The Test on Effect of Polyanionic Cellulose on Process of Filtrate Loss of Low Solid-Phase Drilling FluidBy Ping Yang, Tian-bin Li, Min-hui Wu
"The process of filtrate loss of low solid-phase drilling fluid at different content of polyanionic cellulose is investigated by the standard filtration test. The test results showed that when time of
Jan 1, 2017
-
Construction Of The Main Tower Pier Caissons For The Greenville Bridge In MississippiBy F. Keith Jacobson
To be involved in the construction of a deep dredged caisson for a major bridge pier is one of the most rewarding and professionally challenging experiences one can have in the bridge construction bus
Jan 1, 2013
-
Micro-Biological Attack On Deep Foundation ConcreteBy Piotr D. Moncarz
As major urban areas begin to run out of "good-terrain" for their expansion, they begin to claim high water-table areas within or adjacent to water fronts or swamps. Similarly, major infrastructure pr
Jan 1, 2002
-
Cape Wind Offshore Wind Farm – Electrical Service Platform – Substructure Jacket DesignBy S. Chilka, I. Maloney, J. Brady
"The purpose of this project was to design the Electrical Service Platform (ESP) for the Cape Wind Offshore Wind Farm. The ESP structure comprises two primary parts: the topside platform housing the e
Jan 1, 2017
-
Double Rotary Head Piling Systems (Cased CFA)By Franz-Werner Gerressen
In the changing construction environment clients are searching for new technology to complete their projects in shorter times. Manufacturers are therefore developing solutions to speed up established
Jan 1, 2009
-
Building Drilled Shafts to Bridge the MississippiBy Brian Koch
Michels installed 242 drilled shafts to support the piers for a new basket-handle, true-arch twin bridge across the Mississippi River from Moline, IL to Bettendorf, IA. The installation of the drilled
Jan 1, 2019
-
Mindful Monitoring Of A Variable Excavation Support SystemBy B. Philip Shull, Allen W. Cadden, Johanna M. Simon, Michael S. Senior
A 670 linear meter (2,200 linear foot) large-diameter sanitary sewer interceptor installation at depths ranging from 3 to 10 m (10 to 30 ft) below existing grade in an area with a high water table req
-
Construction Induced Vibration during Sheet Pile and Pile Driving in Deep ExcavationBy Ambarish Ghosh, Subhaprasad Chakraborty
"Construction of basement floors has become necessary to meet the requirement of parking in office and residential complexes and in hospitals for radiotherapy treatment. Important projects coming up i
Jan 1, 2015
-
Time-Dependent Increase In Load Capacity Of Tapered PilesBy Jeongbok Seo
This paper describes successful application of driven tapered-steel-pipe piles for two large-scale projects in the New York metropolitan area: Rego Park Mall, Rego Park, N.Y. and 164 Kent Avenue, Broo
Jan 1, 2008
-
Sonar Calipering Of Slurry Constructed Drilled Shafts - Providing Quality Assurance And Quality Control In Deep FoundationsBy Denton A. Kort
Historically the visual examination of drilled shafts to determine shape was typically done under dry conditions. Many engineers believe that by using a dry method of construction, the question of sha
Jan 1, 2007
-
Skin Friction In Shale: Results Of The Hwy. 81 Bridge, Yankton, SD Drilled Shaft Load TestBy Scott M. Mackiewicz
This project includes replacement of the historic vertical-lift span Meridian Bridge (U.S. Highway 81 over the Missouri River) that connects Yankton, South Dakota with rural Cedar County, Nebraska. T
Jan 1, 2008
-
Underpinning System Based On Preloaded Micropiling For Construction Of Additional Underground FloorsBy Wolfram Groh
New underground floors comprising the complete footprint area of the building structure, were constructed under an existing building in sand, located in the Verdun district of Beirut / Lebanon. The wo
Jan 1, 2002
-
Installation Checklist For Driving Mega PilesBy Douglas L. Scaggs
Over the past several years, pile foundations have grown to meet the demands of larger and heavier structures. As the foundations have grown, so has the need for larger and more robust piles to carry
Jan 1, 2013
-
Shear Walls Used For Liquefaction Stabilization Of Earthen Dam EmbankmentsBy Peter J. Nicholson
Recognition of the liquefaction susceptibility of dam embankments has been heightened since the San Fernando Dam near failure incident in 1971. Both the downstream and upstream slopes of dams can be
Jan 1, 2008
-
Underwater Sound Attenuation In Construction Projects: Applying Science To Pile Driving PermitsBy Alan Christopherson
Nearshore construction projects often require installation of steel piles and specific methodologies of installing piles may adversely affect nearby species of concern. Water is an uncompressible med
Jan 1, 2013
-
Underpinning And Micropiling To A Four Storey Apartment Building In Hamilton, ScotlandBy Clifford J. Wren
A geotechnical foundation solution was required to halt and prevent further structural distress suffered by a residential four storey apartment building in Hamilton, Scotland. Residents of the ten ye
Jan 1, 2008
-
The Monroe St. Viaduct: A Case History Of MSE Vibro-Concrete Column Supported EmbankmentBy Paul J. Lewis
Replacement of the Monroe Street Viaduct in southwest Baltimore City, Maryland included transforming 240 feet of the south approach from a pile-supported multi-span bridge to a mechanically stabilized
Jan 1, 2007
-
A New Design Method For Drilled Shafts In Rock ? SynopsisBy Chris M. Haberfield
The design of side resistance of drilled shafts socketed into rock has traditionally been empirically based on the results of pile loading tests in which the side resistance can be isolated from the s
Jan 1, 1996
-
Design And Analysis Of Cooling Tower Pile FoundationsBy Michael W. Oakland
This paper summarizes the analysis and design of a pile foundation system for two 400 ft. diameter, 500 ft. high cooling tower using a detailed finite element analysis package. The cooling towers are
Jan 1, 2010
-
Large Diameter Pile Driving, Acceptance And Soil-Pile Setup New East Span San Francisco-Oakland Bay BridgeBy Saba Mohan
This study presents results based on the Pile Installation Demonstration Project (PIDP) that was conducted as a part of the East Span San Francisco-Oakland Bay Bridge Seismic Safety Project. For the t
Jan 1, 2002