Search Documents

  • SAIMM
    Use of the DRA technique, porosimetry and numerical modelling for estimating the maximum in situ stress in rock from core

    By K. J. Oliver, A. G. Meyers, S. P. Hunt

    Deformation Rate Analysis (DRA) and porosimetry have been used to demonstrate the “stress memory” effect in rock and to estimate the vertical in-situ stress in samples of fine-coarse grained sandstone

    Jan 1, 2003

  • AIME
    Institute of Metals Division - Metal Crystal Orientation Using the Polarizing Microscope (TN)

    By H. D. Mellom

    The direction of the optic or "C" axis of a uniaxial metal crystal can be found with the metallurgical polarizing microscope by examining two planes of section on the crystal. Complete orientation of

    Jan 1, 1962

  • NIOSH
    MLA 31-83 - Mineral Investigation Of The Indian Heaven Rare II Area (No. 6076), Skamania County, Washington ? Summary

    By Donald J. Barnes

    There are no producing or developing mines in the study area. The only mineral production was stone from a basalt deposit near Indian View Point. Cinders and sand and gravel have been produced from de

    Jan 1, 1983

  • SME
    New approaches detailed for gold exploration in the Canadian shield

    By H. R. Butler, J. F. Church, A. T. MacGibbon

    Introduction Inco is the major North American nickel producer. Initially based in Sudbury, Ontario, its past exploration activity was directed toward finding new nickel deposits. New nickel sulfide d

    Jan 2, 1987

  • CIM
    New Technology Provides Expanded Mine Design Options

    By Michael J. Kelly

    IAMGOLD?s Westwood project is the site for the largest, by volume, bored vent raise in North America. When completed, it will be the fifth largest bored worldwide in a single pass. This paper will re

    Oct 1, 2010

  • NIOSH
    RI 2553 Gaseous Content Of Ground Waters As An Aid To The Petroleum And Natural Gas Prospector

    By E. P. Buxton, W. P. Yant, G. W. Jones

    "Introduction. The data obtained in recent research work by the Bureau of Mines show that the analysis of the gases dissolved in underground waters may be used by the prospector or geologist as an add

    Nov 1, 1923

  • NIOSH
    RI 7705 Autogenous Smelting Of Copper Sulfide Concentrate

    By Robert B. Worthington

    This investigation was undertaken to develop a more efficient copper smelting practice that would help meet the increasingly stringent antipollution standards. Continuous smelting to copper and a 0.8-

    Jan 1, 1973

  • IIMP
    Tecnología de la información aplicada a las observaciones preventivas - Caso Antamina

    By Víctor Siña

    El presente trabajo describe una alternativa de sistematización de las observaciones preventivas generadas en las áreas operativas de la minera Antamina a través del programa de Prevención de Riesgos

    Sep 9, 2007

  • DFI
    Deep Excavation In The Shanghai Soft Clay Under Protection Of A Cast-In-Situ Retaining Wall ? Synopsis

    By M. Pernot

    A 12 m-deep excavation has to be perfomed in the Shanghai soft clay to install an underground electric substation. This article was originally intended to study the behaviour of the wall, the excavati

    Jan 1, 2010

  • ISEE
    Explosive Operations and its Regulation in the Gulf of Mexico

    By D. J. Leidel

    The offshore production of oil and gas resources has been active in the Gulf of Mexico since Kerr- McGee drilled the first commercial well out of the sight of land in 1947. Since then, approximately 6

    Jan 1, 2002

  • TMS
    Process Metallurgy An Enabler Of Resouce Efficiency: Linking Product Design To Metallurgy In Product Centric Recycling

    By Markus Reuter, Antoinette van Schaik

    In this paper the link between process metallurgy, classical minerals processing, product centric recycling and urban/landfill mining is discussed. The depth that has to be achieved in urban mining an

    Jan 1, 2014

  • AUSIMM
    Underground Mining at the Golden Cross Mine

    The modern Golden Cross mine entered the production phase in January 1992. The project is designed to produce over 100 000 oz/yr of gold and over 300 000 oz/yr of silver during a mine life of eight ye

    Jan 1, 1994

  • METSOC
    Risk Weighted Cash Flow, A Communication Tool For Engineers And Financial Professionals On New Technology Projects (d41d36b5-72c1-4d61-8c6a-fe26069e74d8)

    By Mark Kennedy

    New technology projects, particularly those involving first-of-a-kind metallurgical facilities, have a poor track record of achieving their overall financial targets, as they incorporate technological

    Jan 1, 2013

  • AUSIMM
    The Harmonious Design on the Beneficiability for the Pt-Pd Ores Containing High MgO Gangue in Yunnan

    The Harmonious Design on the Beneficiability for the Pt-Pd Ores Containing High MgO Gangue in Yunnan

    Sep 13, 2010

  • CIM
    Magnetic Conditioning of Sphalerite at Red Dog Mine

    By B Lumsden, B Lacouture

    "Red Dog is one of the largest zinc mines in the world both in terms of reserves and annual production. In 2013, Red Dog produced 551,300 mt of contained zinc and 96,700 mt of contained lead. The mine

    Jan 1, 2016

  • ISEE
    Tunnel Excavation on the Abutment of an Existing Dam

    To meet the energy requirements, hydroelectric projects are planned and executed in many countries. Though these projects requires a high capital investment, the returns are regular with minimum maint

    Jan 1, 2016

  • SME
    Injury Prevention: Dependent, Independent, And Interdependent

    By D. E. Poole

    Injury Prevention: Dependent, Independent and Interdependent In recent years, management-directed (dependent)safety programs have lost ground to the more successful self-directed (independent) prog

    Jan 1, 2000

  • SME
    The Utilization Of Coarse Pre-Concentration Rejects In The Preparation Of Underground Backfills At Xstrata Nickel?s Ontario Operations

    By T. Weatherwax

    As part of a strategic research initiative at UBC to design and evaluate integrated underground mining and mineral processing systems, work has been done to determine how to utilize the coarse rejects

    Jan 1, 2008

  • DFI
    Caisson Design And Construction Challenges On The New Tiger Stadium Project - Summary

    By Fritz J. Klingler

    From site demolition, to design, to construction, Detroit's new Tiger Stadium project is required to be completed within a short 2 ½ years from award of the design-build contract. Such extreme sc

    Jan 1, 1999

  • SME
    Connectionist Approach For Modeling The Dry Roll Magnetic Separator

    Magnetic separation is an age-old technique for mineral beneficiation operations. The existing mathematical models for magnetic separators are quite complicated, and it is very difficult to measure th

    Jan 1, 2009