  • CIM
    Permitting, Construction and Commissioning of a New Slag Landfill at Boliden Harjavalta

    By Esa Peuraniemi, Hanna-Leena Heikkilä

    Boliden Harjavalta has been operating a copper flash smelter since 1949. Thus, in 2019, the smelter is celebrating its 70th anniversary of flash smelting. Slag formation is an integral part of the sme

    Jan 1, 2019

  • CIM
    Exploring Metal Recycling Business In China

    By K. Soga

    DOWA has long been specialized in the treatment of complex massive sulfide ores from exploration through smelting. Its competitive advantage derived from ore dressing technology to dress and concentra

    Jan 1, 2007

  • CIM
    Effect of Scale and Structure on the Strength and Deformability of Rocks

    By I. Pérez-Rey, J. Arzúa, L. R. Alejano

    "The decrease in strength with increasing rock specimen size is usually associated to the increase in the number of defects inside the specimens at small scale (centimeters) but also to the role of th

    Jan 1, 2015

  • CIM
    Ore Pebble Regrind of Sulphide concentrates in the Hardy Concentrator, Falconbridge

    By S McQuitty

    The metallurgical treatment of Falconbridge ore re-quires an extremely fine grind of the pyrrhotite portion ? for maximum liberation and recovery of nickel. This paper describes the operation of a gra

    Jan 1, 1964

  • CIM
    A Comparison of the Anchorage Performance of Cable Bolts Based on a Newly Developed Testing Methodology

    "With the plethora of cable bolts on the market, geotechnical engineers can be baffled by the differences in performance claims from the manufacturers but perhaps more importantly they are sometimes a

    Jan 1, 2015

  • CIM
    Solidification Mechanisms of Melt Conditioned Direct-Chill (MC-DC) Casting

    By Jayesh B. Patel, Zhongyun Fan, Hu-Tian Li

    "Melt conditioned direct-chill (MC-DC) casting is a novel technology which combines vertical direct-chill (DC) casting with a high shear device directly immersed in the sump for in situ microstructura

    Jan 1, 2018

  • CIM
    Ultrafast Recovery of Hydrophobic Particles Using a Novel Hydrophobic Binder Medium

    By K. van Netten, T. P. Ernst

    "Froth flotation has been used successfully for about a century in the beneficiation of both coal and mineral particles. With the on-going trend towards lower feed grades, however, there is a need to

    Jan 1, 2016

  • CIM
    Enhanced Separation of Rare Earth Elements

    By A. Welty, T. Garn, K. Lyon, B. Jakovljevic, R. S. Herbst, M. Greenhalgh, Cytec Solvay Group

    "Industrial rare earth separation processes utilize PC88A, a phosphonic acid ligand, for solvent extraction separations. The separation factors of the individual rare earths, the equipment requirement

    Jan 1, 2016

  • CIM
    Blasting Practices in Some Coal Mines of Nova Scotia

    By L. H. Bergmann

    THE blasting practices described are fairly representative of those employed in the coal mines of Eastern Canada. As such, they may be of interest to Western Canadian coal mine operators. The treatmen

    Jan 1, 1945

  • CIM
    The Purchase of Mechanical Equipment for Mines

    By D. S. Hines

    The purchase of mechanical equipment for mines is not unlike the purchase of other materials or supplies in general principle, but on account of the major part such equipment plays in the operations,

    Jan 1, 1930

  • CIM
    Hydro-Mechanical Response of Hydraulic Fractures

    By Mohammadreza Jalali

    Alberta contains over 400 billion barrels of viscous crude oil in fractured carbonates but there is no viable extraction technology as yet. Petroleum geomechanics has become a vital part of the assess

    Jun 1, 2012

  • CIM
    Increased SAG Grinding Capacity at Goldex Secondary Crushing of SAG Mill Feed

    By A. Allaire

    The Goldex operation of Agnico-Eagle Mines (AEM) commenced operations in the spring of 2008. Following some months of initial operation, the grinding circuit capacity was under-performing according to

    Jan 1, 2012

  • CIM
    Design and Construction of a 1/40th Scale Longwall Mine Model for Physical Testing of Methane Explosions

    By R. C. Gilmore, J. McMack, G. E. Bogin, J. F. Brune, C. DeRosa

    "Researchers at the Colorado School of Mines are designing and building a 1:40 scaled physical model of a fully operational longwall coal mine. The purpose of the model is to minimize the occurrence o

    Jan 1, 2019

  • CIM
    Belledune generating station: coal handling plant and flue gas scrubber

    By E. R. Rivenbark

    "The coal handling plant represents an investment of about $100 million in coal handling and storage equipment. The coal receiving is done by a continuous ship unloader that can handle ships in the 60

    Jan 1, 1994

  • CIM
    Battery Energy Storage As A Way To Reduce Remote Mine Electricity Costs

    By Jakob Janzen

    This paper demonstrates that the introduction of a Battery Energy Storage System (BESS) into an isolated diesel generator based grid has the potential to reduce the electricity cost and deliver a good

    Aug 1, 2013

  • CIM
    A Multi-Factor Decision Making Model for Investment in Coal Resource Development Based on Real Options

    By Jinsuo Zhang

    Investment in coal resource development is affected by a variety of uncertain factors. Investors can make a flexible, strategic decision to achieve the value of risk implicated in those uncertain fact

    Aug 1, 2013

  • CIM
    An Integrated Quality Management System for Piping Fabrication Using 3D Laser Scanning and Photogrammetry

    By M Safa

    Addressing deficiencies and defects that occur during construction projects is costly and time consuming. The manual quality assurance programs currently used in the industry have certain limitations,

    Aug 1, 2013

  • CIM
    A Reconnaissance Geochemical Survey In the Seal Lake Area, Labrador

    By J. J. Brummer

    "A reconnaissance geochemical survey, using the stream sediment technique, is described. The survey covered an area of about 400 square miles, in the Seal Lake area of central Labrador, underlain by b

    Jan 1, 1960

  • CIM
    Geology and Structure as Related to Mining

    By P. M. Hedley

    GOLD mining in Nova Scotia, as in any other gold district, has its own peculiar problems. Being in close proximity to excellent roads and to railways, and being blessed with good labour, the majority

    Jan 1, 1941

  • CIM
    Simulation - An Approach to Risk Analysis in Coal Mining

    By João Felipe Costa, Jair Carlos Koppe, André C. Zingano

    Abstract - Traditional mine planning based on block models built with interpolation techniques such as kriging does not take into account the uncertainty associated with the estimates. These models ar

    Jan 1, 2000