Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Rethinking variogram modelling

    By A Boucher, M Baudin, P Androszczuk, I Minniakhmetov, A Rigby, P Machado, M Wright, B Van Dijken

    IGO Ltd’s (IGO’s) Nova Operation (Nova), which is 160 km east-north-east of the town of Norseman in Western Australia (WA), mines and processes nickel-copper-cobalt (Ni-Cu-Co) sulfide ore from the mag

    Mar 22, 2022

  • AUSIMM
    Increased productivity using theory of constraints at the Argyle Diamond Mine

    By B Murphy, N Strong, J Albrecht

    Rio Tinto’s Argyle Diamond Mine has a history of underperformance with delivery of ore from the underground operation to the surface for processing with no real clarity in sources of loss and value. I

    Mar 15, 2021

  • AUSIMM
    Expansion of the Mount Isa Mines Copper Concentrator Phase One Cleaner Circuit Expansion

    By G Harbort, V Lawson

    Mount Isa Mines Limited operates one of the worldÆs largest underground mines in North West Queensland. ItÆs mining and smelting complex produces copper anode, crude lead bullion (containing silver),

    Jan 1, 2003

  • AUSIMM
    Evaluation of Underground Mining Options at Xstrata Copper's Ernest Henry Copper-Gold Mine

    By P Christen, D R. Ashley, G R. Power

    The Ernest Henry Mine is currently a copper-gold open pit operation situated in north-west Queensland, Australia. It is owned and operated by Xstrata Copper with a current throughput of 11 million ton

    Jan 1, 2009

  • AUSIMM
    The Influence of Pyrite on Galena Oxidation and Subsequent Flotation

    Folklore suggests that oxidation is detrimental to sulfide mineral flotation, and in many instances is the reason given for values reporting in the tailing. However, while a considerable body of work

    Jan 1, 2005

  • AUSIMM
    Application of Lateral Crater Test in Open Pit Blasting Parameters Optimisation

    By Y M. Wang, W Z. Liu, L F. Li, X L. Zhang

    Based on the blasting crater theory, the equation between k under typical cases and burden line, charge height was obtained by open pit bench blasting analysis model. The model was calculated with min

    Aug 24, 2015

  • AUSIMM
    The Use of High Pressure Grinding Rolls for Crushing Magnetite

    The paper describes data from test work programs on a range of magnetite ores in Australia and overseas. The analysis looks at the behaviour of material of different sizes fed to the rolls and the cha

    Jan 1, 2009

  • AUSIMM
    Schrödinger’s kittens – lifting the lid on resource drill hole data after mining

    By D Corley, J Moore, M Grant, A, W R

    Resource estimates are the corner stone of technical and investment decision-making. Prior to mining, resource estimation uncertainty has the greatest potential to lead to poor investment decisions, d

    May 24, 2023

  • AUSIMM
    Optimum embankment design for a tailings dam

    By A Fyans, B Ghahreman-Nejad

    This paper discusses the method and results of an options study into selection of the optimal form for a 130 m high tailings/water retaining dam, located in a region of high seismicity in central Iran

    Jul 23, 2018

  • AUSIMM
    Ore Block Design in Narrow Vein Gold Deposits – Estimate or Simulate?

    By G D. Matthews, M E. Haylett, S Khosrowshahi, A Weeks

    In narrow orebodies the use of ordinary kriging (OK) may pose certain limitations when used for grade control modelling. The smoothing effect of kriging, by its very nature, cannot retain or accuratel

    Aug 18, 2014

  • AUSIMM
    Strain-dependent Stiffness of the Weathered Melbourne Formation

    By Z Terzic, M Schult, D Chu, S Macklin

    The East West Link road tunnels are proposed to provide a connection between the CityLink toll road and the Eastern Freeway north of the Melbourne CBD. The alignment passes from Moonee Ponds valley be

    Sep 17, 2014

  • AUSIMM
    Design of Copper-Cobalt Hydrometallurgical Circuits

    Copper-Cobalt hydrometallurgy has seen a resurgence in recent years with the development of projects in Zambia and the DRC. Many of the flow sheets are unique in their use of hydrometallurgical techni

    Jan 1, 2008

  • AUSIMM
    Iron Ore Mine Reconciliation ù A Case Study From Sishen Iron Ore Mine, South Africa

    By R Moller

    Reconciliation at large iron ore operations is a complex and time- consuming process. Often the volume of data and the large range of different stakeholders makes the process almost impossible. Up unt

    Jan 1, 2005

  • AUSIMM
    The Impact of Fluidised-bed Flotation for Treating Coarse Sulfides

    By H Thanasekaran, M J. Mankosa, J N. Kohmuench, G H. Luttrell

    "Fluidised-bed flotation has been demonstrated over the last 16 years as an effective method for improving the flotation recovery of coarse particles. This technology has been successfully deployed in

    Oct 10, 2016

  • AUSIMM
    Pulp rheology of fine mineral flotation – a review

    By A Liu, X Wang, W Peng, Q Zhang

    Pulp rheology plays a critical role in fine mineral flotation. Yield stress and apparent viscosity are two important rheological parameters affecting mineral flotation recovery. In this paper, the con

    Aug 24, 2022

  • AUSIMM
    Differential Cut-Off Grades

    Detailed underground mine design and optimisation studies undertaken by the author over the past few years have clearly demonstrated that additional value can be created by varying the cut-off grade (

    Jan 1, 2005

  • AUSIMM
    A Non-Parametric Bayesian Framework for Automatic Block Estimation

    By A Melkumyan, F Ramos

    This paper addresses the problem of prediction of grade variables over volumes (block estimation) for an autonomous mine. Resource estimation is usually concerned with the prediction of the quality of

    Sep 26, 2011

  • AUSIMM
    Estimating the Rock Mass Strength of Hawkesbury Sandstone

    By R Bertuzzi

    "This paper presents preliminary results of ongoing research being carried out at the University of New South Wales Australia (UNSW) into improved methods for estimating rock mass strength. In this pa

    Nov 5, 2014

  • AUSIMM
    Optimisation of Ok Tedi's Medium-Term Production Schedules Using the Life of Business Optimisation System (LOBOS)

    By D Horacek, I K. Sheppard

    Ok Tedi is in a period of transition. By 2008 mill feed will consist of higher levels of high-grade but metallurgically challenging skarn ores. Additionally, the Taranaki pit will start production in

    Jan 1, 2007

  • AUSIMM
    QPM hematite by-product as an ironmaking feed material

    By G Reynolds, L Lu

    Queensland Pacific Metals (QPM) is developing its flagship Townsville Energy Chemicals Hub (TECH) facility to produce nickel and cobalt sulfates from imported high-grade nickel laterite ore for nickel

    Sep 18, 2023