Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Optimising Coal Dust Suppression Factors in a Laboratory Using a Three-Level Factorial Approach

    By Tien J. C

    Many factors (type of coal mined, water pump pressure, wetting agent concentration, etc) will affect the performance of a dust suppression system using a water spray in an underground coal mine. Whi

    Jan 1, 1994

  • AUSIMM
    A Bounding Surface Model for Sand Subjected to Blast-induced Vibrations

    By L M. Zhang, T H. Xu, J Zhao

    Blasting is one of the most commonly used strategies for excavation in civil and mining engineering. Yet blasting can also bring along such undesirable effects as ground vibrations and soil disturbanc

    Nov 5, 2014

  • AUSIMM
    Dynamic Modelling of Dense Medium Cyclone Washing Circuits

    By Wood CJ, Davis JJ, Askew H

    A dynamic model of a dense medium circuit has been developed and tested against plant data. The model shows the response of the circuit to both controlled (changes in specific gravity set point or

    Jan 1, 1978

  • AUSIMM
    Recent International Trends in Continuous Galvanising

    The paper will review the marked upsurge in the installation of new continuous metal coating lines, both hot dip and electrodeposition. Although some of this new capacity has been replacement for ob

    Jan 1, 1993

  • AUSIMM
    Engineering Disciplines and Professional Negligence - An Insurer Perspective

    By Greg Brown

    The underwriting of professional negligence has proved to be an evolving science. As with most insurance products coverage offered in the past was very broad but as legal precedent demonstrated to

    Jan 1, 1995

  • AUSIMM
    The Effects of A Change from Parallel to Series Grinding at Broken Hill South

    By Weller KR, Restarick CJ, Stewart PSB

    Following a detailed assessment of concen trator performance at Broken Hill South Limited which was reported in a previous paper, the fine grinding section was changed from a parallel arrangement o

    Jan 1, 1972

  • AUSIMM
    The Geology and Gold Mineralisation of the Batman Deposit, Mt Todd Project, NT

    By Hein K. A A

    The Mt Todd Gold Project is located 42 km northwest of the township of Katherine within the Northern Territory of Australia. It is situated in the southeastern portion of the Pine Creek Geosyncline.

    Jan 1, 1994

  • AUSIMM
    The Strength of Backfills Stabilised with Calcined Gypsum (c8b2fb36-9e9c-4e1a-916e-c8ad62e78d93)

    By Pigdon SP, Anderson RM

    The production of stabilised backfill at mine sites commonly uses Portland cement as the binder. Calcined gypsum has cementing properties and is cheaper to produce than cement. This paper discusses

    Jan 1, 1998

  • AUSIMM
    Eco-Development and Mining in the 21st Century Near Delhi, India

    By Verma UK

    Mining for sand was active in South Delhi during the last four decades disregarding all norms of safety. The aim of the paper is to highlight what is proposed to be done for mining in Delhi. Apar

    Jan 1, 1986

  • AUSIMM
    Simulation of the Mineralogical and Chemical Aspects of Heap and Dump Leaching as an Aid to Ore-Process Evaluation

    By Box JC

    A comprehensive computer simulation has been developed for heap and dump leaching processes. It deals with complex chemical interactions, involving several minerals and reagents, which vary with t

    Jan 1, 1983

  • AUSIMM
    Sulfide Dust Explosions in Metalliferous Mines

    Changes in mining technology have led to an increase in the number of underground sulfide dust explosions reported in Australian and overseas mines. Samples collected at the Elura mine consisting prim

    Jan 1, 1984

  • AUSIMM
    Applied Coal Geology with Particular Reference to Coking Coals

    Coal geology plays an essential role in the investigation of in situ coal seam quality. Coal geology can also play an important part in laboratory studies such as coal washing and coking, and in op

    Jan 1, 1976

  • AUSIMM
    The Use of Seasonal Adjustment and the ôPinch-Pointö Diagram in Forecasting Prices of Base Metals

    By Maiman R

    One method of forecasting prices of metals is based on analysis of historic relationships between prices, inventories and consumption. The first, but generally overlooked step in this analysis should

    Jan 1, 1990

  • AUSIMM
    Geopolymer Concrete for a Sustainable Future

    By S E. Wallah, D Hardjito, B V. Ran

    The manufacture of Ordinary Portland Cement (OPC) is not only energy-intensive but also releases a significant volume of carbon dioxide (CO2) to the atmosphere. In addition, OPC in concrete often caus

    Jan 1, 2004

  • AUSIMM
    Optimisation of Coal Production from Mine Face to Customer

    The technology of coal preparation, while based on similar processes to those in common useage in the 1950s, has improved significantly over the past 15 years primarily due to advances in process cont

    Jan 1, 1992

  • AUSIMM
    Bauxite Mining with a Mobile Crusher and Overland Conveyors at Pinjarra, Western Australia

    Alcoa of Australia's Del Park mining op eration is centred 9 km. east of the Pinjarra alumina refinery, and is centrally locatedwith- in the 10, 000 sq. km. lease which the Company holds for ba

    Jan 1, 1973

  • AUSIMM
    A New Approach for Reverse Flotation of Magnesite From Dolomite

    By G Chen

    Magnesite and dolomite are two salt-type minerals. The surface characteristics of these two minerals are almost the same. It is very difficult to remove dolomite from magnesite ores by flotation proce

    Jan 1, 2005

  • AUSIMM
    The Potential for Backfill in Highwall Mining (7bcc6ff0-6f9e-4f39-8e8f-1dbb9d479afe)

    By Boyd GL

    Backfill applied to highwall mining is foreseen as a means to increase recovery of mineable coal to levels comparable with underground longwall mining. This paper describes the progress of research

    Jan 1, 1998

  • AUSIMM
    Copper Concentrator Practice at Mount Isa Mines Limited, Mount Isa, Qld

    By Hare S. M, Griffin P. T, O&apos

    Chalcopyrite ore and converter slag treatment to produce copper concentrates is undertaken at the Copper Concentrator of Mount Isa Mines Limited. This concentrator was commissioned in May 1973, replac

    Jan 1, 1993

  • AUSIMM
    Recruiting for an Underground Workforce at Cannington

    By A G. L Pratt, M S. Kemp

    BHP has used many innovative techniques when recruiting its workforce for the Cannington Project. Looking for a balance of experience and enthusiasm it was necessary to develop pre-selection tests to

    Jan 1, 1998