Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Platinum-Group Element Deposits

    "10.1. IntroductionAs discussed by Westland (1981), the six platinum-group elements (PGE) belong to the Group VIII transition metals, to which iron, nickel and cobalt also belong. The chemical similar

    Jan 1, 1979

  • CIM
    Mine reconciliation ? for better or worse!

    By Rayleen Riske

    Why do we look for better reconciliation when times get tough? Why wait? Mine reconciliation should be a priority throughout the good times too. In fact, with good reconciliation, those good times are

    May 1, 2010

  • CIM
    Paste Fill Design at the Louvicourt Mine

    By Pierre Lacombe

    "The operation of the Louvicourt Mine will have to rely on stringent grade control and on the optimization of the amount of blocked ore made available per given development effort. All of the above be

    Jan 1, 1995

  • CIM
    Frother Analysis: Procedure and Plant Experiences

    By James A. Finch, Stéphanie Gélinas

    "A colorimetric technique, originally developed for methyl iso butyl carbinol (MIBC) based on the Komarowsky reaction, has been extended to a wide range of common mineral flotation frothers. The proce

    Jan 1, 2007

  • CIM
    Raising a Blind Shaft Between Two Submarine Coal Seams

    By Jos. Kalbhenn

    PART of the plan of re-allocation evolved by the engineers of the Dominion Steel and Coal Corporation in 1932 to retard the rapid advance of the submarine workings seawards was the opening of Dominion

    Jan 1, 1944

  • CIM
    Optimization of SAG Mill Process Control at the Raglan Mine

    By G. Couture, J. -F. Dubé, F. Letarte-Lavoie

    "The Xstrata Nickel Raglan concentrator, located in Quebec’s Nunavik region, has been in operation since 1997. Originally designed to process 800,000 tonnes per year of high-grade nickel ore, the plan

    Jan 1, 2013

  • CIM
    Kiena Maintains Up To Date Image with a New Gold Mill

    By R. Jolicoeur, J. F. Jackson, M. A. Green

    "The design, construction and commissioning of Kiena Gold Mines Limited's new mill was completed in 15 months ending in September 1984. Rated at 1250 tonnes per day the mill incorporates the latest in

    Jan 1, 1986

  • CIM
    GHG Emissions in the Mining, Metallurgy and Petroleum Sectors

    By Pierre Boileau

    Outline ? Who are We? ? Canada?s GHG Emissions 1990 - 2000 ? Emissions from the Petroleum Sector ? Emissions from Petroleum Exports ? Emissions from Manufacturing Industries ? Emissions from Min

    Nov 1, 2002

  • CIM
    Framework for optimizing components in an oilwell cement slurry design

    By D. Getzlaf

    "Oilfield cementing has been utilized in the industry since the turn of the century. Originally, wells were shallow and criteria for well integrity were somewhat limited. Since that time, wells have s

    Jan 1, 2004

  • CIM
    Aeration in Plant Practice

    By K. V. Konigsmann

    "The results of Mr. Klymowsky's research confirm the essential role played by oxidation products in the flotation of base metal sulphides. They invite a discussion on the subject of aeration which I m

    Jan 1, 1973

  • CIM
    Instrumentation of a Graphite Zone in the #3 Shaft at Brunswick Mine

    The #3 Shaft at Brunswick Mine, Bathurst, New Brunswick, Canada, intersects a soft graphite zone just below the 3400 Level. Ground movement within this zone causes the concrete liner of the shaft to b

    May 1, 2009

  • CIM
    Effect of environmental variables on pitting corrosion

    By S. Rajeswari, D. Gopi

    "Pitting corrosion inhibition of 304 stainless steel (SS) in groundwater with a ternary inhibitor mixture (phosphonic acid + bivalent cation + various surfactants) was studied with different environme

    Jan 1, 2003

  • CIM
    Yield Stress Measurement of Cemented Paste Backfill with the Vane Method and Slump Tests

    By A. S. Moghaddam

    The transportation of cemented and non-cemented mine tailings in the form of paste through pipelines is one of the main stages of paste backfill operations. For the purpose of pipeline design, the rhe

    May 1, 2007

  • CIM
    Optimisation of Coke Breeze Addition in Iron Ore Pellets

    By G. Paquet, E. Godin

    "Since the mid fifty's, worlwide pellet production capacity has constantly risen (Fig. 1, Ref. 1 l. There was however at that time no real incentive to decrease production costs but only to produce as

    Jan 1, 1986

  • CIM
    Improved Hydrogen Cyanide Detection with Laser-Based Line-of-Sight Gas Detectors

    By Klaus Tietz, Hamish Adam, John Selby, Ian Glazier, Brian Sinfield

    "Room-temperature tunable diode laser (TDL) analyzers are gaining in acceptance for highly critical safety monitoring applications in a variety of industries. This paper describes the testing, evaluat

    Jan 1, 2011

  • CIM
    Comparison of Uranium Solvent Extraction Strip Options

    By Deon van Tonder, Chuck Edwards

    "Solvent extraction is used in many acid leach uranium circuits to upgrade and purify the uranium bearing solution prior to final product precipitation. A number of strip options are available to reco

    Jan 1, 2013

  • CIM
    New Technologies for Improved Processing of Base and Precious Metals Containing Ores

    By J. Lee, M. Peart, T. Bhambhani, D. R. Nagaraj, P. Riccio

    "Over the past decade or so, our efforts have focused on developing the rationale and concepts for new technology in reagent development and optimization in the processing of base and precious metals.

    Jan 1, 2013

  • CIM
    Application of biotechnology for treatment of nitrogen compounds in gold mill effluents

    By W. D. Gould, A. Kapoor, K. Morin, P. Bédard

    This paper presents the results of a research study that is being conducted by the Mine Effluents Program, Mining and Mineral Science Laboratory (MMSL), Natural Resources Canada aimed at evaluating bi

    Jan 1, 2004

  • CIM
    A Study of Cemented Crude Tailings Backfill Technology Based on Vertical Sand Silos

    A key point in the manufacture of cemented backfill is the dewatering and settlement of the total tailings product. A new technology characterized by rapid non-mechanical settlement of total tailings

    May 1, 2007

  • CIM
    Sulphur Compounds and Metal removal using Bioprocess Technology

    By Andre L. De Vegt, Cees J. N. Buisman

    "For the past eight years Paques has been engaged in the development and installation of treatment systems based on biotechnological processes to remove sulfur compounds from water, air and gaseous st

    Jan 1, 1997