Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Olympic Dam Operations Review

    The Olympic Dam copper/uranium deposit was discovered in 1975 and subsequently commenced production in 1988 at a rate of 1.5 Mtpa using the sublevel open stoping mining method. In the following five y

    Jan 1, 1998

  • AUSIMM
    Computer Based Project Tools

    By Leaning R. W, Goodman P. J, Lidgate P. N

    The impact of computer based design tools on the engineering industry has been enormous. With the advent of computer aided design and its continual evolution into tools such as 3D design and photogr

    Jan 1, 1998

  • AUSIMM
    Murrin Murrin Heap Leaching Project

    By N Meadows, M Rodriguez

    A 200 000 tpa heap leach demonstration plant was approved by the Murrin Murrin Joint Venture (MMJV) in December 2005 and engineering commenced in January 2006. The demonstration plant will utilise sto

    Jan 1, 2006

  • AUSIMM
    Strategic mine schedule optimisation

    By A Tsoy

    This abstract describes long-term mining schedule optimisation approach that may be suitable for complex marginal projects and is based on modern scheduling techniques. CITATION: Tsoy, A, 2018. Strate

    Nov 21, 2018

  • AUSIMM
    Conventional and real-time sampler comparison study for inhalable and respirable dust

    By B Walsh, M Cattani, S Verpaele

    With the increasing sophistication of real-time sampling devices for occupational hygiene exposure assessment, research to objectively assess their performance is a priority. Using real-time monitorin

    Apr 16, 2024

  • AUSIMM
    Insights from evidence-based safety analyses

    By M Hassall

    There is a plethora of activities that have been, and continue to be, performed to improve the health, safety and well-being of workers involved in resource industry activities. These activities inclu

    Apr 16, 2024

  • AUSIMM
    A practical approach to improve investigations and identify systemic organisational issues

    By M Alston

    Many organisations struggle to yield meaningful outcomes from incident investigations. This paper will demonstrate that we can discover systemic issues by rethinking the ‘Why’ and ‘How’ of investigati

    Apr 16, 2024

  • AUSIMM
    Deriving maximum value from mineral waste streams

    By D Osborne

    Current mineral extraction and valorisation activities still have a strong focus on the ‘delivered product(s)’ which might be a bulk commodity such as metallurgical coal, hematite, bauxite, etc., and

    Sep 1, 2024

  • AUSIMM
    Lifestyle in Fly-in, Fly-Out Operations Versus Residential Operations: A Personal Comparison and Choice

    This report will differ slightly from the traditional scientific and technical discussions given at this type of conference. It will focus on the personal experiences and choices that I undertook when

    Jan 1, 2005

  • AUSIMM
    You don’t know what you don’t know

    By P Micale

    Geological data provides the foundations for the mining value chain. It is used to underpin the modelling and planning and consequently optimise downstream business decisions. However, it is often for

    Mar 22, 2022

  • AUSIMM
    Enhancing dragline safety – a multi-layered proximity detection system

    By B Murphy

    Seeking to reduce the likelihood of uncontrolled personnel entry into the operating footprint of a dragline, Coronado Global Resources initiated a review of proximity detection systems currently avail

    Sep 1, 2024

  • AUSIMM
    From Blasthole to Reverse Circulation Sampling – Changing Grade Control Methods at Black Star Open Cut Zinc-Lead Mine, Mount Isa, Queensland

    By B Young

    Variable bench heights, interaction with underground workings and a steeply dipping orebody are challenges faced daily by geologists at Xstrata Zinc’s Black Star Open Cut (BSOC) Zinc/Lead/Silver mine

    Aug 22, 2011

  • AUSIMM
    The 250 million ton per annum spatial digital twin

    By M Pomery

    BHP’s Western Australian Iron Ore Operations (WAIO) move approximately 250 million tons of ore per annum. The magnitude of the constant changes to the terrain models along with the diverse output and

    Sep 18, 2023

  • AUSIMM
    Visual Computing and Mine Design

    Visual computing opens the design process to a wider audience and allows rapid communication of mine plans to all stakeholders. The integration of software and hardware technologies that take advantag

    Sep 26, 2011

  • AUSIMM
    Thermoelectric Power Measurements of Particulate Chalcopyrite Samples from the Mt Isa Mine

    By Kobayashi M

    Particulate chalcopyrite samples (78 ~ 98 mole per cent chalcopyrite, screen size fraction from 710 to 250 µm) were prepared by crushing and sieving lump ore samples from 12 locations in the Mt I

    Jan 1, 1990

  • AUSIMM
    When Nothing is What You Need – The Importance of Using Blanks at All Stages of Sample Preparation

    By J Webb

    "It is vitally important in projects where the cut-off grade is low that there is no contamination during the sampling and sample preparation process, both in the ore and the waste zones. Failure to i

    Jul 29, 2014

  • AUSIMM
    New Zealand Offshore Gold Exploration - The Harvester Project

    By N G. Corner

    A sea bed sampling programme by CRA Exploration Pty Limited over an area of 12 000 km offshore from Westland, Southland and Otago, New Zealand, led to the discovery of the Harvester Prospect, an area

    Jan 1, 1990

  • AUSIMM
    Study of Wave Formation in a High Strength Bottom Injected Metallurgical Vessel

    By R H. Eric

    Surface wave formation induced by a high-strength submerged jet in a bottom blown metallurgical vessels has been studied experimentally by using one-seventh water model of CLU (Creusot-Loire Uddeholm)

    Jan 1, 2000

  • AUSIMM
    New Zealand Offshore Gold Exploration - The Harvester Project (bcafb7fe-f4fe-443d-a859-746bfe203af9)

    By Corner NG

    A sea bed sampling programme by CRA Exploration Pty. Limited over an area of 12000 km offshore from Westland, Southland and Otago, New Zealand, led to the discovery of the Harvester Prospect, an area

    Jan 1, 1990

  • AUSIMM
    Tectonic Setting for the Emplacement of Granitoid Rocks in Burma

    The granitoid rocks in Burma can be subdivided into three main belts viz. (1) Eastern Granitoid Belt, (2) W-Sn related, Central Granitoid Belt and (3) Porphyry Cu (Au)-related, Western Granitoid Be

    Jan 1, 1987