Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Adapting to Ore Characteristics at Lac des Iles Mine

    By Erin N. Legault-Seguin

    The Lac des Iles Mine (LDI) is located approximately 100 km northwest of Thunder Bay, ON. The mine has been in operation since 1993. The initial mine production was 2,300 mtpd and increased to 15,000

    May 1, 2009

  • CIM
    Paste Production Storage Mechanism (PPSM), a Major Advance in Solids Concentration Technology

    By Rudy Tenbergen, Dick Farmery, Jim Naylor

    "Paste backfill has replaced cemented rock fill as one of the components to improve ground · control and mine safety at the Macassa Operation of Kinross Gold Corporation in Kirkland Lake, Ontario. It

    Jan 1, 1997

  • CIM
    Barrick Gold Corporation - Est Malartic

    By Pierre Pelletier, Christian Pichetie, Dany Pelletier

    "IntroductionDuring 1994, Barrick Gold Corporation, or American Barrick at that period, acquired Lac Minerals Ltd. properties. One of them was the Bousquet Complex. The Bousquet Complex is divided int

    Jan 1, 2000

  • CIM
    Optimum Equipment Management through Life Cycle Costing (c0e511d8-44ab-43ca-828c-72662e49cf23)

    By Jessica Barber

    Problem ? Mining operations consistently need equipment that is available, and able to perform to its maximum potential ? The most difficult part of a Maintenance Manager?s job is often a lack of kn

    May 1, 2008

  • CIM
    Comparison of Ore Hardness Measurements for Grinding Mill Design for the Tenke Project

    By David Meadows, John Starkey

    "As part of the ongoing project development for the Tenke Fungurume Copper-Cobalt Project in the Democratic Republic of Congo, Phelps Dodge Corporation has examined methodologies for determining the s

    Jan 1, 2007

  • CIM
    Accounting for Dilution in Ore Resource Estimation

    By Mario E. Rossi

    The full economic evaluation of a mining project requires a block model that provides an estimate of the tons and grades of available resources. The model must be representative of the mineralization

    May 1, 2009

  • CIM
    Update of Span Design Curve for Weak Rock Masses

    By Andrea M. Ouchi

    A major focus of ground control research presently being conducted by the Geomechanics Group in the University of British Columbia Mining Engineering Department is to incorporate weak rock masses (RMR

    May 1, 2004

  • CIM
    Design and Development of an LHD for Narrow-Reef Mining

    By Patrick F. R. Murphy

    The mechanization of platinum group metal (PGM) underground reef mining in South Africa has posed a challenge to mining engineers for several decades. This is primarily due to the shallow dip angles a

    May 1, 2003

  • CIM
    Cluff Lake Mill - Phase 2 Expansion

    By H. A. Schnell

    "The Phase I Mill at Cluff Lake in northern Saskatchewan was designed to accommodate a very specific high grade uranium ore. As this high grade ore was depleted, construction was undertaken on a new m

    Jan 1, 1985

  • CIM
    The “Mill Redesign Project” at INCO’s Clarabelle Mill (54ceb038-1593-4f87-9a10-6e2a572d48df)

    By Jim Truskoski, Alain Bouchard, Andy Kerr, Germain Labonté, Jim Barrett

    "Improving mill grade recovery relationships is always good business. INCO’s Clarabelle Mill has just undergone a $16 million process upgrade that was designed to improve nickel recovery by 2%. The “M

    Jan 1, 2003

  • CIM
    Red Dog Lead Regrind Circuit Optimization

    By Brigitte Lacouture, Yeen Shien Hwang, David Lin

    "A baseline survey of the partially open lead regrind circuit at Red Dog Mine indicated poor regrind efficiencies for the three parallel 450 HP tower mills. Driven by the high energy cost and the pote

    Jan 1, 2005

  • CIM
    Dust Control at Granisle Copper

    By L. W. Hamel

    "DUST CONTROL - GRANISLE COPPER LIMITEDINTRODUCTIONGranisle. Copper Limited is located in the north-central region of the Province of British Columbia, approximately 200 road miles north-west of Princ

    Jan 1, 1976

  • CIM
    Accounting for Risks in Economic Evaluation of Gold Mining Projects in Ghana ? A Case Study

    By Peter A. Eshun

    This paper studies two methods that account for risks associated with gold mining projects such as mineral risks and country risks. The first method is sensitivity analysis, which investigates the eff

    May 1, 2004

  • CIM
    Beneficiation of Oolitic Iron Ores

    By K. Peake, A. Dalvi, V. Hernandez, S. Chang, M. Oliazadeh

    "Ironstone Resources Ltd. is developing the Clear Hills oolitic iron ore deposit in northwest Alberta, Canada. Sources of oolitic iron ore worldwide are abundant and ubiquitous, but there is currently

    Jan 1, 2014

  • CIM
    “Energy Management Program”

    By K. H. B. Wenzl

    "Since the autumn of 1973, the world's attention was captured by the startling revelation that conventional energy supplies were not inexhaustible but were in fact quickly dwindling with future shorta

    Jan 1, 1978

  • CIM
    Simulation of Closed Circuit Mineral Processing Operations Using Limn® ?Flowsheet Processing Software.

    By Donald Leroux, Colin Hardie

    "New or improved mathematical models of mineral processing machines are published almost on a monthly basis. Often, these models can be calibrated from bench-scale test results and programmed using sp

    Jan 1, 2003

  • CIM
    Using Gas Monitoring and Personnel/Vehicle Tracking to Maximize the Benefits of Ventilation-On-Demand in Underground Mining Operations

    By Tanveer Jahir

    With increasing energy costs and mounting government pressure to adopt low emission, green sources of energy, it has become imperative to develop long-term sustainable underground infrastructures that

    May 1, 2011

  • CIM
    Hydraulic Excavator versus Electric Rope Shovel Performance

    By J. Sammut, T. G. Joseph, R. Andreev, M. Curley

    "Decisions regarding mining method and subsequent choice of excavator must take into account the quantitative factors of productivity, availability, and capital, operating, and maintenance costs. Dig

    Jan 1, 2019

  • CIM
    Application Practice of Bottom Blowing Continuous Converting to Replace Copper P-S Converter

    By Hongfei Li, JianLong Wang

    This paper introduces the technical characteristics, transformation scheme and production practice of the project in which Copper P-S Converter was replaced by Bottom Blowing Continuous converting for

    Jan 1, 2019

  • CIM
    A liquefaction incident in a fill raise: A case study

    By F. Hassani, K. Moozar, J. Ouellet, P. Gauthier

    "This paper describes a sudden spill of waste rock used for backfilling from a waste pass at an underground mine in Canada, thus causing a major failure/accident. The mine operator immediately launche

    Jan 1, 2004