Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Applications of GPS-based navigation systems on mobile mining equipment in open-pit mines

    By Jonathan Peck, Carl Hendricks

    "Global Positioning Satellite (GPS) based positioning and navigation systems have been recently developed and implemented by AQUILA Mining Systems Ltd. on blast hole drills and electric cable shovels

    Jan 1, 1997

  • CIM
    Discontinuum Mechanics of Linear Rock Masses

    By C. Yanqui

    "Discontinuum Mechanics is based on two foundations: the idealization of the internal structure of substances, and the principle of the arithmetic mean value. For a linear discontinuum, the methods of

    Jan 1, 2015

  • CIM
    A Method of Appraising Lost Production for Mined-Through Coal-Bed Methane Wells

    By Philip W. Johnson, Charles D. Haynes

    "Abstract - The coalbed methane industry has become a prominent source of domestic natural gas, with its technology having evolved over the past 30 years. Whereas most coalbed methane wells are able t

    Jan 1, 2006

  • CIM
    Maintenance of Undergrot:1nd Trackless Mining Equipment at Gaspé Copper

    By A. J. Stapleton

    "This paper gives a brief description of the occurrence and development of the Needle Mountain mine at Gaspe Copper Mines, Limited and describes the trackless mining equipment used in this highly mech

    Jan 1, 1969

  • CIM
    Geology of the Stratmat Boundary and Heath Steele N-5 Zones, Bathurst Camp, Northern New Brunswick

    By Art Hamilton

    Abstract -The Zn-Pb-Cu-Ag ore deposits of the Boundary and N-5 zones near Bathurst, New Brunswick, occur in a polydeformed volcano-sedimentary sequence that is part of the Ordovician Tetagouche Group.

    Jan 1, 1992

  • CIM
    Evaluating the Transition to Filtered Tailings at Cerro Negro

    By P. Lind, A. Gagnon

    "Goldcorp has embarked upon an ambitious, industry-leading, multi-year water use reduction effort. This is a proactive, voluntary effort that reflects our commitment to truly sustainable mining. This

    Jan 1, 2017

  • CIM
    Operation of Centrifugal Pumps

    By Mark W. Booth

    THE Dominion Steel and Coal Corporation, as a coal mining concern and as a steel industry, has much pumping to do, and the conditions are as varied as it is possible to make them. We are faced with ha

    Jan 1, 1944

  • CIM
    The Use of Hydraulic Cyclones in the Filtration of Sullivan Lead Concentrates

    By D. B. Smith

    DURING the summer of 1953, test work commenced at the Sullivan Concentrator with a view to the modification of filtration practice by the inclusion of wet cyclone classification of the lead concentrat

    Jan 1, 1956

  • CIM
    The Collection of Open Hearth Dust and Its Reclamation Using the SL/RN Process

    By G. G. W. Thom, A. A. F. Schuldt

    At The Steel Company of Canada, Limited, iron oxide dust from the basic oxygen open hearths is being collected by means of electrostatic precipitators. The utilization of this dust, which has been ham

    Jan 1, 1966

  • CIM
    Evaluating the Effect of Operational Changes at Vale Inco's Clarabelle Mill

    By J. Doucet, C. Price

    In an industrial setting, operational changes are continually introduced, driven by new technologies or changing economics. Because of day-to-day variability, quantifying the impact of these changes b

    Jan 1, 2009

  • CIM
    Risk Identification Expert System for Metro Construction Based on BIM

    By Limao Zhang

    This paper presents a BIM-based Risk Identification Expert System (B-RIES) for metro construction, composed of three main built-in subsystems: BIM extraction, knowledge base management, and risk ident

    Aug 1, 2013

  • CIM
    Hydrogeochemical Methods Application in the Canadian Shield

    By A. Y. Smith, R. J. Allan, E. H. W. Hornbrook, R. W. Boyle, W. Dyck

    "HYDROGEOCHEMICAL METHODS in the Canadian Shield can be based on analyses of the following :(1) spring waters and their precipitates;(2) stream and river waters;(3) lake and muskeg waters;( 4) ground

    Jan 1, 1971

  • CIM
    Developments in the Design of Large Slope Hoists

    By J. A. Russell

    IT IS the purpose of this paper to show how the design of the larger slope hoists in use in the mines of the Dominion Steel and Coal Corporation has tended to evolve ta suit the particular conditions

    Jan 1, 1944

  • CIM
    Concrete Aggregates for British Columbia Construction Projects

    By P. J. Routledge

    THE purpose of this paper is to discuss the practical aspects of locating gravel deposits and of establishing efficient, portable concrete aggregate beneficiation plants for use on construction projec

    Jan 1, 1962

  • CIM
    Thermoluminescence of Rocks as a Prospecting Tool-Equipment and Methods

    By D J. McDougall

    Due to changes in the solid-state conditions of minerals in the rocks surrounding hydrothermal, contact meta-somatic or metamorphosed ore deposits, positive or negative thermoluminescent anomalies may

    Jan 1, 1965

  • CIM
    Recent Trends in Autogenous Grinding

    By Bunting S. Crocker

    This paper reviews the trends in the past two years in autogenous grinding throughout the world. It covers rock grinding in South Africa, Sweden, Canada, the United States, Finland and Germany. To pro

    Jan 1, 1963

  • CIM
    Metamorphic Mineralogy of the Dore Lake Complex in the Victinity of the Grenville Front

    By S. Kline

    The compositions of metamorphic minerals of the south limb of the Dore Lake Complex have been determined by microprobe techniques. Mineral assemblages typical of the greenschist facies occur in Mg-ric

    Jan 1, 1984

  • CIM
    The Business Case: Defining the Project

    By Rob Boom, Yasuyuki Tozaki, Greg Traquair

    The objectives of the business case are to examine a proposed metallurgical project and answer fundamental questions about project feasibility, risks, opportunities, and value. A business case fulfill

    Jan 1, 2015

  • CIM
    Rock Drilling with Tungsten Carbide Bits

    By J. H. Fulton

    Summary Considerable test work has been done with the detachable type of carbide bit. In general, these bits improved drilling operations, but at a bit cost .greater than was compensated for by the

    Jan 1, 1950

  • CIM
    Michelin Uranium Project, Labrador, Canada: Metallurgical Test Work, Economic Studies, and Process Design

    By J. R. Goode

    ABSTRACT Aurora Energy Ltd. is considering a 10,000 t/d process plant to produce 97 million lb (43,998,460 kg) of U3O8 over a 17-year project from uranium deposits in coastal Labrador. This paper summ

    Jan 1, 2012