    Jan 1, 1992

  • AUSIMM
    Optimising Cut-Offs Over Time

    By Wharton C. L

    This paper describes a new computer program which can significantly increase the Net Present Value of either an open cut or underground mine by optimising the cut-offs used during the operating lif

    Jan 1, 1995