Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    Session 15 "Jet Grouting IV"

    By Mitsuhiro Shibazki

    I can't answer that question but I am looking at Andy, my co-author, and he says we didn't measure it. No movement. If I understand it correctly, how do we handle lateral forces in shear? T

    Feb 10, 2003

  • DFI
    Tomographic Dst Algorithm For Stone Column Site Imaging And Characterization

    By Gerald Verbeek, Erick Baziw

    Stone columns are used in geotechnical site remediation to increase load-bearing capacity and reduce settlement of foundations. Stone columns also improve slope stability and increase the shear streng

  • DFI
    Characteristics And Application Potentials Of Ground Improvement With Semi-Rigid Inclusions Based On An Innovative Composite Of Polymers And Gravel

    By Pratter P., Boley C.

    Polymers are well established in geotechnical applications, for example in ground improvement, where the polymers act as a binder that, when cured, holds the grains together by adhesive and cohesive f

    May 1, 2022

  • DFI
    Drilling And Grouted Pipe Pile Foundation For Department Of Energy Spallation Neutron Source Target Building, Oak Ridge, Tennessee ? Introduction

    By Ronald E. Walkington

    The U.S. Department of Energy (DOE) is building the world's newest accelerator-based, pulsed-neutron system, called Spallation Neutron Source (SNS). The facility, located in Oak Ridge, Tennessee,

    Jan 1, 2001

  • DFI
    Effect of Free Standing Height on Rock Socketed Pile under Lateral Load

    By Prakash Annamalai Rangasamy, Muthukkumaran Kasinathan

    "Infrastructure development like elevated expressways, metro train and flyover are required proper foundation system to carry heavy traffic loads/significant lateral load, especially in the presence o

    Jan 1, 2015

  • DFI
    Non-Destructive Testing Methods for Drilled Shaft and ACIP Piles (34748882-cb96-4081-9967-58c48901bc15)

    By George Piscsalko

    "Quality control of drilled shafts and ACIP piles is greatly dependent upon the practices of the site personnel. In many applications it is difficult to properly inspect the shaft prior to concreting,

    Jan 1, 2017

  • DFI
    Engineering Foundation Support For Las Vegas Strip's Tallest Hotel Casino

    By Nicholas P. Gura

    This paper presents the analysis, design, and load test program results for drilled shafts to support a 70-story hotel tower and associated 10 story podium structures located in Las Vegas, Nevada. A

    Jan 1, 2007

  • DFI
    Numerical Analysis of Mono and Group Suction Piles under Lateral Loadings in Layered Deposits (6db428d8-c029-43b4-b834-4c0cdce8dd47)

    By Ilhan Chang, Ernest Nsabimana, Kiseok Kwak, Juhyung Lee, Young-Hoon Jung

    "Numerical analyses were performed to analyze the behavior of two different type of suction piles (mono type and group type) under various soil layer conditions (uniform silty clay layer, uniform silt

    Jan 1, 2017

  • DFI
    Dynamic Load Testing Of Augered Cast-In-Place Piles (Rausche)

    By Frank Rausche

    The more widespread use of Augered Cast-in-Place (ACIP) Piles has generated increased demand for improved quality control measures. These deep foundation elements are often relatively long and slender

    Jan 1, 2001

  • DFI
    Soil Mixing Treatment of Marginal Soil for Railway Construction and Maintenance

    By Charles M. Wilk

    "Mass stabilization involves mixing binding agents into marginal or contaminated soil to improve the subject material’s physical and/or chemical properties. This paper concentrates on the principles o

    Jan 1, 2017

  • DFI
    Seismic Design for the I-30 Crossing Project in Little Rock, Arkansas

    By David S. Graham, Benjamin Turner, Paul J. Axtell

    Seismic challenges were at the forefront of design for two parallel replacement bridge structures over the Arkansas River as part of the I-30 Crossing Project in Little Rock, Arkansas. Although not an

    Sep 8, 2021

  • DFI
    The Geology Of South Florida With Emphasis On Deep Foundations

    By Edwin W. Hickey

    This paper briefly discusses the geologic conditions in South Florida relative to the design, construction, and performance of deep foundations. The subsurface conditions in this area are unique in th

    Jan 1, 2003

  • DFI
    Construction Of The Drilled Shaft Foundations For The Huey Long Mississippi River Bridge, New Orleans

    By Dan A. Brown

    The foundations at the Huey P. Long Bridge in New Orleans presented special challenges for construction due to the requirements for very deep drilled shafts in the Mississippi River beneath the existi

    Jan 1, 2010

  • DFI
    Practice Of Arranging Drilling Piles In Subsiding Grounds

    By Vladimir M. Korolev

    The field studies conducted at the experimental-production sites allowed to develop the technology of arranging drilling piles in loess subsiding grounds over 25 m deep and over 250 mm in diameter, to

    Jan 1, 2002

  • DFI
    Non-Destructive Testing Methods For Drilled Shaft And Acip Piles (6922d0e7-932e-4be1-a810-c6fa95777bc9)

    By George Piscsalko

    Quality control of drilled shafts and ACIP piles is greatly dependent upon the practices of the site personnel. In many applications it is difficult to properly inspect the shaft prior to concreting,

  • DFI
    Soil Mixing Treatment of Marginal Soil for Railway Construction and Maintenance (8f2b4a54-c8f3-43f2-a476-24a3cd46424e)

    By Charles M. Wilk

    "Mass stabilization involves mixing binding agents into marginal or contaminated soil to improve the subject material’s physical and/or chemical properties. This paper concentrates on the principles o

    Jan 1, 2015

  • DFI
    Proposed Micropile Section for the 2006 IBC

    By Lawrence F. Johnsen, Marc J. Gallagher

    "Micropiles are small diameter, bored, grouted-in-place piles incorporating steel casing and/or reinforcements. The omission of micropiles from most United States building codes has resulted in the ap

    Jan 1, 2005

  • DFI
    Innovative Grouting Techniques for Installation of a Seepage Barrier at Barrage Des Quinze Dam (Quebec, Canada)

    By Danny Déry-Chamberland, Peter Bowman, Michael Byle

    "The Barrage des Quinze dam is a concrete sluice dam consisting of 19 spillway sections, each of which is approximately 7.6 metres wide and 14.5 metres deep. Rehabilitation efforts being performed on

    Jan 1, 2016

  • DFI
    Woodrow Wilson Bridge Cofferdams

    By Roderic A. Ellman

    The new Woodrow Wilson Bridge (WWB) will replace the existing bridge over the Potomac River to connect Alexandria, Virginia to Prince Georges County, Maryland. The new WWB will extend approximately 1.

    Jan 1, 2005

  • DFI
    Lessons Learned From Mitigating Early Project Delays To Deep Foundation Work

    By Jeffery L. Ottesen

    Early construction delays can jeopardize timely completion of subsequent work. As an early construction activity, and due to many unforeseen issues, deep foundation work inherently bears great potenti

    Jan 1, 2002