Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Improved sustainability through WHIMS Plant addition at Roy Hill

    By C Jenkins, J Jasper, Y Suryaputradinata, S Lozyk, M J. Hartmann

    The primary objective of mining companies is to function as a profitable business by delivering products that fit customer requirements in a safe and sustainable manner. Optimum resource utilisation i

    Nov 8, 2021

  • AUSIMM
    Improving tungsten recovery through the reuse of mine wastewater

    By Z Gao, D Liao, W Sun, S G. Pooley, J Wang, Z Shi, G Jing, S Ren, Q Chen

    Yuanjing processing plant is a scheelite and wolframite plant in southern China. Water shortages and recent environmental regulations mean that the plant must reuse the wastewater that comes from the

    Aug 24, 2022

  • AUSIMM
    Mathematical Modelling and On-Line Control of Hydrocyclones

    By Eren H

    For a hydrocyclone of fIXed geometry, DC, Di, DO and ? are constants, the variable parameters affecting the performance are Qi, Fi, Du and H. (See Appendix 2 for definition of symbols).The relationshi

    Jan 1, 1990

  • AUSIMM
    Fundamental study for biomass char utilisation at sintering process in view of combustion property

    By T Takayama, R Muroi, M Matsumura

    The steel industry occupies 14 per cent of CO2 emissions in Japan, and the sintering process is one of the major emitters. Since most of CO2 released from the sintering process comes from coke fine co

    Nov 8, 2021

  • AUSIMM
    Metallurgical Performance of Outotec’s e500 TankCell® at the Kevitsa Cu-Ni-PGE Concentrator

    By B Murphy, T Mattsson, R Crosbie, T Maksimainen

    "An Outotec e500 TankCell, with 500 m³ of actual flotation volume, was commissioned at the Kevitsa Cu-Ni-PGE concentrator in northern Finland during 2014. This flotation cell was implemented at t

    Oct 10, 2016

  • AUSIMM
    Optimising the Telfer Pyrite Regrind Circuit – Effect of Dissolved Oxygen Demand

    By D R. Seaman, B Adamson, P Sharman, M McMahon

    "The Telfer processing plant commissioned its pyrite regrind and flotation circuit in August 2012. The circuit was designed to regrind pyrite concentrate to a p80 of <30µm then float a gold

    Oct 10, 2016

  • AUSIMM
    The Implementation of Snowden's Reconciliation Software - A Case Study from Telfer

    By J Gotte, C Morley, J Froud

    Newcrest Mining LimitedÆs Telfer Mine is a world-class gold and copper producer, situated in the Great Sandy Desert, in the north west of Western Australia. The mine has a number of distinctive charac

    Jan 1, 2007

  • AUSIMM
    Advancing sustainability in pumping systems – a comprehensive methodology for calculating, monitoring and minimising power and water consumption

    By A Karrech, G M. Hassan, A Varghese, E Lessing, S Martins

    Pumps play a critical role in mining operations, and their energy consumption and environmental impact are significant. This paper addresses the need for a holistic approach to sustainable pump deploy

    Sep 1, 2024

  • AUSIMM
    Managing continuous improvement of Mine to Mill begins with measurement

    By J Loeb, R Ramanathan, H Ingham, P Cameron

    Most mining operations, including iron ore, maintain a focus on continuous improvement and asset optimisation in their operations. As all the unit operations in the Mine-to-Mill value chain are interd

    Nov 8, 2021

  • AUSIMM
    Analysing reduced conveying capability of the orepass systems in Malmberget mine

    By T Wettainen, G Shekhar, M Stromsten, B Skawina

    The aim of a transportation system in an underground mine is to move the rock masses from one location to another in the most preferable manner by minimising the long and short-term operational costs.

    Mar 15, 2021

  • AUSIMM
    Analyses of pressure drop in high temperature zone during iron ore sintering

    By S Mitra, T Singh, D O’Dea, T Honeyands

    Permeability and air flow rate in the bed during iron ore sintering is crucial to controlling the sinter quality and productivity of a sinter plant due to its influence on the flame front speed. In th

    Nov 8, 2021

  • AUSIMM
    A Stochastic Optimisation Formulation for the Transition from Open Pit to Underground Mining within the Context of a Mining Complex

    By J MacNeil, R Dimitrakopoulos

    As open pit mining of a deposit deepens, the cost of extraction may increase up to a threshold where transitioning to mining through underground methods is more profitable. This paper provides an appr

    Nov 24, 2014

  • AUSIMM
    The Effect of Aground-Underground Seamlessly Integrated Modelling in Mine Disaster Prevention

    By Y S. Zhang

    Natural phenomena and human engineering construction activities had great influence on the geosciences space. Natural disasters, particularly mine disaster and other geological disasters happened freq

    Nov 22, 2011

  • AUSIMM
    Process Design Aspects at Bendigo Mining's Gold Operations

    By T E. Hayward, D H. English, S J. Smith

    Gold mineralisation at Bendigo is exclusively associated with quartz reefs, commonly found within or near anticlinal fold hinges. The gold is typically coarse grained (0.5 mm to 5 mm), free milling an

    Jan 1, 2007

  • AUSIMM
    A Method of Assessing the Efficiency of Powered Supports in Service

    By Bigdy D. N

    The paper describes a system for providing mine management with a continuous indication of the effectivness of longwall coalface powered supports in controlling roof-to-floor convergence. The syst

    Jan 1, 1988

  • AUSIMM
    Fatigue risk in your operations – real or rubbish? It actually depends

    By T Dawson, B Haskins

    Fatigue is it the newest buzz word or is fatigue a real phenomenon that is creating safety and organisational risk for you? There is no debate that fatigue is natural, and it affects us all, just lik

    Oct 16, 2017

  • AUSIMM
    Environmental Variables at Bauxite Mine

    By A Romanel, M S. Kato, M P. Piermatei, P Artioli

    "Brazil is the sixth worldwide producer of aluminum and Votorantim (Metals) has been operating three bauxite open pit mines in a particular way of working. In those the deposits occur on the top of hi

    Jul 10, 2012

  • AUSIMM
    Underground Mine Fire Prevention at the South Mine, Broken Hill

    SINCE 1900, five underground fires of consequence have beenrecorded in the Broken Hill mines. These occurred at the Junction(1906), Proprietary (1906 and 1916), Block 14 (1906), and Centralmines (1923

    Jan 1, 1929

  • AUSIMM
    Transient slag behaviour in the Direct Reduced Iron (DRI) and scrapbased Electric Arc Furnace (EAF) process – case study for high and low-grade DRI input

    By S K. Panda, M A. Van Ende, S Chatterjee

    Tata Steel Netherlands (TSN) aims to reduce its CO2 emissions by 35–40 per cent by 2030 and become CO2 neutral by 2045. A first step to reach these targets is via the utilisation of an Electric Arc Fu

    Jun 19, 2024

  • AUSIMM
    Arsenic Depression in the Flotation of Broken Hill Lead Concentrates

    By Quast K

    A series of laboratory flotation tests were conducted to evaluate the effectiveness of various depressants as arsenic (and zinc) depressants in the lead cleaner stage of the NBHC mill at Broken Hill

    Jan 1, 1991