Recent Experiences With Optical Fibre Monitoring Of Geotechnical StructuresBy Gust Van Lysebetten, Monika de Vos
The objectives of monitoring geotechnical structures can be very diverse, including optimisation of the design, quality control, long term performance assessment, and approval of innovative execution
May 1, 2022
-
The Use of Vibratory Driving of Foundation Piles for Offshore Applications - State of the PracticeBy Nicolas Moscoso, Gerald Verbeek, Marcel Bielefeld, Rob van Dorp
Upon recently, most offshore foundations were based on a number of driven piles that were installed with an impact hammer. With the increase in offshore windfarms two major developments have occurred:
Jan 1, 2019
-
Building The Devil’s Playground: How a Ground Improvement Program Eliminated the Need for Pile FoundationsBy Christian B. Woods, Joe C. Drumheller
"Kenneth A. Huber, P.E., Langan Engineering & Environmental Services, New York, New York, USAThe dream to bring New Jersey Devils hockey to the largest city in New Jersey became a reality in the summe
Jan 1, 2015
-
Arctic Emergency Operation: Deception Bay RehabilitationBy Jeff Starchuck, Harald Kullmann
"In 2005, an inspection showed that the Deception Bay Wharf in the Canadian Arctic was at the end of its service life. Although Deception Bay is closed with landfast ice up to 5 ft thick, shipping ope
Jan 1, 2009
-
Times Square Tower: Urban SqueezeBy Tony D. Canale, Anthony Mazzo
"Times Square, arguably one of the best-known destinations in the world, has undergone and continues to undergo a re-development aimed at attracting corporate tenants to the area. Mueser Rutledge Cons
Jan 1, 2005
-
Application Of Deep Mixing And Stone Column Techniques For Stabilization Of Large Earth Cum Rock Fill (Ecrf) Dam For An Irrigation ProjectBy Cemal Can Maslak, Vijaya Bhushan Rao, Vidyaranya Bandi, Karsten Beckhaus
A Large Earth Cum Rock Fill, ECRF Dam is under construction at Polavaram in the state of Andhra Pradesh in India as part of an irrigation project. The Embankment crest width of the dam is 12.5m and ba
Sep 1, 2022
-
Deep Drilled Shafts For The Pearl Harbor Memorial Bridge New Haven, ConnecticutBy Theodore von Rosenvinge
Large diameter (2.4 meter) drilled shaft foundations were installed to depths of over 62 meters through soil into Arkose bedrock for Connecticut?s Pearl Harbor Memorial Bridge (I-95 over New Haven Har
Jan 1, 2011
-
The Road to Innovation in Geotechnical Construction (f2290583-6329-4b39-a4c9-b746aba3a1f4)By Peter J. Nicholson
"IntroductionDuring my more than 40 years in the practice of underground construction and engineering, the industry has seen progress from the dig down to rock or hardpan or alternatively drive concre
Jan 1, 2017
-
Comparison of Load Test Results between ACIP Piles Installed in Sand in Pre-Drilled Holes versus Conventional InstallationBy Tracy Brettmann, Shailendra Endley, Jason Leary, Shashank Valluru
"Augered Cast-in-Place (ACIP) piles have long been used for deep foundation support in sands due to their high capacity and speed of installation. Very little information exists on the effects on capa
Jan 1, 2017
-
Wrigley Field – The 1060 ProjectBy Darren S. Diehm
"Construction for the restoration and expansion of 102-year-old Wrigley Field in Chicago, Illinois began at the conclusion of the 2014 baseball season. This six year project involves structural upgrad
Jan 1, 1900
-
Analysis of Load Transfer along Large Diameter Bored Piles in Very Dense SandsBy Nabil F. Ismael, Khalid Farraj
"The axial load transfer along large diameter bored piles in very dense silty sand was examined by field tests. Two instrumented piles 1.2 m diameter and with embedded length of 18 m and 25 m were loa
Jan 1, 2017
-
Session 32 "Grout Mixtures and Materials 3"By Lois G. Schwarz
I did a project (Sungai Piah) as a consultant to your firm in Malaysia, where we were faced with a similar situation as sketched out in your question. The following is what we did for the grouting of
Feb 10, 2003
-
The Use of Thermal Integrity Profiling (TIP) to Verify the Integrity of Deep FoundationsBy Beim Jorge, Piscsalko George
"Verifying the quality of cast-in-place foundation applications, particularly those cast under slurry, is of course important, due to its great dependency on the methodology employed and on the practi
Jan 1, 2015
-
Effect of Electrokinetics on Pullout Resistance of Sheet Pile WallsBy Antonio Kodsy, Lutful Khan
A research was carried out to test the possibility of reducing the pullout resistance of metal sheet piles driven in clay soils using Electrokinetic (EK) conditioning. The hypothesis was applying an e
Jan 1, 2019
-
Selmon Expressway, Tampa: Case History of Drilled Shaft Design for Extreme VariabilityBy Ross T. McGillivray, David S. Graham, Dan A. Brown, Steven D. Dapp
"The Selmon Expressway includes an elevated structure extending across several miles of weathered karstic limestone geology, and represents a challenge for design because of the high variability of th
Jan 1, 2015
-
Numerical Modeling Of Dynamic Soil-Structure Interaction In Bridges With Hp Driven PilesBy Tu Bao
HP-Pile foundations are the most favorable type of foundations for bridges because of their constructability, versatility with regard to subsoil conditions, and settlement controllability. For many
-
Numerical Modeling of Dynamic Soil-Structure Interaction in Bridges with HP Driven Piles (47ff630e-35bf-41f4-946a-236631b70ac5)By Andrew Rietz, Yu Bao, Steven Halewski
"HP-Pile foundations are the most favorable type of foundations for bridges because of their constructability, versatility with regard to subsoil conditions, and settlement controllability. For many y
Jan 1, 2017
-
Determining Length Of Pile Foundation By Analyzing Response To Lateral Hammer ImpactBy Vivek Samu, Murthy Guddati
A new method called Effective Dispersion Analysis of Reflections (EDAR) was recently developed to effectively analyze the dispersive waves generated from lateral impact to piles. This paper presents t
-
Ultimate Lateral Resistance of Piles in Cohesive SoilBy Lassaad Hazzar
The ultimate lateral resistance of piles in cohesive soil is studied using the well-known finite difference code, FLAC2D. The Modified Cam Clay (MCC) constitutive relation is adopted in the analyses t
Aug 1, 2013
-
Selection And Quality Control Of Deep Foundations At Ontario Hydro's Darlington Nuclear Generating Station - SynopsisBy F Debidin
The progressive rise of an H-pile during driving of an adjacent pile is described in this case history in which piles 15 to 18 m long were driven to end-bearing for the foundations for a 230 m long bu
Jan 1, 2010