Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Cofferdam Failures ? IntroductionBy Richard J. Hartman
This presentation identifies some of the more common problems associated with cofferdam construction. After the various problems are identified, they are briefly explained and possible solutions and p
Jan 1, 1987
-
Analysis of Structural Capacity and Stiffness of Drilled Shafts with Construction Defects and RepairsBy John P. Turner, Benjamin J. Turner
"Non-destructive testing and evaluation (NDT/NDE) methods have become standard tools as part of the post-construction quality assurance of drilled shaft foundations. In responding to anomalies, founda
Jan 1, 2016
-
Design And Application Of Vertical Micropiles To Resist Large Lateral LoadsBy Helen D. Robinson
Traditional practice to resist large lateral loads on foundations is the use of large diameter caissons, battered driven piles, or battered micropiles. Dense urban construction environments, however,
Jan 1, 2010
-
An In-Situ Model Test For A Large Hydraulic Press Foundation ? SynopsisBy R. J. Yan
There was a plant equipped with a 32000t Hydraulic Press to be built, under which a box foundation of 22.5m x 15m x 14.25m (depth) with a base slab of, varying thickness was proposed. The subgrade rea
Jan 1, 2010
-
A Soil Quake Davisson Offset Method For Drilled FoundationsBy Michael Perlow Jr
A modification of the original Davisson Offset Limit (DOL) is presented for drilled foundations using soil quake (QDOL) factors ranging from 2 to 6. A further modification of the Davisson Offset Limit
-
High Strain Testing Of Augered Cast Piles At Miami Fort Power StationBy C. Michael Morgano
Static tests are costly and time consuming, so they are not always the best answer [ ]
Jan 1, 2005
-
Sharing of Lateral Loads and Moments in Pile FoundationsBy Andrea Gambi, Giancarlo Olivucci, Maurizio Lenzi
"In the paper a criterion for the evaluation of the sharing of the lateral loads in a piled foundation is presented. It relies on the the compatibility condition between the rotation of the rigid pile
Jan 1, 2005
-
Cooling Water Intake Shafts for the Oak Creek ExpansionBy Edward Jacobsen, Patrick J. Lydon
"The ongoing expansion of the Oak Creek Power Plant in Oak Creek, Wisc., includes a tunnel bored in rock that connects to four vertical intake shafts approximately 1.5 miles (2.4 km) offshore in Lake
Jan 1, 2008
-
Cockatoo Island Seawall Seepage BarrierBy Chris L. Powell, Russell J. Denny
"The remotely located Cockatoo Island iron ore mine off the Kimberley coast in the northwest of Western Australia has been in operation since 1951. The mine was recently expanded up to about 50 m (165
Jan 1, 2017
-
“Special Application Of Micro-Piles” For The Construction Of A Bridge Well FoundationBy Nagarajkumar BV
Pavai-and TeampT JV started working on the project T49A, Sumbar J & K State as part of slope and earth stabilization for ongoing Banihal - Katra Railway Connection Project. This project has several tu
Nov 1, 2022
-
Cockatoo Island Seawall Seepage Barrier (b791f2b4-d692-4b8a-afba-0ecd9b385be1)By Chris L. Powell, Russell J. Denny
"The remotely located Cockatoo Island iron ore mine off the Kimberley coast in the northwest of Western Australia has been in operation since 1951. The mine was recently expanded up to about 50 m (165
Jan 1, 2017
-
Deep Mixing Technology: Comparison between Laboratory and Field Test Result, Different Jobsite Application.By Alessandro Bertero, Stefano Valagussa, Filippo Maria, Wesley Schmutzler, Leoni
"Abstract The Deep Mixing Method (DMM) represents a viable solution to improve the adverse geotechnical properties of foundation soils. Differences and the importance of performing pre-construction la
Jan 1, 2014
-
Response of Pile and Pile Groups against Excavation Induced Ground MovementBy K Ilamparuthi, R. K. Madhumathi
"This paper presents the results of 1g model tests conducted on model piles both single and two pile groups embedded in sand by physically inducing lateral soil movement. From the test results it was
Jan 1, 2015
-
House & Commercial Building Foundation - Introduction & HistoryBy Roger A. Bullivant
As the UK's foremost domestic foundation underpinning contractor over the last 25 years it has become abundantly clear that the size of the repair market, some £500m per annum is a significant wa
Jan 1, 1995
-
Information Technology And Monitoring - Technologies De L'Information Et Monitoring - Innovations In Diaphragm-Wall Construction PlantBy Maurice Guillaud
The most striking innovations on diaphragm-wall construction plant are those associated with continuous real-time trajectory monitoring of the excavating tool (either a grab or a hydro-cutter). Th
Jan 1, 2002
-
Estimation Of Modular Ratio And Modulus Of Deformation Of Granular Piles From In-Situ Compression TestsBy Padmavathi V, M. Najamuddin, M. R. Madhav
Granular piles are one of the leading ground improvement techniques, adopted for the betterment of bearing capacity and reduction in settlements of the foundations and also to accelerate consolidation
Sep 1, 2022
-
Cost Effective Drilling Of Extra Large [XL] Monopile FoundationsBy Phil Wilkinson, Sam Whitaker
"The installation of large (XL) diameter monopiles offshore typically requires expensive and specialist plant, equipment and vessels. Due to the increasing size (weight, diameter and length) of the fo
Jan 1, 2017
-
The Design of Partial Depth Cement Deep Mixing (CDM) Foundation for an Immersed TunnelBy J. S. Lee, R. K. Massarsch
"A 3.2 km long immersed road tunnel forms part of the Busan-Geoje Fixed Link in South Korea, which connects Korea's second largest city Busan, with the island of Geoje. To ensure the water tightness o
Jan 1, 2015
-
Augered Cast-In-Place Piles Quality ControlBy Rudolph P. Frizzi
The current trend of increasing augered cast-in-place (ACIP) pile diameter, length, and load carrying capacities demonstrates improvements in installation equipment, increased acceptance, and that qua
Jan 1, 2001
-
Contactless Anchor Measurement with Elastomagnetic SensorsBy Damir Dedic, Wörle. Patrick
"Soil properties within a construction project area are analyzed during the planning phase. However, it is only possible to achieve selective soil exploration, even in the case of very extensive inves
Jan 1, 2017