Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Washability modelling and estimation techniques used to improve coal handling preparation plant beneficiationBy P J. Handley
"Predicting how coal seams will be beneficiated through the coal handling processing plant (CHPP) has long been challenging within BHP Coal. Various coal seams from different areas are mined and stock
Sep 20, 2017
-
Obstacles to Embedding Geometallurgy Decision-Making into Operations and how to Increase Maturity of this Critical CapabilityBy G McCullough, B Mutsaers, J Jessop
"*This is an abstract only* Geometallurgical initiatives have demonstrated considerable value to operations that have trialled them. However, it is extremely difficult for these initiatives to become
Sep 29, 2013
-
Quantification of HPGR energy efficiency effects on downstream grinding processBy H Lieberwirth, M Pfeifer, F Heinicke
HPGRs (high pressure grinding rolls) have been developed within the last decades for energy efficient processing of a wide variety of ores. Special interest has been raised by projects increasing the
Aug 24, 2022
-
Organisational Factors in Fatalities and High Potential IncidentsBy N LaBranche, G Callinan
There has been a reduction in overall workforce in the mining industry during the current downturn; a corresponding reduction in fatalities and high potential incidents (HPIs) has not been observed. T
Jun 22, 2016
-
Technology options for processing complex and double refractory gold oreBy D Connelly
The initial results for the cyanide leach gold recoveries were very poor on a high-grade primary sulphide ore of 6.2 g/t Au with no silver. Subsequent mineralogy showed the ore to be a characteristic
Nov 21, 2018
-
Mount Isa Mines - 1100 Orebody, 35 Years OnBy S DeKruijff
The Mount Isa Mines Copper Mine in Mount Isa started producing copper in 1966. The Copper Mine gradually increased production rates to nearly six million tonnes per year. Over the last three years the
Jan 1, 2000
-
A methodology for assessing stope design modifying factors for the Olympic Dam MineBy S Tierney, D Cumming-Potvin, I Thin, Y Potvin, D Grant
The preliminary modifying factors for future stope design in the Southern Mine Area of Olympic Dam consisted of only a single, arbitrary value of Equivalent Linear Overbreak/Sloughing (ELOS). In order
Mar 15, 2021
-
Sustainable production from rehabilitated coal mine pastures in southern Queensland’s Brigalow Region – Acland grazing trial resultsBy J Eberhard, C Paton, J Bennett, C Baillie, A Melland, J F. Clewett, T Newsome
A central aim of rehabilitation is to ensure that disturbed land is returned to a post-mine condition that is safe, stable and self-sustaining. This paper describes initial results from a grazing tria
Jul 25, 2018
-
Development of State-of-the-art Connection Types for Pipe Umbrella Support SystemsBy G M. Volkmann
Pipe umbrella support systems – also called canopy tube systems – have been used successfully for tunnelling in challenging ground conditions since the 1970s. Historically, the drilling unit was the l
Sep 17, 2014
-
Western Ring Route – Waterview Connection: Calculation of Ground Settlements and their EffectsBy J P. Burr
The Waterview Connection will complete a strategic Auckland motorway route linking the south, west and north. The project will include 2.1 km of ‘undrained’ driven tunnels, 500 m of drained cut-and-co
Mar 8, 2011
-
Mine Data Analytics – New Skills Required for Tomorrow’s MinesBy P Knights
This paper examines the process and specialised skills required to extract insight from data routinely collected by mine operations, maintenance, engineering and environmental departments. Typical ins
Nov 22, 2011
-
Olympic Dam mine closure planning processBy G Hill, D Grant, M Tyler
Located approximately 570km NNW of Adelaide in South Australia, the Olympic Dam mine (OD) is the world’s fourth largest remaining copper and gold resource and the largest uranium resource. Discovered
Jul 25, 2018
-
On equitable distribution of mining wealth and the social licence to operate imperative – an African case studyBy S Roberston, G Batt, R Shanahan, B Shah, A Trench, H Bromfield
The geographic imperative of ore systems leaves mining, more so than virtually any other aspect of modern industry, heavily dependent on obtaining and maintaining social licence to operate. A prospect
Nov 21, 2018
-
An analysis of productivity in sublevel caving minesBy G R. Power
A useful way to assess potential productivity of SLC mines is by quantifying tonnes/drawpoint/day to be extracted from the mine. However limited industry information has been published to help mines b
Mar 15, 2021
-
Muck Pile Shaping for Draglines and Dozers at Surface CoalminesBy M Nagarajan, S Esen
This paper presents three case studies from three surface coalmines. The first case study is from a coalmine where a dragline operates in 60 m wide and 1 km long strips. Typical overburden height rang
Aug 24, 2015
-
The Use of High-intensity Monitoring Data to Better Characterise Geotechnical Properties of a Non-homogeneous Rock MassBy P Corbett, P Sheffield
Centennial Coal operates the Springvale longwall mining operation which extracts coal beneath the Newnes Plateau in the Western Coalfields of New South Wales. Springvale, and the neighbouring Angus Pl
Nov 4, 2015
-
Development of a Corrosivity Classification for Weld Mesh Support at Cannington MineCannington Mine is an underground, hard rock, metalliferous mine located in North-Western Queensland, Australia. Weld mesh is installed to prevent the failure of rock from between the installed reinfo
Nov 25, 2010
-
The Hydrogen Reduction of Iron Oxides in Calcined BauxiteThe kinetics of the hydrogen reduction of iron oxides in granular calcined bauxite were studied at 550-1,050°C in a shallow bed reactor. The iron oxides behaved as a dispersion of particulate iro
Jan 1, 1972
-
Application of the Distinct Lattice Spring Model on Toppling Failure of a Jointed Rock SlopeBy N Khalili, J Zhao, G F. Zhao
Toppling failure of a jointed rock slope was studied by using the distinct lattice spring model (DLSM). Compared with the classical discrete element model, the DLSM has the advantages of free calibrat
Nov 5, 2014
-
Challenging the Norms Time Usage Model – Mobile Underground Mining EquipmentBy R Ballantyne, M Adams
Time Usage Models, used as a basis for calculating performance indicators for mobile mining equipment, have developed from very simple to very sophisticated models. This development has paralleled the
Mar 15, 2021