Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    Corrosion Protection Of Micropiles

    By Racquel Nottingham, Marc Mastrantuono

    Micropiles often provide a favourable solution for many deep foundation problems especially when significant site constraints such as confined construction sites or vibration limitations have been ide

    Oct 1, 2022

  • DFI
    Methods Of Dewatering And Ground Water Control ? Synopsis

    By J. P. Powers

    Methods for dewatering and the control of ground water for construction and mining are discussed, including open pumping; predrainage with deep wells, wellpoints or other systems; cutoff or exclusion

    Jan 1, 2010

  • DFI
    Replacement Bored Piles for the Houphouet-Boigny Bridge, Cote D'ivoire

    By Adrian Mercer, Ashkan Ameri

    Due to general degradation, increased traffic levels, and historical ground movement, this road and rail bridge which provides an essential link between the interior of the country and the Port of Abi

    Sep 8, 2021

  • DFI
    UHE Peixe Angical: Secant Cutoff Wall in Uncertain Geology

    By Dario Libano, Armando Caputo, Francisco Caputo

    "UHE Peixe Angical is a 452 MW hydroelectric power plant located on the Tocantins River in Tocantins, Brazil. In 1999, geologists began feasibility studies to estimate the river’s hydroelectric potent

    Jan 1, 2009

  • DFI
    Diplomacy And Innovation: Octakong And The Hong Kong-Zhuhai-Macau Bridge Project

    By David White

    When finished (projected completion in 2016) the Hong Kong-Zhuhai-Macau Bridge Project will comprise three cable-stayed span bridges and a 4.15 mile immersed tube tunnel - linking Hong Kong to Macau a

  • DFI
    Diplomacy and Innovation: Octakong and the Hong Kong-Zhuhai-Macau Bridge Project

    By David White

    "When finished (projected completion in 2016) the Hong Kong-Zhuhai-Macau Bridge Project will comprise three cable-stayed span bridges and a 4.15 mile immersed tube tunnel - linking Hong Kong to Macau

    Jan 1, 2017

  • DFI
    Vibration Isolation at the Dana-Farber Yawkey Center: OPA Finalist

    By David R. Shields, Michael T. Bracher

    "The $330 million (U.S.) Dana-Farber Cancer Institute’s Yawkey Center for Cancer Care (Yawkey Center) sits in the heart of Boston’s Longwood Medical Area. The Yawkey Center is a cutting-edge cancer ca

    Jan 1, 2012

  • DFI
    Construction Of Deep Foundations By Cast-In - Borehole Method

    By Y. W. Mou

    In order to improve the construction of pile foundations and deep foundations of largo sizes, the paper deals with the method of installing square or rectangular bored-piles for annular foundation as

    Jan 1, 2010

  • DFI
    Real Time Monitoring Of Utility Vaults during Reconstruction of the Elliot Bay Seawall

    By Pierre Gouvin

    "This paper discusses real time monitoring of utility vaults during the reconstruction of the Elliot Bay Seawall in Seattle. The project, undertaken because deterioration of the old wall posed increas

    Jan 1, 2017

  • DFI
    Application of Special Geotechnical Construction Equipment at the Alaskan Way Viaduct Replacement Project

    By Richard Hanke, Franz-Werner Gerressen

    "The twin decked Alaskan Way Viaduct is a passage to Seattle’s downtown waterfront and of great economic importance to the city. In 2001, the Nisqually earthquake damaged the viaduct and led to the re

    Jan 1, 2015

  • DFI
    A Case Study In Hand-Dug Caissons ? Synopsis

    Caissons hand dug to a depth of about 100 feet were used to underpin three important structures at an industrial site in the State of Utah. The caisson shafts extended through 30 to 40 feet of coarse,

    Jan 1, 2010

  • DFI
    Research On The Interaction Between Pile And Foundation Soil By Boundary Element Method

    By Wang Lushuang

    This thesis is devoted to the research of the interaction between pile and foundation soil by boundary element method (BEM for short). The interaction is simulated by the interaction between two diffe

    Jan 1, 1991

  • DFI
    Structure Monitoring During Underpinning

    By Barry C. Roth

    A Real Time Automated Remote Reading Electrolytic Tilt Monitoring System was effectively deployed for monitoring an existing five story brick building during underpinning, shoring and excavation opera

    Jan 1, 2007

  • DFI
    Performance-Based Reliability Design for Deep Foundations Using Monte Carlo Statistical Methods (aa702b6b-e181-4fa5-97b3-2e3a1ab7040e)

    By Haijian Fan

    Currently, deep foundation designs for the service limit state are deterministic in nature. The settlements and lateral deflections of deep foundations are calculated by means of numerical techniques

    Jan 1, 2017

  • DFI
    Risks Associated With Finite Element Modelling Of Cut And Cover Structures

    By Tony Suckling

    The commercially available finite element program Plaxis has a key benefit over other finite element analysis programs in that it has a relatively simple user interface to input and output data. This

    Jan 1, 2010

  • DFI
    San Francisco-Oakland Bay Bridge: OPA Winner

    By Gerry Houlahan

    "The 2015 Outstanding Project Award (OPA), which recognizes the superior work of DFI members, was awarded for the San Francisco- Oakland Bay Bridge New East Span. The award was presented to representa

    Jan 1, 2015

  • DFI
    A Proposal For Construction Of The Pile Load-Settlement Curve Based On Results Of Cone Penetration Tests ? Synopsis

    By A. Tejchman

    On the site of building of a new flyover founded on piles the comprehensive "in situ" investigations were carried out. The subsoil conditions under each of 15 supports were very differentiated. Using

    Jan 1, 2010

  • DFI
    Pier Design And Construction In Water Bearing Soils ? Synopsis

    By C. N. Baker

    The design and construction of drilled piers through water bearing and caving soil conditions are discussed. The need for close cooperation between the design engineer and contractor in both the desig

    Jan 1, 2010

  • DFI
    Professional Responsibilities In Sub-Surface Investigations For Foundations. - Introduction

    By D. J. Ketkar

    It is a frequent experience to find that the Sub-surface Investigation (S.I.) data is either inadequate or misleading. However, such cases are rarely reported. Nonetheless, the projects suffer on-acco

    Jan 1, 1996

  • DFI
    Piled Raft System - Approximate Design Methods. - Synopsis

    By S. L. Karunakaran

    There are cases where it is found that a raft foundation would have adequate factor of safety against ultimate bearing capacity failure but the settlements would be excessive. Piles may be introduced

    Jan 1, 1996