    Washability modelling and estimation techniques used to improve coal handling preparation plant beneficiation

    By P J. Handley

    "Predicting how coal seams will be beneficiated through the coal handling processing plant (CHPP) has long been challenging within BHP Coal. Various coal seams from different areas are mined and stock

    Sep 20, 2017

  • AUSIMM
    Obstacles to Embedding Geometallurgy Decision-Making into Operations and how to Increase Maturity of this Critical Capability

    By G McCullough, B Mutsaers, J Jessop

    "*This is an abstract only* Geometallurgical initiatives have demonstrated considerable value to operations that have trialled them. However, it is extremely difficult for these initiatives to become

    Sep 29, 2013

  • AUSIMM
    Quantification of HPGR energy efficiency effects on downstream grinding process

    By H Lieberwirth, M Pfeifer, F Heinicke

    HPGRs (high pressure grinding rolls) have been developed within the last decades for energy efficient processing of a wide variety of ores. Special interest has been raised by projects increasing the

    Aug 24, 2022

  • AUSIMM
    Organisational Factors in Fatalities and High Potential Incidents

    By N LaBranche, G Callinan

    There has been a reduction in overall workforce in the mining industry during the current downturn; a corresponding reduction in fatalities and high potential incidents (HPIs) has not been observed. T

    Jun 22, 2016

  • AUSIMM
    Technology options for processing complex and double refractory gold ore

    By D Connelly

    The initial results for the cyanide leach gold recoveries were very poor on a high-grade primary sulphide ore of 6.2 g/t Au with no silver. Subsequent mineralogy showed the ore to be a characteristic

    Nov 21, 2018

  • AUSIMM
    Mount Isa Mines - 1100 Orebody, 35 Years On

    By S DeKruijff

    The Mount Isa Mines Copper Mine in Mount Isa started producing copper in 1966. The Copper Mine gradually increased production rates to nearly six million tonnes per year. Over the last three years the

    Jan 1, 2000

  • AUSIMM
    A methodology for assessing stope design modifying factors for the Olympic Dam Mine

    By S Tierney, D Cumming-Potvin, I Thin, Y Potvin, D Grant

    The preliminary modifying factors for future stope design in the Southern Mine Area of Olympic Dam consisted of only a single, arbitrary value of Equivalent Linear Overbreak/Sloughing (ELOS). In order

    Mar 15, 2021

  • AUSIMM
    Sustainable production from rehabilitated coal mine pastures in southern Queensland’s Brigalow Region – Acland grazing trial results

    By J Eberhard, C Paton, J Bennett, C Baillie, A Melland, J F. Clewett, T Newsome

    A central aim of rehabilitation is to ensure that disturbed land is returned to a post-mine condition that is safe, stable and self-sustaining. This paper describes initial results from a grazing tria

    Jul 25, 2018

  • AUSIMM
    Development of State-of-the-art Connection Types for Pipe Umbrella Support Systems

    By G M. Volkmann

    Pipe umbrella support systems – also called canopy tube systems – have been used successfully for tunnelling in challenging ground conditions since the 1970s. Historically, the drilling unit was the l

    Sep 17, 2014

  • AUSIMM
    Western Ring Route – Waterview Connection: Calculation of Ground Settlements and their Effects

    By J P. Burr

    The Waterview Connection will complete a strategic Auckland motorway route linking the south, west and north. The project will include 2.1 km of ‘undrained’ driven tunnels, 500 m of drained cut-and-co

    Mar 8, 2011

  • AUSIMM
    Mine Data Analytics – New Skills Required for Tomorrow’s Mines

    By P Knights

    This paper examines the process and specialised skills required to extract insight from data routinely collected by mine operations, maintenance, engineering and environmental departments. Typical ins

    Nov 22, 2011

  • AUSIMM
    Olympic Dam mine closure planning process

    By G Hill, D Grant, M Tyler

    Located approximately 570km NNW of Adelaide in South Australia, the Olympic Dam mine (OD) is the world’s fourth largest remaining copper and gold resource and the largest uranium resource. Discovered

    Jul 25, 2018

  • AUSIMM
    On equitable distribution of mining wealth and the social licence to operate imperative – an African case study

    By S Roberston, G Batt, R Shanahan, B Shah, A Trench, H Bromfield

    The geographic imperative of ore systems leaves mining, more so than virtually any other aspect of modern industry, heavily dependent on obtaining and maintaining social licence to operate. A prospect

    Nov 21, 2018

  • AUSIMM
    An analysis of productivity in sublevel caving mines

    By G R. Power

    A useful way to assess potential productivity of SLC mines is by quantifying tonnes/drawpoint/day to be extracted from the mine. However limited industry information has been published to help mines b

    Mar 15, 2021

  • AUSIMM
    Muck Pile Shaping for Draglines and Dozers at Surface Coalmines

    By M Nagarajan, S Esen

    This paper presents three case studies from three surface coalmines. The first case study is from a coalmine where a dragline operates in 60 m wide and 1 km long strips. Typical overburden height rang

    Aug 24, 2015

  • AUSIMM
    The Use of High-intensity Monitoring Data to Better Characterise Geotechnical Properties of a Non-homogeneous Rock Mass

    By P Corbett, P Sheffield

    Centennial Coal operates the Springvale longwall mining operation which extracts coal beneath the Newnes Plateau in the Western Coalfields of New South Wales. Springvale, and the neighbouring Angus Pl

    Nov 4, 2015

  • AUSIMM
    Development of a Corrosivity Classification for Weld Mesh Support at Cannington Mine

    Cannington Mine is an underground, hard rock, metalliferous mine located in North-Western Queensland, Australia. Weld mesh is installed to prevent the failure of rock from between the installed reinfo

    Nov 25, 2010

  • AUSIMM
    The Hydrogen Reduction of Iron Oxides in Calcined Bauxite

    The kinetics of the hydrogen reduction of iron oxides in granular calcined bauxite were studied at 550-1,050°C in a shallow bed reactor. The iron oxides behaved as a dispersion of particulate iro

    Jan 1, 1972

  • AUSIMM
    Application of the Distinct Lattice Spring Model on Toppling Failure of a Jointed Rock Slope

    By N Khalili, J Zhao, G F. Zhao

    Toppling failure of a jointed rock slope was studied by using the distinct lattice spring model (DLSM). Compared with the classical discrete element model, the DLSM has the advantages of free calibrat

    Nov 5, 2014

  • AUSIMM
    Challenging the Norms Time Usage Model – Mobile Underground Mining Equipment

    By R Ballantyne, M Adams

    Time Usage Models, used as a basis for calculating performance indicators for mobile mining equipment, have developed from very simple to very sophisticated models. This development has paralleled the

    Mar 15, 2021