Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Monitoring Subsidence In The West: Problems And AnalysisBy John E. Rourke, O&apos
This paper describes some of the results of a project for the design and demonstration of subsidence monitoring systems for underground coal mines. The project was designed to test monitoring systems
Jan 1, 1982
-
Technology for In Situ Uranium LeachingBy David Baughman, Steven Axen, Ray V. Huff, Donald H. Davidson
Introduction In situ leaching (ISL) is an alternative method of mining uranium from deposits that are low-grade, deeplying, and water-saturated. ISL recovers uranium by transporting fluids through
Jan 2, 1980
-
Stanford LCLS Project - Detailed Construction Design for the Intersection Between Access Tunnel and FEH CavernBy Heiner J. Sander
Stanford University operates the National Research Facility which is located at the Stanford Linear Accelerator Center (SLAC) in Menlo Park, California. In order to improve and allow for enhanced expe
Jan 1, 2008
-
Direct Pressure Alkaline Leaching of Scheelite Ores and Concentrates Mining, Metallurgy and Exploration (Springer)By António Fiúza, Anthony Danko, Patrícia Leitão, Aurora Futuro, Cristina Vila, Lurdes Dinis
The average global recovery rates for processing scheelite ores by physical methods are normally in the range 50 to 70%, and it is problematic to attain a minimum grade of 60% WO3 in the concentrates
-
Technology News - Air-Supported Conveyor Lowers Cost, Runs More SafelySeveral years ago, Hudco Industrial Products began experimenting with the idea of levitating a conveyor belt with a film of air, much like the puck on an air-hockey table. While conducting its resear
Jan 1, 2002
-
Portland, Oregon’s Other CSO TunnelsBy Michelle Lostra, Red Blanchette, Jan Babendererde, Greg Colzani
The City of Portland’s Westside CSO Project is constructing a deep tunnel system to reduce combined sewer overflows (CSO) from entering the Willamette River. Several kilometers of microtunneled pipeli
Jan 1, 2005
-
Operation of large underground fans at Kidd Mine ? progressing through the challengesKidd Mine in Northern Ontario is now producing from Stage 1 of the Mine D expansion project ? mining between 2100 m and 2700 m below surface. Planning for Stage 2 of the Mine D project is already well
Jan 1, 2009
-
North Carolina Famous For North America?s Largest EmeraldsBy Wade Edward Speer
The Hiddenite District of Alexander County, NC has produced some of the world?s finest large emeralds since the first one was discovered 134 years ago. In fact, North America?s largest emeralds come
Jan 1, 2009
-
Design Risk Mitigations for Contract CQ028 of the East Side Access ProjectBy Samer Sadek, David I. Smith, Wai-shing Lee, Jeffrey L. Rice, Avelino Alonso
INTRODUCTION East Side Access (ESA) Contract CQ028 is located in the New York City Borough of Queens. The contract involves construction of a 230-meter (760-foot) long open-cut excavation with a p
Jan 1, 2007
-
Construction of the Lewis Street CSO Tunnel, Nashville, TennesseeBy Patrick J. Doig
The Lewis Street CSO Tunnel is an important element in the efforts of the Metropolitan Government of Nashville and Davidson County (Metro) to improve the treatment of waste-water in the area. The t
Jan 1, 1997
-
A Life-Cycle Approach to Coal Resource Analysis: Examples From the Appalachian and Illinois Basins – Preprint 97-25By R. C. Milici
Historical production data and reserve decline rates can be used both to predict future coal production rates and to estimate when the reserve will be depleted. Reserve estimates inferred herein from
Feb 24, 1997
-
Planning and Fast Track Tunnel Design in Historical Downtown CharlestonBy James McKelvey, Larry Drolet, Jason Swartz
INTRODUCTION When divers discovered that sections of a tunnel housing the pipeline that conveys wastewater from the Charleston Peninsula to the Plum Island Wastewater Treatment Facility had caved
Jan 1, 2005
-
Practical Challenges For The Mine: Precious Metals Accounting And ReconciliationBy Will Jansen
When Enron rocked the United States with its Titanic-sized financial accounting scandal, miners and metallurgists were probably too busy on the mine sites in remote locations to wonder about its rippl
Jan 1, 2009
-
Copper Hydrometallurgy – Evolution and MilestonesBy Nathaniel Arbiter
In contrast to pyrometallurgy's 6000year history in metals production, hydrometallurgy is of relatively recent origin. The earliest reference to it was in the 16th century, with the first applica
Jan 1, 1994
-
Mine Wide Protection For Miners, Equipment And InfrastructureBy W. H. Schiffbauer
The protection of miners, equipment, and infrastructure is discussed. While the primary focus of the described technology is to prevent miners from being injured, struck-by, or crushed by heavy equipm
Jan 1, 2011
-
Good Times at Arizona Conference Are Tempered With Concerns For the FutureBy William M. Gleason
When SME’s 2006 Arizona Conference convened in December at the Hilton El Conquistador Resort in Tucson, AZ, there was considerable excitement among the 387 attendees. There was a noticeable buzz s
Jan 1, 2007
-
Considerations For Blending Low-Rank and High-Rank Coals – Preprint 97-15By O. Ogunsola, M. Downing
This paper gives a brief overview of impacts of coal blending on coal-fired power plants performance and discuses the preliminary results of an on-going study aimed at evaluating the effect of coal pr
Feb 24, 1997
-
Gold mineralization in porphyry copper deposits discussedBy David J. Lowell
The gold content of porphyry copper deposits ranges from less than 0.05 g/t to more than I g/t ((0.0017 to 0.035 oz per st) and the average is about 0.05 g/t (0.0017 oz per st) gold. Perhaps the highe
Jan 1, 1989
-
Precious metals exploration fails to makeup for declines in other mineralsBy E. D. Attanasi, J. H. DeYoung
Mineral exploration activity in the US suffered through another depressed year in 1984. And continued strength in precious metals (and possibly industrial minerals) exploration failed to make up for d
Jan 5, 1985
-
Exploratory Fea & Conceptual Design Findings Of Large Diameter Segmentally Lined ShaftBy D. Kruse
Top down constructed large diameter (up to 90 m [300 ft]) shaft design and constructability issues present an interesting suite of challenges and opportunities highlighted in this paper. The study cov
Jan 1, 2011