Philadelphia Dock Story—Pile Challenges at Delaware RiverBy Craig H. Olson
"A new ship dock at a Philadelphia area refinery will be capable of docking the largest tanker to travel the Delaware River, the Stena V-MAX, which will induce significant lateral loads. The loads at
Jan 1, 2008
-
Philadelphia Dock Story—Pile Challenges at Delaware River (06bf9951-abf5-4656-aab7-81fa955662d4)By Craig H. Olson
"Anew ship dock at a Philadelphia area refinery will be capable of docking the largest tanker to travel the Delaware River, the Stena V-MAX, which will induce significant lateral loads. The loads at t
Jan 1, 2008
-
Rock Excavation and Underpinning below a 19-Story BuildingBy Kevin P. Gleckler, Steven C. Highfill
"Escalators to access platforms for the Second Avenue Subway Station at 72nd Street in Manhattan are to be installed in the basement of an existing 19-Story residential building. The escalators, which
Jan 1, 2016
-
ACIP Pile Performance and Installation in the Northeastern United StatesBy Jr NeSmith
"Augered-cast-in-place (ACIP) pile installation technology has matured extensively since the first auger, pressure grouted pile was patented in 1959. The current technology allows for successful pile
Jan 1, 2016
-
Drilling and Grouting For the Rehabilitation of Contaminated Areas: An Italian Case HistoryBy Raffaella Granata, Daniele Vanni
"This paper presents the drilling and grouting program performed at two abandoned landfills located into former calcarenite rock quarries in Manfredonia, Italy. Tests performed after the abandonment o
Jan 1, 2016
-
Instrumented Pile Load Tests on ACIP Piles for a Real Estate Project in Kolkata-A-Case StudyBy Krishnendu Mandal
"For a multi-story building project in Kolkata, a pile load testing program was conducted to minimize pile performance uncertainty resulting from variable subsurface conditions and to verify the pile
Jan 1, 2015
-
Willow Island Hydroelectric Project: Taming the Ohio River to Create Green EnergyBy James M. Tantalla, Jr. Ellman
"Construction of the powerhouse for the Willow Island Hydroelectric Project, located at the Willow Island Lock and Dam, required a 120-ft deep temporary excavation inside the limits of a cellular coff
Jan 1, 2016
-
The Development and State of Practice of Cutter Soil Mixing in North America – The First 10 YearsBy Brian Wilson, Franz-Werner Gerressen
"Cutter Soil Mixing, also known as CSM, was developed in Europe as an alternate method of Deep Mixing to the more traditional single and multiple auger techniques, and brought to market by Bauer Masch
Jan 1, 2015
-
Large Diameter Helical Piles for Refinery ExpansionBy Chris Normand, Paul Volpe, Eric Wey, Howard Perko, Burt Ogilvie, Patrick Murray
"A refinery expansion project for Marathon Petroleum Company in Southern Louisiana required existing medium to large pipe racks to be expanded for additional capacity. Foundation modifications were ne
Jan 1, 2017
-
New Insights into Driven Pile Vibrations using Novel Data Management and Visualization ToolsBy Mark Zablocki, Dakarai McCoy
Ground vibrations are an unavoidable effect of driving piles and may pose a risk to nearby infrastructure and the comfort of adjacent occupants. Driven-pile-induced ground vibrations are known to vary
Sep 8, 2021
-
Monopile Construction Technique For Mumbai Coastal Road Package 1 - MumbaiBy T Vijayakumar, Vipul Dobhada, Rajesh Patel, Swarnadip Dey, Naveen Babu D
The most challenging scope of any bridge project in marine or inter tidal zone is to construct sub structure like well Foundation, group pile, pile cap etc. Similarly, it also affects the marine envir
Sep 1, 2022
-
The Deep Cut-Off at the Walter F. George Dam"TREVIICOS CorporationINTRODUCTIONThe Walter F. George lock and dam was constructed on the Chattahoochee River between 1955 and 1963 with the double function of improving navigation and generating pow
Jan 1, 2014
-
Cannonsville Dam Emergency Borehole ResponseBy John Vickers, William H. Hover, Paul C. Schmall
"Any sudden subsurface issue that threatens the stability of existing buildings or infrastructure is cause for immediate investigation and prompt remedial action. Nowhere is this more true than the n
Jan 1, 2016
-
Seepage Barrier Mix Design Development, Installation, and EvaluationBy George W. Little, John Councilman
"The selection, evaluation, and modification of contractor mix designs for self-hardening seepage barriers, completed by the slurry trench excavation method, can be one of the most critical and challe
Jan 1, 2016
-
Deep Cfa Piles Application For Foundation In QueenslandBy Sameh M. Khella
This paper discusses the application of deep CFA piles for the foundation of structures in different ground stratifications with a focus on the application in Queensland region. Design, construction t
Nov 1, 2022
-
Emergency Jacking Tunnel in Compressible SoilBy Tai Luu, Michael McNicholas, James C. McIntyre
The Jersey City Municipal Utilities Authority (JCMUA), discovered that an existing sewer pipe had collapsed under the New Jersey Transit Conrail Railroad between Pine Street and Ash Street in Jersey C
Jan 1, 2019
-
2022 OPA Winner: Mosul Dam Rehabilitation ProjectBy Raffaella Granta
Mosul Dam is an earth fill dam located on the Tigris River, approximately 40 km (25 mi) northwest of Mosul, Iraq. The construction of the dam was completed in 1984. It is one of the largest multipurpo
Oct 1, 2022
-
Laboratory Validation Of In-Situ Tests - 1. IntroductionThis paper summarizes seven years of Italian experience with the use of large calibration chambers for the calibration, under closely controlled stress and strain conditions, of some in situ testing
Jan 1, 1987
-
Stabilizing A 100 Ft Rock Slope With Limited Access And Tight Construction Tolerances Using Observational Method And Real-time 3d ModelingBy Travis A. Shoemaker, Mitchell S. Youmans, Nancy T. Chin, Michael S. Senior
A geologic assessment and stability analysis of the right abutment of Boundary Hydroelectric Dam in Pend Oreille County, Washington was completed in May 2017. The stability analyses identified a poten
-
Hudson’s Revitalization: The Use of Robotics in the Work PlaceBy Dave P. DeClerck
Hardman Construction was faced with the challenge of completing a large earth retention project on a constricted downtown Detroit site, while maintaining a safe and productive worksite. To do so, new
Jan 1, 2019