Design And Preliminary Investigations For Deep Foundations Of The Charleroi Locks River Wall Project, Monessen, PennsylvaniaBy Brian H. Greene
The U.S. Army Corps of Engineers, Pittsburgh District, is in the final phases of modernizing the locks and dams on the Monongahela River. One facet of this modernization is to replace the existing Lo
Jan 1, 2006
-
Recommendations For Implementing And Interpreting NonDestructive Integrity Testing Of Cast In-Situ Concrete Piles And Diaphragm Walls.By Jose L. Garcia
The following document aims to cover all issues concerning the three main methods employed for the in-situ survey of concrete pile integrity. Within it are described both sonic coring and low-stra
Jan 1, 2006
-
Davison Freeway Reconstruction Utilizes Design/Build Retaining WallsBy Thomas C. Anderson
Thirty-four retaining walls are part of the $46 million upgrade of a 1942 depressed highway in Highland Park, Michigan near Detroit. This project will close a missing link between two newer roadways,
Jan 1, 1999
-
A Contribution To The Behaviour Of Piled Raft FoundationsBy H. L. Jessberger
In recent years piled raft foundations of multi-storey buildings on weak soils have generated much interest and discussion. By taking account of the effects of each component of the system - the pile
Jan 1, 1991
-
Advances in Desaturation of Sandy Soil to Mitigate the Liquefaction HazardBy Dhanaji S. Chavan, Thallak G. Sitharam
"It is well known that sites comprising of saturated loose sand undergoes large deformations, due to liquefaction, during seismic shaking. To cope with this, different mitigation techniques such as vi
Jan 1, 2017
-
Influence Lines For The Pile Loading On Bridge Pier FoundationsBy M. B. Wechsler
An analysis is developed for determining the maximum loading, as well as the potential uplift of the piles on bridge pier foundations. There are considered piers supported on two through seven rows of
Jan 1, 1989
-
Bell Bottom Cast-In-Place Piling By Reverse Circulation Drill ? SynopsisBy T. Soejima
In recent years, there has been a tendency in the field of foundation piling works to utilize piles of greater bearing capacity in order to meet increasing height and weight of modern building as a me
Jan 1, 2010
-
Machine Foundation RepairBy Scott D. Thomson
The client for this project specializes in the use of state-of-the-art technology to fabricate and assemble composites and metal-bonded structures for commercial and military aircraft programs. One of
Jan 1, 2003
-
Bearing Capacity Of Piles Determined By Field Tests ? SynopsisBy D. M. Milovic
On the basis of relatively large number of field load tests of piles, the determination of the ultimate bearing capacity have been studied. Using the load settlement curves and the results of the cone
Jan 1, 2010
-
Compressibility Behavior Of Tropical Peat Reinforced With Cement ColumnBy Y. Duraisamy
This paper presents the compressibility of tropical peat reinforced with cylindrical cement column. When a cement column installed vertically in peat, its compressibility was reduced because of the ha
Jan 1, 2007
-
Piled Raft Design For High Rise Buildings In East London, UKBy D. P. Nicholson
The current phase of office development at Canary Wharf in the London Docklands includes twelve multi-storey buildings varying from eighteen to forty stories in height. The area of Canary Wharf South
Jan 1, 2002
-
Numerical Analysis of Pile-Supported T-Walls Subject to Large Settlements and Flood LoadingBy Alexander B. Reeb, Richard J. Varuso, George M. Filz, Jehu B. Johnson
"T-walls, which are concrete floodwalls in an inverted “T” shape, are an integral component of the Greater New Orleans Hurricane and Storm Damage Risk Reduction System (HSDRRS). In order to resist lar
Jan 1, 2017
-
Route 49 (Penns Neck Bridge) Over Salem RiverBy James E. Maccariella
Replacement of an existing movable bridge with a new low level fixed bridge would not accommodate potential future navigation traffic. In order to replace the existing bridge in a cost effective m
Jan 1, 2005
-
Design Of Drilled Pier In Expansive SoilsBy G. T. Hong
A numerical model for use in design is developed to predict the stresses and axial and bending displacements in a drilled pier in expansive soils. The prediction is based on the horizontal swelling p
Jan 1, 2007
-
Underpinning Of Buildings During Tunneling Los Angeles Metro Rail System - SynopsisBy John A. Dal Pino
This paper describes two independent building underpinning projects during the construction of the Los Angeles Metro Rail System. The first project involves pinpile underpinning of a building along th
Jan 1, 1996
-
The Effects Of Changes In Effective Stress On A Base Grouted Pile In SandBy V. M. Troughton
Large diameter bored piles with grouted bases have been adopted for the foundations of the majority of the buildings at Canary Wharf in London's Docklands, including a deep basement car park. The
Jan 1, 1989
-
Defective Piles In Clay - SynopsisBy S. Narasimha Rao
Bored cast in situ piles are highly susceptible to construction defects like necking, discontinuity in concreting, poor compaction of concrete, improper end bearing condition due to inadequate cleanin
Jan 1, 1996
-
Present Developments In The Design Of Deep FoundationsBy Rolf Katzenbach
The principle questions related to the design of deep foundations especially in soft soils are the stability and the cost optimised settlement reduction to prevent possible damages and to minimise the
Jan 1, 2006
-
Design And Construction Of Integral Drilled Shaft - Columns For The Boscawen-Canterbury BridgeBy Frederick C. Rhyner
Drilled shafts have become an economical foundation choice for bridges in the northeast United States, especially when they can be constructed over water without the use of cofferdams. For the Boscaw
Jan 1, 2004
-
Settlement Of A Building After Cutting Off Pile Tips Due To TunnellingBy Richard A. Forth
During the construction of the Island Line (ISL) in Hong Kong between 1982 and 1986 piled foundations of a building were encountered in a tunnel drive. As the tunnel alignment could not be changed wor
Jan 1, 2002